EJ Starrett

Director of I&C at StarTech Networks Inc.
  • Claim this Profile
Contact Information
Location
Plano, Texas, United States, US

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Electrial Safety Awareness for Telecom Workers Course - Dept of Labor
    NATE
    Jul, 2023
    - Sep, 2024
  • Certified Professional Installer (CPI) for CBRS
    Federated Wireless
    Jul, 2023
    - Sep, 2024
  • Startech Networks - Associate Member
    NATE
    Jul, 2023
    - Sep, 2024

Experience

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Director of I&C
      • Apr 2023 - Present
    • Senior Manager Infrastructure
      • Jan 2022 - Mar 2023
    • Project Manager
      • Sep 2021 - Dec 2021
    • Defense and Space Manufacturing
    • Director - Service Delivery
      • Oct 2019 - Sep 2021
    • Project Manager Engineering - Verizon
      • May 2018 - Oct 2019

      Verizon Wireless New Construction, 4G/5G Small Cells and Macro Sites.

    • Lead Integration Engineer
      • May 2018 - Jul 2019

      Completed the Upstate New York and New England Sprint:DO Macro Site UpgradesAlcatel-LucentNokia AirScale

    • United States
    • Telecommunications
    • 100 - 200 Employee
    • Project Manager OSP Design Engineering
      • Feb 2017 - Apr 2018
    • Sprint Field Engineer
      • Apr 2016 - Jan 2017

      All aspects of Cell Site Technician work on RBS and BBS cabinets using and very proficient in Nokia BTS manager,FTP, Hyper Terminal, RBS Element manager, EAMS. Battery Retrofits, SNV Cleanups, PMI's and was dispatched on Corrective tickets as well. All aspects of Cell Site Technician work on RBS and BBS cabinets using and very proficient in Nokia BTS manager,FTP, Hyper Terminal, RBS Element manager, EAMS. Battery Retrofits, SNV Cleanups, PMI's and was dispatched on Corrective tickets as well.

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Project Manager
      • Mar 2015 - Mar 2016

      Project Manager Managed crews doing complete installs to TP77350 specifications including bay lineups and all associated ironwork, Nokia 7750's, All types of Junipers, Cisco, EXFO ect... and Remote Power Management Distribution Panels including all associated Power Cables, Populating all Cards, Install Fiber and Build Ethernet cables to length. Project Manager Managed crews doing complete installs to TP77350 specifications including bay lineups and all associated ironwork, Nokia 7750's, All types of Junipers, Cisco, EXFO ect... and Remote Power Management Distribution Panels including all associated Power Cables, Populating all Cards, Install Fiber and Build Ethernet cables to length.

    • United States
    • Telecommunications
    • 100 - 200 Employee
    • Cell Site Technician & Inspector
      • Apr 2013 - Apr 2015

      I covered the Texas and Oklahoma Panhandles and Lubbock area for the Installation, Integration and Commissioning of equipment consisting of Ciena 3930 & 3931, Alcatel Lucent 4.0 BTS, Nortel CDMA BTS to connect Verizon, Sprint and Tmobile cell sites to the Fiberlight Fiber Network for their backhaul needs. This included monitoring alarms for 4G LTE, CDMA, BTS Microwave and power systems. BDFB's like Lorain and restoring when necessary. I also supervised Microwave installations and configured, turned up and tested those systems. Also served as the Inspector for the contractors running our fiber both underground and overhead. Show less

    • Field Engineer HS1
      • Jan 2013 - Mar 2013

      Installation, Integration, Commissioning, Script loading of SIU's, Sp210's, DUL's, DBA's in the Ericsson RBS 6201 cabinets for 4G/LTE project. Installation of CDMA Upgrade Kit in BTS, from Digital Control Group (DCG) to Enhanced Digital Control Group (eDCG) Configuration. Perform legacy hot slides, Performing pre-Intergration site preparation. Training new team members. Installation, Integration, Commissioning, Script loading of SIU's, Sp210's, DUL's, DBA's in the Ericsson RBS 6201 cabinets for 4G/LTE project. Installation of CDMA Upgrade Kit in BTS, from Digital Control Group (DCG) to Enhanced Digital Control Group (eDCG) Configuration. Perform legacy hot slides, Performing pre-Intergration site preparation. Training new team members.

    • Field Engineer
      • Sep 2012 - Dec 2012

      Installation, Integration, Commissioning of Huawei OSN 8800 and 9800 deployed on super backbones, backbones, and metro layers Installation, Integration, Commissioning of Huawei OSN 8800 and 9800 deployed on super backbones, backbones, and metro layers

    • France
    • Accounting
    • 1 - 100 Employee
    • Builder 3 Level IV Technician at Ericsson via
      • Jan 2012 - Sep 2012

      Central office installation nationwide including Ericsson/Sprint LTE, NV-PMSC , SE1200 and Lim upgrade projects. Central office installation nationwide including Ericsson/Sprint LTE, NV-PMSC , SE1200 and Lim upgrade projects.

    • Staffing and Recruiting
    • 1 - 100 Employee
    • Level IV Lead Technician
      • Jan 2009 - Dec 2011

      Lead Technician designing, implementing and installing labs to simulate working Central Offices for VOIP equipment manufacturers to design and test new products. Lead Technician designing, implementing and installing labs to simulate working Central Offices for VOIP equipment manufacturers to design and test new products.

    • United States
    • Level 3 Lead Installer and Supervisor
      • Aug 2006 - Dec 2008

      Central Office installation for transmission and power. Central Office installation for transmission and power.

    • Cell Technician
      • Sep 2004 - Jul 2006

      Installation, Integration, Commissioning, CDMA Legacy Hot Slides,Script Loading, Power system installs. Installation, Integration, Commissioning, CDMA Legacy Hot Slides,Script Loading, Power system installs.

    • United States
    • Telecommunications
    • 200 - 300 Employee
    • Lead Communications Service Technician
      • Jun 1994 - Aug 2001

      Central Office installation for transmission, switching and power. Central Office installation for transmission, switching and power.

Education

  • CenturyLink,Ericsson,Alcatel Lucent, Nokia, Juniper,AT&T, Fujitsu
    Certification and Badged for Ericsson and CenturyLink, LTE Commissioning & Integration, Power, Fiber Splicing and Central Office
    1998 - 2018
  • AT&T
    Certification for AT&T Badge, Telecommunications Technology/Technician
    2012 - 2017
  • Ericsson
    Integration Certification, Cell Site Integration
    2017 - 2019

Community

You need to have a working account to view this content. Click here to join now