Edoardo Grosso
Technical Project Coordinator at Webuild- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Webuild
-
Italy
-
Construction
-
700 & Above Employee
-
Technical Project Coordinator
-
May 2020 - Present
-
-
-
Salini Impregilo
-
Italy
-
Construction
-
700 & Above Employee
-
Technical Project Coordinator
-
Apr 2018 - Present
Project Coordination during Tender Phases - Main Experiences: - Etihad Rail - Package 2D - Sharja Fujaira - UAE - Third Round Bidding - Design and Build Project - (Salini Impregilo - Tristar E&C - Designer Parsons - Italferr - Oneworks) - New Airport Jorge Chavez - Lima - Peru - Design and Build Project - (FCC - Salini Impregilo - Designer AECOM) Project Coordination during Tender Phases - Main Experiences: - Etihad Rail - Package 2D - Sharja Fujaira - UAE - Third Round Bidding - Design and Build Project - (Salini Impregilo - Tristar E&C - Designer Parsons - Italferr - Oneworks) - New Airport Jorge Chavez - Lima - Peru - Design and Build Project - (FCC - Salini Impregilo - Designer AECOM)
-
-
-
Salini Impregilo - Tristar JV
-
Abu Dhabi, United Arab Emirates
-
Umm Lafina Link Road - Contract 2 - Design and Technical Coordinator
-
Nov 2017 - Mar 2018
Design and Build of Extending Sh. Zayed Bin Sultan Street at Umm Lafina Island to connect Al Reem Island - (Contract 2) - The D&B Contract will include the establishment of a 4km road above water and mangrove areas to connect the south side of Umm Lafina Island with Sheikh Zayed Road. Two main bridges will be built to pass through the water canals and the main intersection to ease traffic in all the directions around Sheikh Zayed bin Sultan Road. The project would include pedestrian and cycling lanes, which would be constructed along with other facilities and bike renting shops in order to create an integrated project. Arch-shaped concrete tiles will be used to preserve the environment, ensure the flow of water, reduce bad effects on mangroves trees, and enhance the navigation of traffic in the area. In charge of Management, supervision and follow up of the Design process (Arcadis, Tebodin like Engineer, Musanada, stakeholders and internal divisions) in order to produce deliverables for permanent and temporary works during start up project. Show less
-
-
-
Salini Impregilo
-
Italy
-
Construction
-
700 & Above Employee
-
Technical Project Coordinator
-
Oct 2016 - Oct 2017
Project Coordination during Tender Phases - Main Experiences: - Design and Build of Doha Metro - Qatar Rail - Phase 1a Green Line Extension - Qatar (Salini Impregilo - S&K - Contraco JV - Designer COWI Italferr and OneWorks) - Grand Paris - France - Ligne 16 - Lot 3 - Dubai Storm Water Tunnel System -D&B Contract (Designer ARUP) - Dubai - UAE - Brenner Basis Tunnel - Lot Pfons-Brenner - Austria - Strabag Salini Impregilo JV Project Coordination during Tender Phases - Main Experiences: - Design and Build of Doha Metro - Qatar Rail - Phase 1a Green Line Extension - Qatar (Salini Impregilo - S&K - Contraco JV - Designer COWI Italferr and OneWorks) - Grand Paris - France - Ligne 16 - Lot 3 - Dubai Storm Water Tunnel System -D&B Contract (Designer ARUP) - Dubai - UAE - Brenner Basis Tunnel - Lot Pfons-Brenner - Austria - Strabag Salini Impregilo JV
-
-
-
Salini Impregilo - NRW Joint Venture
-
Construction
-
1 - 100 Employee
-
Design Coordinator
-
May 2016 - Sep 2016
Forrestfield Airport Link Project - The FAL is one of Western Australia’s most transformational public transport projects, consisting of a train line connecting Forrestfield to the city, opening up Perth’s eastern suburbs to rail for the first time (8km twin bored tunnels, Tunnel cross passages and egress shafts, Rail infrastructure and operating systems, 3 new Stations). Management, supervision and follow up of all involved actors in the Design process (GHD, Geodata, D'appolonia, PB like Independent Verifier, Public and Transports Authority, stakeholders and internal divisions) in order to produce deliverables for permanent and temporary works during start up project. Show less
