Eimhin Bateman
Project Manager at Kenny Constructions- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Kenny Constructions
-
Australia
-
Civil Engineering
-
1 - 100 Employee
-
Project Manager
-
Jun 2016 - Present
Major Projects: Northwest Rail Link- Bella Vista Station & Castle Hill Station Boxes, Contracts Value- ($30million)- Construction Type: Cut and Cover Concrete Structures West Connex- Concord Interchange Cut and Cover Tunnel and Motorway Operations Complex Building 1,2&3, Contracts Value- ($28 million) – Construction Type: Concrete Ventilation Shafts and Substation Structures Sydney Metro- Central Station Box, Contract Value- ($70 million): Construction type: Top-Down Construction of mainly in-situ concrete elements Sydney Gateway- Bridge Construction Structures 41,42,43 and 12. ($15 million) Kenny Constructions- HQ and Depot development of 7000m2 site.
-
-
-
J. Murphy & Sons Limited
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Section Engineer
-
Jun 2012 - Apr 2016
Water and Waste Department. My current duties include:•Temporary works co-ordinator• Producing and updating construction programs• Management and supervision of plant and labour• Setting out • Ensuring HSEQ is kept in line with company policy on site. • Producing method statements and risk assessments Water and Waste Department. My current duties include:•Temporary works co-ordinator• Producing and updating construction programs• Management and supervision of plant and labour• Setting out • Ensuring HSEQ is kept in line with company policy on site. • Producing method statements and risk assessments
-
-
-
Twenty 20 surveys
-
Australia
-
Civil Engineering
-
Engineer Civil Surveyor
-
Jun 2011 - Jul 2012
* Reporting on bulk earthwork and stockpile volumes* Producing as constructed for rail formation* Setting out rail formation, drainage and road sections related to the project* Gps Machine Control for graders and excavators * equipment used for setting out were Leica G.P.S and Carlson Software * Reporting on bulk earthwork and stockpile volumes* Producing as constructed for rail formation* Setting out rail formation, drainage and road sections related to the project* Gps Machine Control for graders and excavators * equipment used for setting out were Leica G.P.S and Carlson Software
-
-
-
Bowen Construction
-
Construction
-
1 - 100 Employee
-
Site Engineer
-
Jun 2009 - Feb 2010
* Liaising with Sub Contractors * Setting out for bridge construction sections* Involvement with Method Statements * Diary Management * Reading designs/drawings * Producing Site paperwork and diary * Reporting on build ability issues and quality assurance * Liaising with Sub Contractors * Setting out for bridge construction sections* Involvement with Method Statements * Diary Management * Reading designs/drawings * Producing Site paperwork and diary * Reporting on build ability issues and quality assurance
-
-
-
Bowen Construction Ltd
-
United Kingdom
-
Construction
-
Student Engineering Surveyor
-
Jun 2008 - Sep 2008
Surveying site for earthworks (G.P.S)Setting out drainage and formationStockpile surveying and reportingQuality assurance Surveying site for earthworks (G.P.S)Setting out drainage and formationStockpile surveying and reportingQuality assurance
-
-
Education
-
Dublin Institute of Technology
Construction Management, Quantity Surveying, Site management, Construstion Technology, Health & Safety and Project Planning -
Christian Brothers School, Naas, Kildare Ireland