Edmon L.

Engineer II at American Samoa Power Authority
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pago Pago, American Samoa, AS
Languages
  • Tagalog, Ilocano, Itawes, Ibanag, Malaweg -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Construction Safety and Health
    OSHA Safety Training Institute
    Sep, 2014
    - Nov, 2024
  • Project Management Professional (PMP)®
    Project Management Institute
    Sep, 2021
    - Nov, 2024
  • Civil Engineer
    Professional Regulation Commission
    Nov, 2013
    - Nov, 2024

Experience

    • American Samoa
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Engineer II
      • Dec 2019 - Present

      As a second level professional engineer, my work requires independent evaluations, selection, and application of standard engineering techniques, procedures and criteria. Work is reviewed for application and sound engineering judgment, technical accuracy, conformance with established precedents and policies. I analyze engineering data and prepare technical reports, exercise sound and dependent professional judgment in making decisions and rendering advice, analyze and prepare engineering plans and reports, establish and maintain effective working relationships with employees and the general public. I Supervises one or more design teams in the preparation of engineering plans and drawings; Makes difficult engineering calculations and prepares construction specifications and calculates cost estimates; Investigates, reviews and makes recommendations for the planning and design of public work facilities; Does inspection work on construction projects or insure conformance to plans and specifications; Reviews and analyzes investigation reports and confers with contractors on project recommendations; Designs or assists in designing a wide variety of highway, buildings, water and sewage lines and other public work facilities.

    • Engineer -1 (EIT)
      • Dec 2017 - Dec 2019

      As Engineer-I, I was responsible for the administration and construction of federally funded wastewater and water projects including inspection and contract modifications. I supervise the performance of engineering tasks by contractors, operations staff and subordinate technical staff within ASPA. I provide technical engineering expertise and project management skills in planning, design and construction of sanitary sewer systems and all related sewer line projects. I conduct technical training for professional and construction staff to ensure competence in safety, quality control and environmental protection activities. I manage the USEPA construction grant program, ensure federal and local environmental regulations, USEPA and ASEPA drinking water regulations and USEPA NPDES permit programs.

    • Engineering Technician III
      • Oct 2016 - Dec 2017

      As Engineering Tech-III, I prepare engineering plans, specifications and cost estimates, provide technical engineering expertise and project management skills in the planning, design, and construction of sanitary sewer systems. I conduct field visits and reviews land surveys, rights-of-way and archaeological clearances. I assist in pre-bid and pre-construction conferences, evaluate bids and contract awards. I review construction designs and schedules with construction supervisors, regularly inspect the status of construction projects and make necessary design and construction modifications where required. Meets with concerned parties to facilitate the resolution of problems, conflicts and issues relating to engineering projects. I prepare, review and update construction schedules where required. I review as-built construction drawings to verify that construction activities are accurately documented and entered into GIS and/or Auto-Cad records, check, verifies and endorses progress payments to contractors and consultants. Coordinates and enforces project compliance to all ASPA, ASG and Federal standards, regulations and policies. Develops and formulates standard operating procedures, establishes work priorities and allocates tasks based on individual skills and abilities of available staff. I prepare project reports and special reports for management and sponsors. I conduct Pipeline Assessment thru CCTV Inspection.

    • Inspector-Project Owner's Representative III
      • Oct 2015 - Oct 2016

      As Inspector - Project Owner’s Representative, I was tasked to inspect for the structural integrity & safety of structures, quality of workmanship, selection of materials being used, aesthetic values and similar matters involving compliance with the provisions of the contract plans and specifications. I provide construction inspection services on behalf of ASPA related to pipeline and conduit installation, bolted steel water storage tank erection activities, concrete foundation forming, steel reinforcement and concrete placement, erection of small reinforced concrete block structures and the installation of electrical power systems and motor controls. I conduct daily inspections, provide documentation such as daily logs, construction photos & minutes of meetings. I report directly to the Chief Wastewater Engineer all unsafe acts, conditions & any perceived deficient construction items.

