Edgar Bajarunas
Site Manager at ITAB UK- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Russian -
-
English -
-
Lithuanian -
Topline Score
Bio
Credentials
-
CSCS Black
SkillsDec, 2015- Nov, 2024 -
First Aid
-Dec, 2015- Nov, 2024 -
AAT Level 3
-Jul, 2014- Nov, 2024 -
SMSTS
CITBDec, 2015- Nov, 2024 -
Asbestos
UK Asbestos Training Association - UKATA
Experience
-
ITAB UK
-
United Kingdom
-
Retail
-
1 - 100 Employee
-
Site Manager
-
Jan 2018 - Present
Morrisons, B&Qs, Sainsburies, Asdas - shopfitting Morrisons, B&Qs, Sainsburies, Asdas - shopfitting
-
-
-
IBCON LTD
-
Construction
-
Director
-
Jan 2015 - Present
IBCON Ltd providing project/site management, cooperation with main contractors and labour supplying for construction industry such as joiners, painters, labours. Various projects McDonalds, Sainsbury, Hilton, Holiday Inn, LIDL, Morrisons, B&Q, Asda IBCON Ltd providing project/site management, cooperation with main contractors and labour supplying for construction industry such as joiners, painters, labours. Various projects McDonalds, Sainsbury, Hilton, Holiday Inn, LIDL, Morrisons, B&Q, Asda
-
-
-
Barlows (UK) Ltd
-
United Kingdom
-
Construction
-
100 - 200 Employee
-
Shopfitting Site Manager / Joiner
-
May 2016 - Jul 2016
Site Manager to over see works on an Dunelm retail shopfitting projects in Rotherham, St Edmundsbury, Ipswcih, . The project involves installation of new furniture, relocate new or existing units, flooring, tills. Also involves carry out site inductions and oversee works ensuring the programme is being worked to. Site Manager to over see works on an Dunelm retail shopfitting projects in Rotherham, St Edmundsbury, Ipswcih, . The project involves installation of new furniture, relocate new or existing units, flooring, tills. Also involves carry out site inductions and oversee works ensuring the programme is being worked to.
-
-
-
Costain Group PLC
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Chargehand Joiner
-
Feb 2016 - May 2016
building a 3.1 mile-long waste water tunnel in the south of Glasgow as part of the biggest upgrade of the city’s waste water network in more than a century. The tunnel will be constructed using a specially designed tunnel boring machine. The main duties prepare concrete basement for boring machine and make the 400 meters tunnel leading to the main operating point. All operations provided under very high level health and safety instructions. building a 3.1 mile-long waste water tunnel in the south of Glasgow as part of the biggest upgrade of the city’s waste water network in more than a century. The tunnel will be constructed using a specially designed tunnel boring machine. The main duties prepare concrete basement for boring machine and make the 400 meters tunnel leading to the main operating point. All operations provided under very high level health and safety instructions.
-
-
-
Reddington Group
-
Nottingham, England
-
Multi Skilled Joiner
-
Jun 2012 - Feb 2016
Experienced in many construction operations such as a telescopic forklift driving, dumper, 360 digger, cherry picker, roller and others. Fully experienced within 1st, 2nd Fix, shop fitting, shuttering joinery and steel fixing included welding tasks. First Aider and certified CITB SMSTS (The Site Management Safety Training Scheme), CSCS. Experienced in many construction operations such as a telescopic forklift driving, dumper, 360 digger, cherry picker, roller and others. Fully experienced within 1st, 2nd Fix, shop fitting, shuttering joinery and steel fixing included welding tasks. First Aider and certified CITB SMSTS (The Site Management Safety Training Scheme), CSCS.
-
-
Education
-
Nottingham Central College
aat level 4, Accountancy -
Lincoln College
Accounting