Donatien Koffi

Radio Network Planning and Optimization Engineer at Telinno Consulting Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Côte d'Ivoire, CI

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Telecommunications
    • 100 - 200 Employee
    • Radio Network Planning and Optimization Engineer
      • Apr 2013 - Present

      Since 22 April 2013: Radio Network Optimization Engineer at TELINNO-Consulting 2G swap project and 3G Optimization (UTRAN Network) for Orange: Alcatel Equipments - RF Optimization (Change physical and logical parameters) - KPIs monitoring and network performance analysis - Drive test analysis, data processing and reporting, Plan drive route and perform drive test - Analysis RF coverage and quality issues using Tems Investigation V.9 /10/13 and actix Show less

    • China
    • Telecommunications
    • 700 & Above Employee
    • RADIO NETWORK PLANNING AND OPTIMIZATION ENGINEER
      • Aug 2011 - Apr 2013

      MTN UMTS PROJECT, deployment and optimization of UTRAN Network - Site survey - Commissioning and WCDMA sites integrated - Drive test (Single Site Verification, cluster) and output the reports (Genex Probe V.3 and Genex Assistance V.3) - Performance monitoring and troubleshooting maintain and improve the KPIs - Call trace analysis and RF troubleshooting - Network monitoring throughput (Uplink interference, Low throughput, Block call….) - UMTS M2000 command - Customer complaint. December 2011 to September 2012: ORANGE and MTN WIMAX PROJECT - Site survey - Drive test (Single Site Verification, cluster) and output the reports - RF Optimization (Change physical and logical parameters) - KPIs monitoring and network performance analysis - Site configuration scripts check and update the configuration from M2000 - Wimax M2000 command - Complain handling process - Network parameters planning (Frequency planning, Capacity planning, neighbors….) - Commissioning of site. August to November 2011: MTN SWAP GSM PROJECT - Single Site Verification and cluster drive test - Output the reports. - Drive test and RF Optimization (Change physical and logical parameters) - KPIs monitoring and network performance analysis Show less

    • RADIO NETWORK OPTIMIZATION ENGINEER
      • Mar 2010 - Jun 2010

      -Optimization of area 1 and 3 (120 sites) of GreenN Network Ivory Coast -QoS and Drive Test Log File analysis -Keep Drive Test data - Keep the main KPI Good (Call Setup Success Rate, Call Drop Rate, Handover Success Rate, Congestion rate) at the regulator (ATCI threshold). - Analyze Drive Test file and QoS statistics in order to give solution for optimization. - Change physical and logical parameters according to Network evolution. - CQT and Drive Test for new sites integrations. - Interface with the commercial service in view of the management of the complaints customers and integrations of new services. - Site Survey - Capacity and coverage prediction for new sites integration. Show less

  • MTN COTE D'IVOIRE
    • ABIDJAN COTE D'IVOIRE
    • RADIO NETWORK OPTIMIZATION ENGINEER
      • Aug 2008 - Dec 2008

      - Site Survey. - Keep the main KPI Good (Call Setup Success Rate, Call Drop Rate, Handover Success Rate, Congestion rate) at the regulator (ATCI threshold). - Analyze Drive Test file and QoS statistics in order to give solution for optimization - Drive test in the area in order to ensure coverage, qualities, HOSR, CSSR are still goods - Change physical and logical parameters according to Network evolution - Drive test data analyze - Call Quality test -Benchmarking - Site Audit: To identify site, antenna high, Azimuth, Tilt, type of BTS rack and antenna ……. - Creating an investigation method for radio main counters. - Get out the different network problems and give solutions. Show less

Education

  • EST LOKO UNIVERSITY COTE D'IVOIRE
    Telecommunication Engineer (BAC+5), TELEOMMUNICATIONS
    2005 - 2008
  • EST LOKO UNIVERSITY COTE D'IVOIRE
    Associate degree in Telecommunication (BAC+2), TELECOMMUNICATIONS
    2003 - 2005
  • LYCEE MODERN COFFI GADEAU COTE D'IVOIRE
    Scientific Baccalaureate., Scientific
    2002 - 2003

Community

You need to have a working account to view this content. Click here to join now