    • Project Engineer/Structural Engineer
      • Apr 2014 - Oct 2015

      As Engineer, I perform engineering duties in planning, designing, and overseeing construction and maintenance of building structures. Ensures that the project is completed on time, within budget, project's objectives are met and that everyone else is doing their job properly. I am responsible for schedules and forecasts of project development, coordinates team activities and communicates project status through technical reports. I analyze a construction project's overall cost regarding material goods and other budgetary concerns, prepare legal contract documents and create detailed progress reports about the construction project. I obtain necessary permits and ensure each job is completed according to quality standards, spotting structural problems and providing sound solutions along with addressing issues of the subcontractors in a timely manner. Adhere to budget guidelines regarding work hours and materials. I create strategic plans for carrier contract negotiations, shipment order handling, transportation network modeling, cargo and freight planning, transportation analysis, and order execution and monitoring for all off-island materials. I prepare bidding documents such as detailed cost estimates, project schedules, specifications and contract agreements.

    • Civil Engineer-Job Order
      • Dec 2013 - Apr 2014

      As Civil Engineer, I was tasked to inspect and check projects, roads and buildings in conformity to plans and specifications. I prepared program of works and estimates with its accomplishments as required and prepared monthly, quarterly and annual reports for submission. As Civil Engineer, I was tasked to inspect and check projects, roads and buildings in conformity to plans and specifications. I prepared program of works and estimates with its accomplishments as required and prepared monthly, quarterly and annual reports for submission.

    • Assistant Production Supervisor
      • Oct 2011 - Mar 2012

      As production assistant supervisor, I supervised the overall production ensuring the international quality standards in producing ceramics tiles are being met. I manage and delegate the activities of 120 Manpower and 3 Team Leaders to attain high quality products without sacrificing their safety. I report to work 1hr. advance so as to give enough time in the endorsement of the previous shift and gather all information and to know all unfinished jobs. I conduct short meetings to all manpower to inform important information from the previous shift. I check manpower attendance to balance the workload per team. I decide on all critical problems that may arise during the day.

    • Assistant Production Supervisor
      • Nov 2010 - Oct 2011

      As production assistant supervisor of a newly established Japanese company that manufactures photovoltaic/solar panels, I lead and direct the activities and performance of the production floor to effectively support plant operations. Ensure compliance to required schedule in assigned area and conformance to process controls. I provide required employee training by giving technical guidance to less experienced operators. Maintain high standards of housekeeping in respective areas including: the production floor, machines, behind the plant and packing. I create and modify tool recipes and programs for a CIM1400 machine to be used in the deposition process for microcrystalline silicon thin film.

    • Assistant Production Supervisor
      • May 2010 - Nov 2010

      As production assistant supervisor, I supervised Filipino personnel together with the Japanese carpenters in the construction of the new building intended for the clean room of the photo-voltaic department. I supervise the installation of a centralized air conditioning system of the whole clean room building. I interpret plans and specifications during the installation of the roof and gutter of the clean room building. As production assistant supervisor, I supervised Filipino personnel together with the Japanese carpenters in the construction of the new building intended for the clean room of the photo-voltaic department. I supervise the installation of a centralized air conditioning system of the whole clean room building. I interpret plans and specifications during the installation of the roof and gutter of the clean room building.

    • Assistant Production Supervisor
      • Jun 2006 - May 2010

      As production assistant supervisor of an ISO 9001:2000 certified company, I am accountable for providing guidance and leadership to identified manufacturing operations to ensure the production of quality products made on-time, in the right quantity and in a cost efficient manner. I decide and declare deadlines to be followed by the woodworking section based on loading/shipment deadlines, check inventories submitted to be considered in the next schedule to avoid overstock and to know which part is more urgent. Identify all product lead time through conducting time study on all parts, identify bottleneck processes and all machine capacities. I was involved and awarded in converting from two shift to one shift operations by implementing the JIT (Just in Time) system. I provide final inspection of parts before delivery to the next process and provide a training plan for the newly hired employees. I prepare and update all work instructions, standard operating procedures, drawing plans and other ISO documents. Actual operation and preventive maintenance of all industrial machines (Panels Saw, Running Saw, Jumping Saw, Glue Spreader, Wide Belt Sander, Press machine, Gang Saw, Double End Tenoner, Cross boring, Body Boring, Auto Dowelling and NC) once in a while. I contribute to the company’s continuous program through Quality Circle and Kaizen activities.

Education

  • University of San Jose-Recoletos
    Master of Science in Management Engineering
    2021 -
  • UNIVERSITY OF SAINT LOUIS TUGUEGARAO
    BACHELOR OF SCIENCE IN CIVIL ENGINEERING, Structural Engineering, Geotechnical Engineering,
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now