-
-
-
Salini Impregilo
-
Italy
-
Construction
-
700 & Above Employee
-
Technical Project Coordinator
-
Jan 2014 - Apr 2016
Project Coordination during Tender Phases - Main Experiences: - Design and Build of Extending Sh. Zayed Bin Sultan Street at Umm Lafina Island to connect Al Reem Island - (Contract 2) - Design and Build Contract – Abu Dhabi (UAE) – Best Technical and Commercial offer (Salini Impregilo - Tristar E&C JV) - Etihad Rail (UAE) - Stage 2 – C0306 – Design and Build Contract – Second Round Bidding - Etihad Rail (UAE) ) - Stage 2 – C0304 – Design and Build Contract - Second Round Bidding - Etihad Rail (UAE) ) - Stage 2 – C0303 – Design and Build Contract - Second Round Bidding - Etihad Rail (UAE) ) - Stage 2 – D0201 – Design and Build Contract - Second Round Bidding - Obhur Creek Bridge and Secondary Bridges with related approaches – Jedda – KSA - Design and Build Contract – Shortlisted Bidder – Best Technical Offer (Salini Impregilo - Cimolai JV) - Oman Rail Project – Segment 1 – Design and Build Contract – Sultanate of Oman - Shortlisted Bidder – Best Technical Offer - Curitiba Metro Public and Private Partnership - Curitiba - Brasil - Metro Quito – EPC Contract – Quito - Ecuador Show less
-
-
-
Impregilo
-
Italy
-
Construction
-
300 - 400 Employee
-
Technical Project Coordinator
-
Oct 2011 - Dec 2013
Project Coordination during Tender Phases - Main Experiences: - Etihad Rail (UAE) - Stage 2 – C0306 – Design and Build Contract – First Round Bidding - (Impregilo Samsung C&T Tristar E&C JV Preferred Bidder) - Etihad Rail (UAE) - Stage 2 – C0304 – Design and Build Contract - First Round Bidding - (Impregilo Samsung C&T Tristar E&C JV Preferred Bidder) - Etihad Rail (UAE) - Stage 2 – C0303 – Design and Build Contract - First Round Bidding- (Impregilo Samsung C&T Tristar E&C JV Preferred Bidder) - Etihad Rail (UAE) - Stage 2 – D0201 – Design and Build Contract - First Round Bidding- (Impregilo Samsung C&T Tristar E&C JV Preferred Bidder) - Motorway Comarnic-Brasov – Public and Private Partnership - Design and Build Contract (Romania) - Motorway Lugoj – Deva, Lot 2, Lot 3 and Lot 4, and Motorway Timisoara Lugoj Lot 2 - Romania – Design and Build Contract - EXPO 2015 – Piastra – Lump Sum Contract – Italy - Ituango Principal Hydroelectric Project, Colombia - Alto Maipo Hydroelectric Project – AM CO610 AM CO620, AM CO630 Contracts, Chile Show less
-
-
-
SOIL Engineering
-
Italy
-
Civil Engineering
-
1 - 100 Employee
-
Civil Environmental Engineer
-
Oct 2007 - Sep 2011
Civil Engineer, involved in the implementation of the various projects of the company specialized in civil engineering, geology, geotechnical structures underground works and offshore installations Civil Engineer, involved in the implementation of the various projects of the company specialized in civil engineering, geology, geotechnical structures underground works and offshore installations
-
-
-
Studio Majone Ingegneri Associati
-
Milano, Italia
-
Civil Environmental Engineer
-
May 2005 - Sep 2007
Junior Civil Engineer involved in the development of the various projecs of the company specialized in civil, hydraulics and environmental engineering. Junior Civil Engineer involved in the development of the various projecs of the company specialized in civil, hydraulics and environmental engineering.
-
-
Education
-
Università degli Studi di Genova
Master of Engineering (M.Eng.), Civil and Environmental Engineering