Don Shriver
Piping Designer at Venture Engineering & Construction, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
Venture Engineering & Construction, Inc.
-
United States
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Piping Designer
-
Mar 2022 - Present
-
-
Piping Designer
-
Mar 2022 - Present
-
-
-
Audubon Companies
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Piping Designer
-
May 2018 - Mar 2020
-
-
-
Matrix PDM Engineering
-
United States
-
Construction
-
100 - 200 Employee
-
Senior Piping Designer
-
Dec 2016 - Apr 2018
-
-
-
Houston Interests
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Senior Piping Designer
-
Jul 2016 - Nov 2016
Went to Compressor Station sites to gather field measurements and information to be able to add redundant Vapor Recovery Units at each site. once the information was gathered designed the piping and supports to allow the units to be place where the client wanted them located. Once the piping was completed, created Orthographic drawings containing of Plans and Sections, along with Isometric and Bill of Material drawings for each site. Worked with the Project Engineer, Piping Lead and Designers designing and layout of natural gas compressor station. Given the project boundary along with equipment and was responsible for the design and layout of piping routes from equipment to equipment and piping modules to equipment. Once area was completed, created Orthographic drawings containing of Plans and Sections, along with Isometric and Bill of Material drawings. Show less
-
-
-
Hunt Guillot & Associates (HGA)
-
United States
-
Business Consulting and Services
-
200 - 300 Employee
-
Piping Designer
-
Jan 2015 - Jun 2016
Worked with the project Engineer and was responsible for the design and layout of natural gas compressor stations. Given the project boundary along with equipment and was responsible for the design and layout of piping routes from equipment to equipment. Once area was completed, created Orthographic drawings containing of Plans and Sections, along with Isometric and Bill of Material drawings. Worked with the project Engineer and was responsible for the design and layout of natural gas compressor stations. Given the project boundary along with equipment and was responsible for the design and layout of piping routes from equipment to equipment. Once area was completed, created Orthographic drawings containing of Plans and Sections, along with Isometric and Bill of Material drawings.
-
-
-
Carnegie Strategic Design
-
Pittsburgh, PA
-
Piping Designer
-
Sep 2012 - Jan 2015
Worked with the project team and was responsible for the design and layout of pipeline routes in different areas of the plants. Given an area along with equipment and was responsible for the piping routes from equipment to equipment/pipe rack. Once area was completed, created isometric drawings and a Bill of Materials using Microsoft Excel to sort and combine the data to achieve an organized completed Bill of Materials. Worked with the project team and was responsible for the design and layout of pipeline routes in different areas of the plants. Given an area along with equipment and was responsible for the piping routes from equipment to equipment/pipe rack. Once area was completed, created isometric drawings and a Bill of Materials using Microsoft Excel to sort and combine the data to achieve an organized completed Bill of Materials.
-
-
-
Wind Ridge Engineering
-
Wind Ridge, PA
-
CAD Drafter
-
Mar 2012 - Sep 2012
Received field points form survey crew to create parcel plots and/or proposed waterline/sewer routes. Once a route was determined, generated a profile for the specified route. Received field points form survey crew to create parcel plots and/or proposed waterline/sewer routes. Once a route was determined, generated a profile for the specified route.
-
-
-
Nichols and Slagle Engineering
-
Moon Township, PA
-
Senior CAD Designer
-
Mar 2002 - Mar 2012
Responsible for the design and layout of water/sewer routes for multiple clients each year. Along with the waterline routes, some jobs included the design of new or the renovation of existing pump lift stations. Responsible for GIS layout and updating maps for client waterlines valves and fire hydrant locations. Assigned to the field to oversee the installation of water/sewer line installations. Responsible for the design and layout of water/sewer routes for multiple clients each year. Along with the waterline routes, some jobs included the design of new or the renovation of existing pump lift stations. Responsible for GIS layout and updating maps for client waterlines valves and fire hydrant locations. Assigned to the field to oversee the installation of water/sewer line installations.
-
-
-
Montgomery and Associates
-
Washington, PA
-
CAD Designer
-
Jan 2001 - Aug 2001
Patent drafting of clients ideas to send to the patent office for approval. Patent drafting of clients ideas to send to the patent office for approval.
-
-
-
Aquatech
-
United States
-
Environmental Services
-
300 - 400 Employee
-
CAD Designer
-
Mar 1996 - Oct 2000
Responsible for the design of pump and blower skids. Once the routing was completed, created isometric piping drawings. Using Microsoft Excel, created Bill of Materials for each isometric drawing. Responsible for the design of pump and blower skids. Once the routing was completed, created isometric piping drawings. Using Microsoft Excel, created Bill of Materials for each isometric drawing.
-
-
-
Cmi General Contractors
-
United States
-
Construction
-
1 - 100 Employee
-
Construction Laborer
-
Dec 1993 - May 1995
Laborer duties Laborer duties
-
-
-
M.K. Ferguson
-
Cleveland, Ohio Area
-
CAD Designer
-
Jul 1992 - Feb 1993
Isometric Piping Isometric Piping
-
-
Education
-
Pittsburgh Technical Institute
Associate’s Degree, Architectural Drafting and Architectural CAD/CADD