Dustin Brown
Survey Party Chief at Encompass Energy Services, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Encompass Energy Services, LLC
-
United States
-
Oil and Gas
-
100 - 200 Employee
-
Survey Party Chief
-
Oct 2020 - Present
Oil and Gas, Overhead Transmission lines, ALTA, Boundary Oil and Gas, Overhead Transmission lines, ALTA, Boundary
-
-
-
Blew & Associates, P.A.
-
United States
-
Civil Engineering
-
100 - 200 Employee
-
Survey Party Chief
-
Dec 2019 - Jun 2020
-
-
-
Encompass Energy Services, LLC
-
United States
-
Oil and Gas
-
100 - 200 Employee
-
Survey Crew Chief
-
Nov 2018 - Oct 2019
-
-
-
UniversalPegasus International
-
United States
-
Oil and Gas
-
200 - 300 Employee
-
Survey Party Chief
-
Apr 2018 - Nov 2018
-
-
-
Hatch Mott MacDonald
-
United States
-
Civil Engineering
-
500 - 600 Employee
-
Crew Chief
-
Sep 2015 - Mar 2018
Managed a crew of 3. Worked multiple projects across multiple states. Complete boundary surveys, as-builts, construction staking, topographic surveys, and corridor surveys. Managed a crew of 3. Worked multiple projects across multiple states. Complete boundary surveys, as-builts, construction staking, topographic surveys, and corridor surveys.
-
-
-
Directional Project Support (DPS)
-
St. Clairsville, OH
-
Survey Crew Chief
-
Mar 2015 - Jul 2015
-
-
-
Stantec
-
Canada
-
Design Services
-
700 & Above Employee
-
Crew Chief
-
Jan 2014 - Apr 2015
-
-
Instrument Man
-
Mar 2014 - May 2014
Utilize GPS and Total station for profiling, centerline staking, Limits of Disturbance Staking, As-Built, Re-Routing, recording accurate documentation
-
-
-
Aerotek
-
United States
-
Staffing and Recruiting
-
700 & Above Employee
-
Instrument Operator
-
Jan 2014 - Mar 2014
-
-
-
SAM Companies
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Instrument Operator
-
Dec 2011 - Nov 2013
Utilize GPS and Total stations to calculate points, stake out coordinates, create Centerline used for proposed pipeline route, record coordinates on all bends, welds, and all other pertinent aspects of building a pipeline. Record data in field book accurately and neatly necessary for field work, ensure all data is correct and error free Utilize GPS and Total stations to calculate points, stake out coordinates, create Centerline used for proposed pipeline route, record coordinates on all bends, welds, and all other pertinent aspects of building a pipeline. Record data in field book accurately and neatly necessary for field work, ensure all data is correct and error free
-
-
-
CEI Engineering Associates, Inc.
-
United States
-
Civil Engineering
-
100 - 200 Employee
-
Instrument Operator
-
Mar 2011 - Nov 2011
Used GPS and Total station to stake calculated points, find and locate boundary corners including township and section corners, located existing pipelines and utilities, recorded data on As-Built phase, completed ALTA surveys, set control including static control points Used GPS and Total station to stake calculated points, find and locate boundary corners including township and section corners, located existing pipelines and utilities, recorded data on As-Built phase, completed ALTA surveys, set control including static control points
-
-
-
-
Instrument Operator
-
May 2010 - Dec 2010
learned basic principles of restake phase of a pipeline, acquiring experience on the use of GPS technology and total station. Familiarized myself with an electronic pipeline locator, probed for foreign lines, and recorded data on the As-Built phase learned basic principles of restake phase of a pipeline, acquiring experience on the use of GPS technology and total station. Familiarized myself with an electronic pipeline locator, probed for foreign lines, and recorded data on the As-Built phase
-
-
Education
-
Ashland Community and Technical College