Efren Feliciano

Field Support Supervisor at PhilWeb Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Philippines, PH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Philippines
    • Gambling Facilities and Casinos
    • 200 - 300 Employee
    • Field Support Supervisor
      • Nov 2015 - Present

    • Hardware Engineer
      • Oct 2013 - Oct 2015

    • Denmark
    • Financial Services
    • 700 & Above Employee
    • Product Test Engineer
      • Aug 2012 - Oct 2013

      (1) Lot yield monitoring, analysis and improvement. Provide yield and improvement report to Customer. (2) Hold lot report and provide disposition. (3) Critical device test parameter monitoring. (4) New product qualification and documentation. (5) Equipment and peripheral qualification. (6) Engineering run documentation. (7) Coordinate with Assembly Engineering for assembly related failures. (8) Coordinate with Customer for lot related issues. (9) Provide assistance to Test Engineering for new test program debugging. (10) Provide assistance to Customer for remote debugging. (11) Provide assistance to Line Maintenance in resolving device won’t pass issues. Show less

    • United States
    • Semiconductors
    • 700 & Above Employee
    • Equipment Engineer
      • Jan 2008 - Aug 2012

      1. Take the lead role in monitoring equipment breakdown and provide short term and long term solution. 2. Responsible in maintaining appropriate spares. 3. Work closely with Production and Planning to assure product one time delivery. 4. Facilitate support to Test Engineering and Customer Quality Control Engineering. 5. Design experiments to lessen downtime. 1. Take the lead role in monitoring equipment breakdown and provide short term and long term solution. 2. Responsible in maintaining appropriate spares. 3. Work closely with Production and Planning to assure product one time delivery. 4. Facilitate support to Test Engineering and Customer Quality Control Engineering. 5. Design experiments to lessen downtime.

    • Equipment Engineer
      • Jan 2005 - Jan 2008

      1. Take the lead role in monitoring equipment breakdown and provide short term and long term solution. 2. Responsible in maintaining appropriate spares. 3. Work closely with Production and Planning to assure product one time delivery. 4. Facilitate support to Test Engineering and Customer Quality Control Engineering. 5. Design experiments to lessen downtime. 1. Take the lead role in monitoring equipment breakdown and provide short term and long term solution. 2. Responsible in maintaining appropriate spares. 3. Work closely with Production and Planning to assure product one time delivery. 4. Facilitate support to Test Engineering and Customer Quality Control Engineering. 5. Design experiments to lessen downtime.

    • Field Service Engineer
      • Apr 2004 - Oct 2004

      Provide Customer support. Execute planned maintenance activities. Support equipment upgrades and repairs. Provide Customer support. Execute planned maintenance activities. Support equipment upgrades and repairs.

    • Writing and Editing
    • 1 - 100 Employee
    • Test Maintenance Engineer
      • May 1997 - Mar 2004

      1. Plan, control and monitor metrics in maintaining Tester, Handler, Prober, probe card and hardware downtime. 2. Supervise Equipment maintenance group and auxiliary support group. 3. Supervise PM/Cal of equipment. 4. Provide mechanical and electrical design of probe card and ATE hardware. 1. Plan, control and monitor metrics in maintaining Tester, Handler, Prober, probe card and hardware downtime. 2. Supervise Equipment maintenance group and auxiliary support group. 3. Supervise PM/Cal of equipment. 4. Provide mechanical and electrical design of probe card and ATE hardware.

    • Philippines
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Product Engineer
      • 1996 - 1997

      (1) Lot yield monitoring, analysis and improvement. Provide yield and improvement report to Customer. (2) Hold lot report and provide disposition. (3) New product qualification and documentation. (4) Equipment qualification. (5) Coordinate with Customer for lot related issues. (1) Lot yield monitoring, analysis and improvement. Provide yield and improvement report to Customer. (2) Hold lot report and provide disposition. (3) New product qualification and documentation. (4) Equipment qualification. (5) Coordinate with Customer for lot related issues.

    • Philippines
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Test Line Technician
      • 1995 - 1996

      1. Power supply calibration and repair. 2. Peripheral maintenance and repair. 3. Equipment conversion, 4, Assists in product evaluation. 1. Power supply calibration and repair. 2. Peripheral maintenance and repair. 3. Equipment conversion, 4, Assists in product evaluation.

Education

  • University of Perpetual Help System DALTA
    BSEE, Electrical Engineering
    1986 - 1991

Community

You need to have a working account to view this content. Click here to join now