Dylan Flatman

Team Leader at DARCHEM ENGINEERING LIMITED
  • Claim this Profile
Contact Information
Location
England, United Kingdom, UK

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Team Leader
      • Nov 2021 - Present

    • Plating chargehand
      • Apr 2021 - Nov 2021

      Hinckley Point Contract

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Mechanical Technician
      • Jul 2020 - Jan 2021

      Pile Gripper Installation on the Moray East jackets for the installation of the jackets to the sea bed, this included working closely with DEME Group client representatives on inspection of the pile grippers which had to be mechanically torqued to the jacket. Our scope also included the full load out of all 55 jackets from the Smulders site onto the barge to be relocated to Nigg bay dock before installation. Pile Gripper Installation on the Moray East jackets for the installation of the jackets to the sea bed, this included working closely with DEME Group client representatives on inspection of the pile grippers which had to be mechanically torqued to the jacket. Our scope also included the full load out of all 55 jackets from the Smulders site onto the barge to be relocated to Nigg bay dock before installation.

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Supervisor/Chargehand Mechanical technician
      • Jun 2020 - Jul 2020

      Full internal fit out of transition pieces for the Hornsea 2 project, covering scopes including ladder/lift installation as well as davit cranes, full internal and external platforms including all safety equipment and climbing equipment. Full internal fit out of transition pieces for the Hornsea 2 project, covering scopes including ladder/lift installation as well as davit cranes, full internal and external platforms including all safety equipment and climbing equipment.

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Chargehand/mechanical technician
      • Nov 2019 - Jun 2020

      Full construction and fit out of the internal platforms for the transition pieces for Hornsea 2 including steelwork, ladders, lifts as well as the full snag list from inspectors/client representatives. Full construction and fit out of the internal platforms for the transition pieces for Hornsea 2 including steelwork, ladders, lifts as well as the full snag list from inspectors/client representatives.

    • Supervisor/chargehand mechanical technician
      • Aug 2019 - Nov 2019

      Chargehand/Supervisor working along side senior management on the Borselle project following a promotion to oversee the snagging lists given by inspection and client representatives that I worked closely with on this project to ensure that it was finished on time.

    • Mechanical Technician
      • Jun 2019 - Nov 2019

      Construction/Fit out of transition pieces for the Borselle wind farm. Working along side a team of technicians/outfitters on installing all parts of the transition pieces from davit cranes to platforms and wires on boat landing areas as well as full internal installation of switchgear units and blast walls.

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Fabricator (Apprentice)
      • Sep 2014 - Nov 2019

      Apprenticeship role which I completed early, covering a range of scopes from modular to fire and blast wall experience as well as the full fit out of modules including electrical switchgear and assisting with HVAC installation.

    • Time served fabricator
      • Sep 2014 - Nov 2019

      Full bespoke modular fit out and installation including blast doors and electrical equipment, working from snag lists from inspectors to ensure the project was completed correctly and up to standards. Multiple trips offshore installing the escape tunnel and doors on the Mariner B platform in the North Sea.

Community

You need to have a working account to view this content. Click here to join now