Edward Chavez

Sr. Scheduler at Houston Airport System
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Spring, Texas, United States, US
Languages
  • Portuguese Limited working proficiency
  • Spanish Native or bilingual proficiency
  • English Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Construction Schedule Support - General
    Texas Department of Transportation
    Jan, 2022
    - Nov, 2024
  • Certification Entrepreneurship
    University of Houston, C.T. Bauer College of Business

Experience

    • United States
    • Airlines and Aviation
    • 200 - 300 Employee
    • Sr. Scheduler
      • Mar 2023 - Present

    • United States
    • Construction
    • 1 - 100 Employee
    • Sr. Scheduler
      • Mar 2023 - Present

    • Project Scheduler
      • Mar 2023 - Present

    • Project Scheduler
      • Mar 2023 - Present

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Sr. Project Scheduler
      • Jul 2019 - Mar 2023

      I am responsible for organizing, implementing, and maintaining schedules to assist the team in ensuring satisfactory realization of project contract requirements as scheduled.• Bond Implementation Program, Harris County Flood Control District – • Designing the planning strategy and program hierarchy, including all levels of milestones within the Integrated Master Schedule (IMS).• Implementing the Planning Procedure and Guidance to other schedulers• Develop and maintain the Integrated Master Schedule and Work Breakdown Structure (WBS) and resourse loading. • Ensuring alignment between P6 and other Project Controls platform• Providing regular ad-hoc schedules and what-if to aid decisions at Program and/or Project level.• Verifying that the contractor and consultant schedules are realistic, and that available resources can meet the project objectives.• Perform scheduling functions such as preparing logic-driven, resource-loaded schedule reports, Critical path analysis, earned value analysis and resource usage• Direct planning and scheduling fuctions as requested by Programme Managers• Prepare writtten, graphical and technical information from all aspects of the schedule such as Histograms, S-curve, deployment schedules, current schedule status reports. • Collecting progress data in accordance with the project requirements and the approved progress control procedures.• Issuing progress reports, program updates and productivity data on a periodic basis.• Assessing potential future rates of progress, including changes, commitments yet to be made, productivity levels and risks.• Maintaining all schedules in accordance with the published status of project change. Show less

    • Senior Scheduler SH249/99 Direct Connector Project
      • Jul 2019 - Mar 2023

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • SH-249 CPM Scheduler
      • Jan 2016 - Aug 2019

      Construction Scheduler Analyst for Infrastructure Projects around Houston area ranging from $100 -$500 Million Dollars. Projects included : SH-249 Extension, Beaumont IH-10 Project, Loop 82, Sam Houston Tollway Project, Hardy Toll Road Grand Parkway Direct Connector, IH-35 3A2 McLennan County, Cane Island Parkway Interchange, US 84 Sabine River and US 59 Nacogdoches. • Develop Time determination construction schedules for BGE internal Infrastructure Transportation Group. • Review and Analyze contractor’s Time Impact submittals for claims Maintain Design Schedules • Produce monthly schedule reviews for TX-DOT contractor’s monthly schedule submittals. Show less

    • United States
    • Construction
    • 700 & Above Employee
    • Engineer
      • Sep 2015 - Jan 2016

      SH-99 Grand Parkway at Baytown. • Managed the master schedule - updated and analyzed the schedule on a monthly basis, • Created and tracked the utilities schedule to mitigate and re-plan the construction sequence held up due to utility conflicts in the right-of-way of the construction activities, • Created the internal schedule “Ghost Schedule” Project wide and update on a weekly and even daily monitoring to make sure the plan is followed through, • Spearheaded the “pull planning” process to meet the interim and the owner milestones dates, • Tracked labor productivity and material resource availability on a weekly and monthly basis. • Conducted analysis of projects to highlight and identify specific problem areas and risks and provide mitigating strategies by: Preparing ‘what-if’ schedules to re-plan the construction activities due to delay or advancement in the right-of-way acquisition dates, or utility relocation dates, and mitigate the schedule if needed, • Prepared Time Impact Analysis, provide required information, reports, documentation, and schedules for Change Order creation and submission, • Created and managed process and tracking reports which provide the field updates to the primavera schedule on a weekly basis, • Incorporated and managed the budget, labor and material resources into the schedule, • Prepared the commodity curves for major material resources like earthworks, subgrade, and concrete, • Spearheaded the weekly Project Management planning meeting to discuss variances and delays with the Project Team and recommend remedial actions. • Emphasized on safe culture resulting in zero recordable and safety issues Show less

    • Brazil
    • Investment Management
    • 700 & Above Employee
    • Drainage Superintendent
      • Sep 2014 - Apr 2015

      Conduct safely and efficiently all drainage operations at segment F2 of the SH-99 Grand Parkway project by means of planning and scheduling.

