PT Lontar Papyrus Pulp & Paper Industry
-
Paper and Forest Product Manufacturing
-
200 - 300 Employee
-
Shift Leader Power Plant Boiler
-
Apr 2020 - Present
Shift Leader Power Plant Boiler All Boiler, Coal Handling and Bark Yard : 1. Type CFB 1 x 440 T/H, 2. Type CFB 1 x 220 T/H, 3. Type MB 2 x 140 T/H, 4. Type PCB 1 x 110 T/H, 5. Coal Handling, 6. Bark Yard, etc. Shift Leader Power Plant Boiler All Boiler, Coal Handling and Bark Yard : 1. Type CFB 1 x 440 T/H, 2. Type CFB 1 x 220 T/H, 3. Type MB 2 x 140 T/H, 4. Type PCB 1 x 110 T/H, 5. Coal Handling, 6. Bark Yard, etc.
-
-
-
Asia Pulp & Paper
-
Indonesia
-
Paper and Forest Product Manufacturing
-
700 & Above Employee
-
-
Sep 2017 - Apr 2020
CFB Boiler Capacity 440 T/H (100 MW) : Control DCS boiler on approved procedure, Coordination with Field Engineer & Mechanical / Electrical team, Indentify the dangerous potential during operational boiler, Respon & control emergency situation, Stop boiler, Boiler interlock system, Reporting, Shutdown, Inspection, Improvement, Hydrotest, Start up boiler, Boiler analysis efficiency ASME PTC 4-1, Report condition disturbance finding and latest update about boiler operation.
-
-
-
May 2018 - May 2018
Project Replacement Loopseal & Cyclone (MB#24) Boiler CFB Capacity 440 T/H
-
-
-
Nov 2017 - Nov 2017
Project Replacement Loopseal (MB#23) CFB Boiler Capacity 220 T/H
-
-
-
Aug 2016 - Aug 2017
Multifuel Boiler MB 140 T/H (35 MW) : Control DCS boiler on approved procedure, Coordination with Field Engineer & Mechanical / Electrical team, Indentify the dangerous potential during operational boiler, Respon & control emergency situation, Stop boiler, Boiler interlock system, Reporting, Shutdown, Inspection, Improvement, Hydrotest, Start up boiler, Boiler analysis efficiency ASME PTC 4-1, Report condition disturbance finding and latest update about boiler operation.
-
-
-
Jun 2017 - Jul 2017
Project Replacement Economizer & Boiler Bank MB#21 (Multifuel Boiler) Capacity 140 T/H
-
-
-
Apr 2017 - May 2017
Project Replacement Economizer & Boiler Bank MB#22 (Multifuel Boiler) Capacity 140 T/H
-
-
-
PT Toba Pulp Lestari, Tbk
-
Porsea
-
Kerja Praktek
-
Dec 2014 - Dec 2014
Title : "Analisis Efisiensi Multifuel Boiler Menggunakan Metoda Tidak Langsung di PT. Toba Pulp Lestari, Tbk" Title : "Analisis Efisiensi Multifuel Boiler Menggunakan Metoda Tidak Langsung di PT. Toba Pulp Lestari, Tbk"
-
-