Emanuel F.
Engineer Coordinator at Excell Communications- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Native or bilingual proficiency
-
English Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Engineer Intern
Florida Board of Professional EngineersApr, 2018- Nov, 2024 -
Engineer in Training
Professional Credential Services, Inc.Feb, 2018- Nov, 2024
Experience
-
Excell Communications, Inc.
-
United States
-
Telecommunications
-
100 - 200 Employee
-
Engineer Coordinator
-
Apr 2019 - Present
- Coordinate visits to cell sites with the fiber provider and client (ex. Verizon) - Analyze existing underground utility records, utility maps, and plat maps - Research and evaluate route options for proposed dark fiber for future 5G network - Prepare engineering field notes and sketches of proposed route - Design the proposed dark fiber route from the right of way to the cabinet or shelter using AutoCAD format from field notes and sketches - Develop fiber design package with… Show more - Coordinate visits to cell sites with the fiber provider and client (ex. Verizon) - Analyze existing underground utility records, utility maps, and plat maps - Research and evaluate route options for proposed dark fiber for future 5G network - Prepare engineering field notes and sketches of proposed route - Design the proposed dark fiber route from the right of way to the cabinet or shelter using AutoCAD format from field notes and sketches - Develop fiber design package with scope of work for landlord approval - Complete tracking reports for all changes with a tracking sheet on a daily basis Show less - Coordinate visits to cell sites with the fiber provider and client (ex. Verizon) - Analyze existing underground utility records, utility maps, and plat maps - Research and evaluate route options for proposed dark fiber for future 5G network - Prepare engineering field notes and sketches of proposed route - Design the proposed dark fiber route from the right of way to the cabinet or shelter using AutoCAD format from field notes and sketches - Develop fiber design package with… Show more - Coordinate visits to cell sites with the fiber provider and client (ex. Verizon) - Analyze existing underground utility records, utility maps, and plat maps - Research and evaluate route options for proposed dark fiber for future 5G network - Prepare engineering field notes and sketches of proposed route - Design the proposed dark fiber route from the right of way to the cabinet or shelter using AutoCAD format from field notes and sketches - Develop fiber design package with scope of work for landlord approval - Complete tracking reports for all changes with a tracking sheet on a daily basis Show less
-
-
-
Tesinc, LLC
-
United States
-
Telecommunications
-
1 - 100 Employee
-
OSP Engineer
-
Jun 2018 - Present
- Conduct existing OSP facility and right of way research in respect to developing construction plans for new fiber cable placement/path - Access public records and databases necessary to the completion of the development of construction plans for the proposed fiber cable placement/path - Research and complete right of way permit applications for road easements and crossings, railroad crossings, or any other domain encountered by the proposed cable path - Research and… Show more - Conduct existing OSP facility and right of way research in respect to developing construction plans for new fiber cable placement/path - Access public records and databases necessary to the completion of the development of construction plans for the proposed fiber cable placement/path - Research and complete right of way permit applications for road easements and crossings, railroad crossings, or any other domain encountered by the proposed cable path - Research and evaluate various route options associated with the project for the proposed fiber cable placement/path - Design and prepare plans for the new fiber cable placement/path in AutoCAD format - Apply customer regulatory and customer construction standards to design installation/construction plans for fiber optic cables and associated OSP equipment (aerial, buried, underground). - Gather OSP Construction placement records necessary to complete as-built records for projects -Support closeout process as required to fulfill OSP Engineering responsibilities Show less - Conduct existing OSP facility and right of way research in respect to developing construction plans for new fiber cable placement/path - Access public records and databases necessary to the completion of the development of construction plans for the proposed fiber cable placement/path - Research and complete right of way permit applications for road easements and crossings, railroad crossings, or any other domain encountered by the proposed cable path - Research and… Show more - Conduct existing OSP facility and right of way research in respect to developing construction plans for new fiber cable placement/path - Access public records and databases necessary to the completion of the development of construction plans for the proposed fiber cable placement/path - Research and complete right of way permit applications for road easements and crossings, railroad crossings, or any other domain encountered by the proposed cable path - Research and evaluate various route options associated with the project for the proposed fiber cable placement/path - Design and prepare plans for the new fiber cable placement/path in AutoCAD format - Apply customer regulatory and customer construction standards to design installation/construction plans for fiber optic cables and associated OSP equipment (aerial, buried, underground). - Gather OSP Construction placement records necessary to complete as-built records for projects -Support closeout process as required to fulfill OSP Engineering responsibilities Show less
-
-
-
Zimmetry Environmental
-
United States
-
Environmental Services
-
1 - 100 Employee
-
Environmental Engineer
-
Jan 2018 - May 2018
- Conducted environmental site assessment projects - Conducted industrial hygiene, mold, asbestos, and lead-based paint surveys; and indoor air assessments - Assisted in Phase I Environmental Site Assessment - Prepared chain of custody for analytical testing, and recording survey data in approved forms - Completed reports about the surveys - Conducted environmental site assessment projects - Conducted industrial hygiene, mold, asbestos, and lead-based paint surveys; and indoor air assessments - Assisted in Phase I Environmental Site Assessment - Prepared chain of custody for analytical testing, and recording survey data in approved forms - Completed reports about the surveys
-
-
-
WSP
-
Canada
-
Professional Services
-
700 & Above Employee
-
Inspector
-
Oct 2017 - Dec 2017
- Coordinate and perform inspections on disaster affected houses - Coordinate and perform inspections on disaster affected houses
-
-
-
GSK
-
United Kingdom
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
Intern
-
Jun 2016 - Jul 2016
Novartis (Ex-Lax) - Analyzed the water stream balance to help the company improve their water use efficiency in there wastewater treatment plant - Performed calculations to estimate water consumption throughout the facility - Developed a plan for water conservation Novartis (Ex-Lax) - Analyzed the water stream balance to help the company improve their water use efficiency in there wastewater treatment plant - Performed calculations to estimate water consumption throughout the facility - Developed a plan for water conservation
-
-
Education
-
Polytechnic University of Puerto Rico
Bachelor of Science - BS, Environmental/Environmental Health Engineering