Eleanor Tibay (Hite)

Environmental Compliance Inspector at HYDRODATA GmbH
  • Claim this Profile
Contact Information
Location
DE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Environmental Services
    • 1 - 100 Employee
    • Environmental Compliance Inspector
      • Oct 2008 - Present

      Team member performing EPAS assessments at U.S. DoD Garrisons Hohenfels to include the FGS chapters Air Emissions, Drinking Water, Wastewater, Hazardous Materials, Hazardous Waste, Solid Waste, Medical Waste, POL, Noise, Pesticide Management, Cultural and Natural Resources, PCBs, Asbestos, Spill Prevention and Response Planning, and USTs. Manage HW Removal Pick-up Orders in ETID and HMMS. Responsible for input and update of the HMMS database for waste profiles and waste container information, processes and activities generating HW, container history and contaminant testing information for all hazardous waste streams, and records all transport and final disposal of HW, and create reports (Biennial, Metric, RCRA, CERCLA) for planning and contracting of hazardous waste storage and removal, and for DOT Requirements. As part of HMMS user group, participate in reviewing the prioritization of the Software Change Requests (SCR), receive information and training on the newest HMMS software release, and receive information on other topics relevant to the garrison’s HMMS program and its mission. Develop an assessment schedule for facilities such as hazardous storage areas and accumulation points (HWSA/HWAP) that store water endangering/hazardous waste and using engineering judgment to identify problems and deficiencies such malfunctions or deterioration. Developed concepts for the repair or upgrade of facilities to meet legal requirements of the FGS and regulations of the host nation.

    • United States
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Civil Engineer
      • Mar 2006 - Sep 2008

      Prepared documents and drawings for the operation, repair and maintenance of JMRC-IS and EIS used in military training operations. Updated as-built drawings for communication systems and sub-systems for life-cycle and system modifications. Prepared documents and drawings for the operation, repair and maintenance of JMRC-IS and EIS used in military training operations. Updated as-built drawings for communication systems and sub-systems for life-cycle and system modifications.

    • Civil Engineering
    • 1 - 100 Employee
    • Senior Highway Engineer
      • Aug 2003 - Jun 2005

      Prepared documents for tender and award for Access Roads for Formula 1 Bahrain Racing Circuit, Phases I and II. Assessed traffic impact and created concept road designs for dredge island expansion projects. Created conceptual designs for the Strategic Roads Masterplan and Transport Model, from 2006 to 2021, providing at-grade alternatives to future planned grade separated interchanges. Provided concept designs for signalized interchanges to replace all roundabouts throughout Bahrain. Preparation of road construction cost estimates.

    • United States
    • Investment Management
    • Senoir Highway Engineer
      • Feb 2002 - Feb 2003

      Prepared site plans for highway projects for the transportation commissions of Virginia, West Virginia, Arizona. Created surface models from provided surveys. Provided horizontal and vertical geometry for interstates, highways, and secondary roadways. Prepared cross-sections and calculated cut and fill volumes for earthwork estimates. Analyzed watersheds and hydrology affecting projects. Designed storm drainage, storm water management, and culvert outfalls for roadway improvements. Provided plans for utility relocation. Prepared construction cost estimates. Coordinated with respective city and state agencies. Coordinated with various utility companies and contractors of adjacent and/or coincidental projects.

    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Civil Engineer
      • Nov 1995 - Feb 2002

      Prepared site plans for industrial and government projects. Designed secondary roads for VDOT, including right-of-way delineation for acquisition, storm sewer & utilities and pertinent easements. Prepared traffic control and sequence of construction plans. (Attended VDOT/VRTBA "Work Zone and Traffic Control Class" – October 1998). Attended Citizen Information Meetings and Public Hearings for questions. Compute culvert, ditch, and earthwork calculations. Prepared take-offs for bid schedules and/or estimates. Designed BMP structures. VDOT Roadway projects include Route 199 (including subsequent interchange projects) and Monticello Road in James City County, Pinner’s Point TSF in Portsmouth, Route 58 in Grayson County, Route 58 (Virginia Beach Boulevard) in Norfolk, and Route 175 in Chincoteague. Site work projects included the VAMC Hospital Addition in Hampton, Va., and various site plans for Ford Motor Company in Norfolk.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Designer/EIT
      • Aug 1983 - Nov 1995

      Prepared site plans for commercial and industrial as well as residential clients. Designed lot layouts, right-of-ways, storm sewer & utilities for residential subdivisions. Computed curb and ditch calculations, grinder pump calculations and cut/fill volumes. Prepared estimates. Inspected HRSD force main projects in York/James City County which included coordination with electric, telephone and railroad companies. Projects included various subdivisions of Ford’s Colony, Governor’s Land and Greensprings.

Education

  • Old Dominion University
    Bachelor of Science (BS), Civil Engineering
    1984 - 1991

Community

You need to have a working account to view this content. Click here to join now