Donald Gellanggao

Senior Piping Supervisor at Plant Engineering Construction, Singapore
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Sarawak, Malaysia, MY
Languages
  • Tagalog Full professional proficiency
  • English Full professional proficiency
  • Japanese Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Senior Piping Supervisor

      * Liaise with client site Superintendent or Supervisor in-charge for any special instructions, coordination, advance information, FDC & modifications and other relevant issues and concerns towards work scope as well as safety matters; * Supervise and deal with subcontractors for site erection of pipe spools and pipe supports * Prepare and organizes permit to work and overtime request to client prior to execution * Attends timely progress construction meeting and coordination meeting with client and other disciplines involve * Defines test limits on piping and instrumentation diagram and isometric drawings and compile it with necessary checklist for punchlist, hydrotesting, flushing and reinstatement * Prepares structural and equipment packages (G.A drawing, plot plan, P & IDs and other relevant document) with necessary checklist for alignment & leveling with respect to foundation and skid condition * Linechecks and coordinates to subcontractors for punch clearing prior to hydrotesting * Prepares permit to work and executes piping erection, pressure testing, flushing and air blowing as per test package * Coordinates and assists final inspection with client for pressure test acceptance * Coordinates with subcontrators for reinstatement of lines after pressure test acceptance * Controls the flow of test packages and coordinates with client for signatory approval prior to turnover of test packages * Examines material delivered to construction departments to verify conformance to specifications. * Prepares report to Project Control Manager for the status of the materials * Attends progress meeting for updates and status on site activities * Plans and organizes the movement of pipe spools/ supports from laydown area to paint yard and construction site * Flange face alignment between equipment nozzle and piping flange connection * Pump alignment and leveling against the skid. Show less

    • Supervisor Piping
      • Jul 2008 - Jul 2013

      Liaise with client site Superintendent or Supervisor in-charge for any special instructions, coordination, advance information, FDC & modifications and other relevant issues and concerns towards work scope as well as safety matters; Supervise and deal with subcontractors for site erection of pipe spools and pipe support; Ensures pipe spools and pipe supports are fabricated according to isometric drawing prior to site erection; Prepares and organizes permit to work and overtime request to client prior to execution; Attends timely progress construction meeting and coordination meeting with client and other disciplines involve; Defines test limits on piping and instrumentation diagram and isometric drawings and compile it with necessary checklist for punchlist, hydrotesting or pneumatic test, flushing and reinstatement; Prepares structural and equipment packages (G.A drawing, plot plan, P & IDs and other relevant document) with necessary checklist for alignment & leveling with respect to foundation and skid condition Revises piping test packages, equipment and structural packages as per client comment and newly revised P & ID and isometric drawings as per site condition Linechecks and coordinates to subcontractors for punch clearing prior to hydrotesting Prepares permit to work and executes piping erection, pressure testing, flushing and air blowing as per test package Coordinates and assists final inspection with client for pressure test acceptance Coordinates with subcontrators for reinstatement of lines after pressure test acceptance Controls the flow of test packages and coordinates with client for signatory approval prior to turnover of test packages; Prepares report to Project Control Manager for the status of the materials; Attends progress meeting for updates and status on site activities Flange face alignment between equipment nozzle and piping flange connection Pump alignment and leveling against the skid. Show less

    • Production Planner
      • May 2005 - Jun 2008

      Generate production planning and scheduling based on customer requirements in terms of quantity, quality and delivery timing to meet customer satisfaction Responsible in controlling and distribution of required manpower, tools, machines or equipment and other relevant resources in order to maintain smooth and continuous production flow Team builder and organize new product sample and development Perform product and process review for continuous improvement in order to address production efficiency and cost reduction requirement Plan out preventive and corrective maintenance on the pneumatic, hydraulic and mechanical machines Designs an improvement of pneumatic machines to lessen downtime and energy losses Checks quality of the product if it meets the standard and tolerances Show less

    • Production Leader
      • Jul 2002 - Dec 2004

      Ensure output of products meet the production schedule in each shift Ensure the activities of all personnel in production conforms that of ISO 9001:2000 requirements Ensure production efficiency at Production Department Ensure that each process specification is running effectively Control material stock balance within each section Make sure that the overall manpower is well distributed and balanced Ensure that the finished products meet the process specification, quality level and delivery time Analyze root cause of quality problems and take corrective and preventive actions Make sure the effectiveness of the corrective and preventive actions Make sure training schedule for each training section as needed Take full charge of supervision and motivate the assistant leaders and operators Show less

Education

  • Cebu Institute of Technology
    Bachelor of Engineering (BEng), Mechanical Engineering
    1988 - 1993
  • Cebu Institute of Technology
    Bachelor of Science, Mechanical Engineering
    1988 - 1993

Community

You need to have a working account to view this content. Click here to join now