    • Malaysia
    • Retail Office Equipment
    • 1 - 100 Employee
    • Senior Electrician
      • Aug 2017 - Present

      Install and maintain wiring, control and lighting system. Inspect electrical component, sush as circuit breakers. Repair or replace wiring, equipment, or fixtures using hand tools and power tools.Clients:- Telekom Malaysia Berhad, TM Tower, Bangsar, Malaysia- Mercedes Benz HQ, Mutiara Damansara, Malaysia- Mah Seng Property Holding Berhad, Malaysia Install and maintain wiring, control and lighting system. Inspect electrical component, sush as circuit breakers. Repair or replace wiring, equipment, or fixtures using hand tools and power tools.Clients:- Telekom Malaysia Berhad, TM Tower, Bangsar, Malaysia- Mercedes Benz HQ, Mutiara Damansara, Malaysia- Mah Seng Property Holding Berhad, Malaysia

    • Project Coordinator Services & Maintenance
      • Jan 2017 - Jun 2017

      Carry out site survey and site meeting. To report and update the services and maintenance works to supervisor. Monitor and check and condition of site tools, equipment, machinery, transport, safety PPE & material. Ensure always in good condition and well keeping.Clients: -Hospital Subang Medical Centre (Sime Darby), Subang, Malaysia-Sultan Salahuddin Abdul Aziz Power Plant Station, Klang, Malaysia Carry out site survey and site meeting. To report and update the services and maintenance works to supervisor. Monitor and check and condition of site tools, equipment, machinery, transport, safety PPE & material. Ensure always in good condition and well keeping.Clients: -Hospital Subang Medical Centre (Sime Darby), Subang, Malaysia-Sultan Salahuddin Abdul Aziz Power Plant Station, Klang, Malaysia

    • Electrical Supervisor
      • May 2017 - May 2017

      - Standby person at Fire Fighting Control Room - Installation & Maintenance panel Co2 fire systemClient: Sultan Salahuddin Abdul Aziz Power Plant Station, Klang, Malaysia - Standby person at Fire Fighting Control Room - Installation & Maintenance panel Co2 fire systemClient: Sultan Salahuddin Abdul Aziz Power Plant Station, Klang, Malaysia

    • Malaysia
    • Higher Education
    • 700 & Above Employee
    • Electrician
      • Dec 2016 - Dec 2016

      - Hook-up power supply three phase to control panel machine at Block 5 (Electrical & Electronic).- Assembly solar power installation at Solar Testing Facility Center of Innovation Nanostructures Nanodevices (COINN). - Hook-up power supply three phase to control panel machine at Block 5 (Electrical & Electronic).- Assembly solar power installation at Solar Testing Facility Center of Innovation Nanostructures Nanodevices (COINN).

    • Electrician
      • Jan 2016 - Jun 2016

      - Draw 3D design for client referrals.- Standby control pump at site site & EX Equipment installation.- Rewiring EX control panel. - Troubleshoot all wiring motor control from 240V - 415VClients:-- Petronas Chemical MTBE Sdn Bhd, Kuantan, Malaysia- Petronas Penapisan Terengganu Sdn Bhd, Terengganu, Malaysia - Draw 3D design for client referrals.- Standby control pump at site site & EX Equipment installation.- Rewiring EX control panel. - Troubleshoot all wiring motor control from 240V - 415VClients:-- Petronas Chemical MTBE Sdn Bhd, Kuantan, Malaysia- Petronas Penapisan Terengganu Sdn Bhd, Terengganu, Malaysia

    • Wireman
      • Dec 2015 - Dec 2015

      - Lay underground high voltage (HV) and low voltage (LV) cables & lay overhead cables & perform electrical substation. - Install & Maintenance street lighting system. Clients: - Tenaga Nasional Berhad (TNB)- Jabatan Kerja Raya (JKR) - Lay underground high voltage (HV) and low voltage (LV) cables & lay overhead cables & perform electrical substation. - Install & Maintenance street lighting system. Clients: - Tenaga Nasional Berhad (TNB)- Jabatan Kerja Raya (JKR)

    • Wireman
      • Jul 2013 - Dec 2013

      - Wiring lighting & power system operation - Replace defective wiring and equipment.- Repair street light problem, maintenance panel street light with perform break & perform breakdown works.Clients:-- Jabatan Kerja Raya (JKR)- Tenaga Nasional Berhad (TNB) - Wiring lighting & power system operation - Replace defective wiring and equipment.- Repair street light problem, maintenance panel street light with perform break & perform breakdown works.Clients:-- Jabatan Kerja Raya (JKR)- Tenaga Nasional Berhad (TNB)

    • Wireman
      • Jan 2013 - Jun 2013

      - Installation & maintenance for Vacuum Circuit Breaker (VCB).- Installation power supply incoming & outgoing for Step Up Transformer 415V to 11kv. - Street light installation.- Hack wall to put power point, earthing & lighting protection system installation. Clients:-- Tenaga Nasional Berhad (TNB), Malaysia- Jabatan Kerja Raya (JKR), Malaysia- Syariah Court ,Seri Iskandar, Malaysia - Installation & maintenance for Vacuum Circuit Breaker (VCB).- Installation power supply incoming & outgoing for Step Up Transformer 415V to 11kv. - Street light installation.- Hack wall to put power point, earthing & lighting protection system installation. Clients:-- Tenaga Nasional Berhad (TNB), Malaysia- Jabatan Kerja Raya (JKR), Malaysia- Syariah Court ,Seri Iskandar, Malaysia

Education

  • UNIVERSITI MALAYSIA PAHANG
    Diploma in Electrical Engineering Technology, 3.61 CGPA
    2019 - 2020
  • Advanced Technology Training Center (ADTEC) Kemaman
    Professional Certificate, Oil and Gas Technology (Electrical Engineering- Plant Downstream)
    2014 - 2016

Community

You need to have a working account to view this content. Click here to join now