earshad hossain

Senior Electrical Engineer at Dhaka Stock Exchange Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
BD

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bangladesh
    • Capital Markets
    • 1 - 100 Employee
    • Senior Electrical Engineer
      • Aug 2009 - Present

      Responsible for total supervising, installation,testing,commissioning, of eight(8) MW Diesel power plant,Substation,Internal Bus-Bar Trunking System,Cable wiring,PABX System(40+1400),Fire Detection and Alarm System(Smoke & Heat Detector),Close Circuit Television(CCTV),Fire Hydrant System,Central Air Conditioning System(2000 TR),Passenger Lift (13 Nos) of 16 storied Building at DSE Tower project,Nikunja. Responsible for total supervising, installation,testing,commissioning, of eight(8) MW Diesel power plant,Substation,Internal Bus-Bar Trunking System,Cable wiring,PABX System(40+1400),Fire Detection and Alarm System(Smoke & Heat Detector),Close Circuit Television(CCTV),Fire Hydrant System,Central Air Conditioning System(2000 TR),Passenger Lift (13 Nos) of 16 storied Building at DSE Tower project,Nikunja.

    • Electrical Engineer
      • May 2006 - Jul 2009

      Responsible for maintenance/troubleshooting ofweavingunit (Somet, Smith, Tsudakoma machine), Utility Division (gas generator , diesel generator) Sizing Section, Electrical wiring, Monno Attire Ltd, Electrical installation supervision work ofMonno General Hospital, Spinning Section (Rotor, Ring, Comber, Simplex, Machconer, Lap former, Drawing, Carding, Blow-room machine) from 1st May 2006 to 28th july 2009. Responsible for maintenance/troubleshooting ofweavingunit (Somet, Smith, Tsudakoma machine), Utility Division (gas generator , diesel generator) Sizing Section, Electrical wiring, Monno Attire Ltd, Electrical installation supervision work ofMonno General Hospital, Spinning Section (Rotor, Ring, Comber, Simplex, Machconer, Lap former, Drawing, Carding, Blow-room machine) from 1st May 2006 to 28th july 2009.

    • Assistant Engineer
      • Feb 2004 - Apr 2006

      Responsible for maintenance/troubleshooting of weaving unit (Somet,Smith,Picanolmachine), A/C Humidification plant & chiller, boiler,compressor. Responsible for maintenance/troubleshooting of weaving unit (Somet,Smith,Picanolmachine), A/C Humidification plant & chiller, boiler,compressor.

Education

  • Rajshahi University of Engineering & Technology
    RUET, Electrical and Electronics Engineering
    1997 - 2003
  • Dhaka International University
    Master of Business Administration (M.B.A.), Human Resources Management/Personnel Administration, General
    2014 - 2016

Community

You need to have a working account to view this content. Click here to join now