Elimar Salazar

Application Engineering Support at Startec Compression & Process and Startec Service
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Canada, CA
Languages
  • English Full professional proficiency
  • Spanish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • H2S Alive
    Enform

Experience

    • Canada
    • Oil and Gas
    • 100 - 200 Employee
    • Application Engineering Support
      • Jun 2019 - Present

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Intern-Department of Catalysis for Bitumen Upgrading
      • May 2015 - Aug 2015

      Developed of a novel thermal recovery technology for In Situ upgrading of bitumen and heavy oils using a trimetallic (Ni-Mo-W) ultra-dispersed catalysts suspended in Athabasca Vacuum Residue. • Designed, construction and operation of a bench scale unit to demonstrate if with the injection of Vacuum Residue + Catalyst will upgrade the Athabasca bitumen and Vacuum Residue• Gathered and processed pilot plant data to assess the effectiveness of the proposed method and catalyst to upgrade the Athabasca bitumen and Vacuum ResidueThe study demonstrated that the process was able to effectively increase the API gravity, reduce viscosity of the oil in place and upgrades bitumen to reach pipeline specifications.

    • Venezuela
    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer
      • Mar 2012 - Jan 2013

      Reviewed of engineering documents (P&IDs issued for construction, process description, operating manuals, vendor’s RFQ, BOM, etc.) for the Detail Engineering (PDVSA-Oriente Refinery – Expansion Harbour and Storage Capacity) and Basic Engineering (Jose Cryogenic Complex – Electric Emergency System), to comply with the design basis and criteria, and norms and procedures approved for the project• Reviewed scope for work, customer specification and PID’s to create BOM and technical proposal• Supervised and inspected the development of field work • Provided technical support to four interns assigned to the project, maintained design documents and ensured projects were delivered in accordance with engineering specifications• Performed energy and material balances, environmental evaluation and economic analysis • Established process design basis and criteria in conjunction with the client.• Engineering documents completed: H&MB, PFDs, P&IDs, Process Description, and Operating and Control Philosophies.• Review scope for work, customer specification and PID’s to create BOM and technical proposal

    • Venezuela
    • Oil and Gas
    • 1 - 100 Employee
    • Process Engineer
      • May 2006 - Feb 2012

      Project: Detail Engineering; Maturín Crude Pipeline. Puerto La Cruz Refinery (RPLC)-Maturín Distribution Plant (P/DM). Engineering and Construction Department-PDVSADeveloped of basic engineering of the POLIDUCTO RPLC-P / D MATURÍN (SISOR), a pipe with an approximate length of 204 km, from the Puerto La Cruz Refinery, located in Anzoátegui State to the Plant of Maturín Distribution, located in the city of Maturín of Monagas State, for the transport of white fuels (gasoline and diesel) in the East part of the countryProject: Basic and Detail Engineering; Gas Processing Plant - CADAFE-Guanta. PDVSA GASDeveloped of basic engineering with the purpose of increasing the consumption of 21.18 MMCFD to 84 MMCFD of the Guanta CADAFE plant, by incorporating two (2) new power generation turbines and the construction of a Gas Measurement and Regulation (EMR) Station for the effective supply of 84 MMPCED to 330 psig from the PDVSA GAS system, including its facilities for the supply, measurement, transmission and regulation of natural gasProject: Basic Engineering; Alternative Water through optic fiber metering system to the MORON Petrochemical Complex. PEQUIVEN, S.A. Developed of basic engineering of the Alternative Water Supply Project for the Moron Petrochemical Complex; An aqueduct with an approximate length of 13 km, located in the Limoncito sector in the Juan Jose Mora municipality of Carabobo State, to feed the Pequiven PT-106 Treatment PlantProject: Basic Engineering; Construction of the Compressors Plants-Cariaco, Caripito and Muscar – Gas Transportation Costa Afuera’s Project. Internal Marketing Department. PDVSA GAS.Developed of basic engineering, including selection of the location sites for compressor plants, enquiry documentation for the detailed engineering, procurement and construction. Offshore Gas Transportation System (East) for 1 MMCFD gas at 1,200 psig. Designed project to develop a process of three Compressor Plants.

Education

  • Southern Alberta Institute of Technology
    Bachelor of Applied Petroleum Engineering Technologist, Petroleum Engineering
    2013 - 2015
  • University of Calgary
    English Language Program, English Language and Literature, General
    2013 - 2013
  • Universidad de Oriente (VE)
    Bachelor of Science (BSc.), Chemical Engineering
    1997 - 2003

Community

You need to have a working account to view this content. Click here to join now