EMAD Al-sadder

Project Manager at AIMS
  • Claim this Profile
Contact Information
Location
Saudi Arabia, SA
Languages
  • Arabic Native or bilingual proficiency
  • English Full professional proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • IELTS
    IELTS BRITISHCOUNCIL
    Sep, 2018
    - Sep, 2024
  • Etabs
    Jordan Engineers Association, Engineers Training Center (ETC)
    Oct, 2013
    - Sep, 2024
  • Prokon
    Jordan Engineers Association, Engineers Training Center (ETC)
    Oct, 2013
    - Sep, 2024
  • AutoCAD Civil 3D
    Jordan Engineers Association, Engineers Training Center (ETC)
    Feb, 2012
    - Sep, 2024

Experience

    • Canada
    • Wellness and Fitness Services
    • 1 - 100 Employee
    • Project Manager
      • Dec 2022 - Present

      - Al-Subaie Palace Renovation (Formerly Prince Sultan Palace) in Al-Hada.- AL-shifaa resort construction and finishing.

    • Project Engineer
      • Jan 2021 - Nov 2022

      Al-Suhaimi Villa Compound:Finishing works of 4 villas, Rest house, Football field and Landscaping

    • Project Engineer
      • Sep 2021 - Mar 2022

      Aims VIP Regional Office Finishing and ID, and Tawaren Commercial Building renovation

    • Saudi Arabia
    • Construction
    • 400 - 500 Employee
    • Project Engineer
      • Jun 2018 - Dec 2019

      Development and constructing of four hotels ( HILTON Double Tree, HILTON Garden Inn, RADISSON BLU and RADISSON Park Inn ) which are located in the central area (city center) of Prophets Masjid in Medina, each hotel consists of THREE BASEMENTS + GROUND FLOOR+ MEZANINE FLOOR + 10 TYPICAL FLOORS + UPPER WATER TANKThe project includes several items:-Excavating for the level of -13m.-Shoring: using secant piles and sheet piles then prestressed earth anchors.-Dewatering.-Isolating the ground using water proof materials.-The hotels foundation type is raft foundation.*Also working as:- Technical engineer.- Quantity surveyor.- Writing letters.- Making weekly and monthly reports.- Follow-up of official matters and attend meetings in government and service departments such as (Development Authorities, Municipality, Water+Sewer+Storm Departments, Electricity Company). Show less

    • Project Engineer
      • Oct 2018 - Nov 2018

      Renovation and maintenance for MINISTRY OF HOUSING Sales Hangar (SAKANI).

    • Project Engineer
      • Jul 2016 - May 2018

      Development of Al-nakheel(2) project which includes several items:-Building a Retaining Wall.-Mountains support using Rock bolt and shotcrete.-Earth work: filling and cutting (using explosives).-Infrastructure work: sewer, water, stormwater, medium voltage, telephone, street lighting and irrigation.-Subgrade and subbase.-Pavement.-medium voltage substations and lighting poles.-Curb and medians.*Also working as:- Technical engineer.- Quantity surveyor.- Writing letters.- Making weekly and monthly reports.**(Note: for more details please check the attached CV) Show less

    • Project Engineer
      • Aug 2014 - Jun 2016

      Development of DAR ALSALAM project which includes several items:-Earth work: filling and cutting (using explosives).-Infrastructure work: sewer, water, stormwater, medium voltage, telephone, street lighting and irrigation.-Subgrade and subbase.-Pavement.-medium voltage substations and lighting poles.-Curb and medians.Also working as a technical engineer.**(Note: for more details please check the attached CV)

    • Site Engineer/supervisor
      • Oct 2013 - Aug 2014

      supervising the construction of two buildings: 1) Al-nozha residential building: •Five story building with total area of 2500 square meters with a parking lot in the basement. •All floors consists of Composite slab reinforced with profiled steel decking. 2)Airport road commercial building: •Four story building with total area of 1500 square meter with a parking lot in the basement. •All floors consists of one way ribbed slab. **(Note: for more details please check the attached CV) Show less

Education

  • Jordan University of Science and Technology
    Bachelor's degree, Civil Engineering
    2008 - 2013