    • Night Time Segment Engineer Grand Parkway Project
      • Jan 2014 - Aug 2014

      Supervision, Planning and procurement for all night time operations for drainage, walls, grading and structures disciplines.

    • United States
    • Construction
    • 700 & Above Employee
    • KieCore Engineer / SAP Deployment Engineer
      • Jul 2013 - Dec 2013

      Helping in the deployment of brand new Field Mobility systemsDeploying SAP based programs in project around the country Enhanced quantity claiming Time card Reporting production perfomed

    • Field Engineer MOT - Grading
      • Aug 2012 - Jul 2013

      Worked on the DFW Connector project. managing subs cost and schedule for Maintance of traffic and grading. Managed punch list items essential for subtantial completion such as stripping, MBGF and ITS. Worked closely with sub-contractors to complete task holding all of the qualitty requirements.

    • Engineer - SubContractor Coordinator
      • May 2012 - Jul 2013

      Perform engineering work in connection with large-scale construction projects. Responsibilities included: Field engineering, operation planning, cost control, project scheduling, surveying, quantity tracking, material procurement, contract administration, estimating and supervision of field activities. Perform engineering tasks requiring standard techniques and handling minor problems of a technical nature arising during construction. Maintain records as required regarding job progress, costs, material usage, etc.Assist in planning and scheduling. Investigate problems and/or reported incidents; identify and recommend solutions/alternatives as appropriate. Show less

    • United States
    • Higher Education
    • 700 & Above Employee
    • Teaching Assistant
      • Jan 2007 - May 2012

      Created and designed an entire course for the Mechanical Engineering Technology department Manage 140 students each semester Develop and maintain two online classes using WebCT Blackboard. Redesigned AutoCAD drawing using parametric software. Created and designed an entire course for the Mechanical Engineering Technology department Manage 140 students each semester Develop and maintain two online classes using WebCT Blackboard. Redesigned AutoCAD drawing using parametric software.

    • United States
    • Construction
    • 700 & Above Employee
    • Project Engineer
      • Dec 2011 - Mar 2012

      • Responsible for planning, scheduling, conducting and coordinating the technical and management aspects of projects. • Accountable for the successful completion of engineering projects. • Requires extensive regular contact with assigned project Clients. • Assist in the preparation of engineering project proposals. • Budget monitoring and trend tracking. • Participating in Client/contractor meetings and resolving Client/engineering and management project issues. • Responsible for planning, scheduling, conducting and coordinating the technical and management aspects of projects. • Accountable for the successful completion of engineering projects. • Requires extensive regular contact with assigned project Clients. • Assist in the preparation of engineering project proposals. • Budget monitoring and trend tracking. • Participating in Client/contractor meetings and resolving Client/engineering and management project issues.

    • Safety Representative Intern
      • May 2011 - Aug 2011

      Maintain a safe work environment enforcing OSHA30 certification Keep work areas and co-workers with Government, State and local regulations Maintain a safe work environment enforcing OSHA30 certification Keep work areas and co-workers with Government, State and local regulations

    • Designer
      • Jul 2010 - Jan 2011

      Redesigned AutoCAD drawing using parametric software. Produced detail parts for manufacturing purposes. Reversed engineered part and corrected red lines marks in old drawings or change orders. Redesigned AutoCAD drawing using parametric software. Produced detail parts for manufacturing purposes. Reversed engineered part and corrected red lines marks in old drawings or change orders.

    • Oil and Gas
    • 1 - 100 Employee
    • Junior Designer
      • Jun 2010 - Jan 2011

      Redesigned AutoCAD drawing using parametric software. Produced detail parts for manufacturing purposes. Reversed engineered part and corrected red lines marks in old drawings or change orders. Redesigned AutoCAD drawing using parametric software. Produced detail parts for manufacturing purposes. Reversed engineered part and corrected red lines marks in old drawings or change orders.

    • Junior AutoCAD Designer
      • May 2003 - Nov 2003

      Detail Steel Drawings for Fabrication Detail Steel Drawings for Fabrication

Education

  • University of Houston
    Bachelor of Science, Construction Management
    2006 - 2012
  • Laguardia Community College
    Associates of Science, Computer Science
    2001 - 2004

Community

You need to have a working account to view this content. Click here to join now