Ebony Brown

Integration Operations Center (IOC) Manager at CRI
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Brandywine, Maryland, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Integration Operations Center (IOC) Manager
      • Mar 2020 - Present

    • Test Engineer
      • Jun 2016 - Mar 2020

    • United States
    • IT Services and IT Consulting
    • 100 - 200 Employee
    • Security Systems Engineer
      • Aug 2012 - May 2016

      - Collaborate with subject matter expert to design functional ACS, CCTV, IDS, Intercom and Public Address systems which are compliant to project specifications and drawings; - Analyze bid documentation (specifications, bid drawings, etc.) to generate RFIs, complete equipment takeoffs and collect equipment pricing for proposal input for potential projects; - Maintain relationships with local distributors for equipment pricing; - Prepare submittal packages and shop drawings after contract award; - Generate RFIs and prepare change orders for projects in progress; - Conduct site visits and communicate with on-site technicians about progress of projects - Point of contact (POC) for customers to address questions/issues/concerns in reference to electronic security systems; - Provide technical knowledge to sales/business development representative to determine customer requirements for security systems; - Attend on-site meetings (commissioning, design and project meetings, etc.); - Program, manage and administer company ACS installed at new headquarters Show less

    • United States
    • Computer and Network Security
    • 1 - 100 Employee
    • Security Engineer I
      • Oct 2009 - Aug 2012

      - Led engineering survey for customer concerning current CCTV system which required coordination with customer’s technical personnel and scheduled progress meetings to summarize recent developments, results, and submit deliverables; - Assisted Design Engineer in determining fiber conduit runs and drawing necessary one-line diagram; - Utilized AutoCAD to modify existing customer record drawings to reflect modifications made to system throughout project; - Programmed access control system using MDI SAFEnet software application and hardware; - Generated and maintained supplemental documentation for customers (Badging Manual, Post Operations Manual and Quick Reference Guides); - Prepared testing documentation for projects (System Operation Verification Test (SOVT), Pre-Installation and Checkout (PITCO), Transition Management Plan (TMP) and Data Integration Plan (DIP)) Show less

Education

  • Penn State University
    BS, Electrical Engineering
    2003 - 2008

Community

You need to have a working account to view this content. Click here to join now