Ebad Ur Rehman
Network Development Engineer at Horizon Networks NZ- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Urdu Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Best presentation of business case and ROI
2019 Thingworx AR/IoT Hackathon - University of AucklandJul, 2019- Nov, 2024 -
CIGRE CPD Certificate - Asset Resilience within Electricity Networks
CIGRE New ZealandJun, 2019- Nov, 2024 -
Students Engineering Exhibition 2008
PAF-KIETFeb, 2008- Nov, 2024 -
National Engineering Robotic Contest
National University of Sciences & Technology (NUST)Oct, 2007- Nov, 2024 -
National Engineering Robotic Contest
National University of Sciences & Technology (NUST)Oct, 2006- Nov, 2024
Experience
-
Horizon Networks NZ
-
New Zealand
-
Utilities
-
1 - 100 Employee
-
Network Development Engineer
-
Jun 2022 - Present
-
-
-
Unison Networks Ltd
-
New Zealand
-
Utilities
-
100 - 200 Employee
-
Summer Internship
-
Nov 2021 - Feb 2022
Accessing the seismic vulnerability of MV and LV assets in a distribution network. Accessing the seismic vulnerability of MV and LV assets in a distribution network.
-
-
-
Orion NZ Ltd
-
New Zealand
-
Utilities
-
100 - 200 Employee
-
PhD Research Collaborator
-
Mar 2018 - Oct 2021
Compilation of a detailed geospatial database of 11KV underground cables and repair joints to study the effect of seismic events on the lifelines of underground cables. Compilation of a detailed geospatial database of 11KV underground cables and repair joints to study the effect of seismic events on the lifelines of underground cables.
-
-
-
Unison Networks Ltd
-
New Zealand
-
Utilities
-
100 - 200 Employee
-
Summer Student - IoT sensors implementation
-
Dec 2020 - Mar 2021
During the summer internship at Unison, I developed and installed IoT sensors to monitor plastic pedestals in an electrical distribution network. These sensors measured temperature, humidity, and vibration inside plastic pedestals and transmitted the data in a form of hexadecimal payload to the cloud via gateway. The communication protocol implemented for this project was Lora and LoraWAN. The cloud platform was integrated with a dashboard to have a graphical representation of the data and set early alarm warnings to prevent failure. Show less
-
-
-
Ravi Autos Pvt. Ltd.
-
Pakistan
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Electrical Engineer
-
Apr 2014 - Oct 2017
• Prepare specifications for purchase of materials and equipment. • Conduct field surveys and maintain standard procedure operations. • Dealing with problems and resolving technical issues. • Prepare specifications for purchase of materials and equipment. • Conduct field surveys and maintain standard procedure operations. • Dealing with problems and resolving technical issues.
-
-
Education
-
The University of Auckland
Doctor of Philosophy - PhD, Power Systems -
University of Bradford
MSc, Electrical Engineering with Power Electronics -
Usman Institute of Technology, Hamdard University, Karachi, Pakistan
Bachelor's degree, Electronic Engineering