Dom Santos. Jr

Rigging Specialist at Republic Cement Services Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Calabarzon, Philippines, PH
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Basic Occupational Safety and Health Training Course (BOSH)
    -
    Jun, 2018
    - Oct, 2024
  • Global Overseas Training Institute for Heavy Equipment Operators and Skills Development / TESDA
    -
    Oct, 2017
    - Oct, 2024
  • ABS Group Inc: Rigging Supervisor Competency Training
    -
    Jan, 2016
    - Oct, 2024
  • RIGGER LEVEL 3 ARAMCO CERTIFIED
    -
    Mar, 2014
    - Oct, 2024
  • Practical Training Experience - Samsung Engineering
    -
    Oct, 2012
    - Oct, 2024
  • National Inspection and Technical Testing Co. LTD FAHSS/TUV Saudi Arabia
    -
    Mar, 2012
    - Oct, 2024
  • LEVEL 2 RIGGER CERTIFIED
    -
    Dec, 2011
    - Oct, 2024
  • HS2 AND BREATHING APPARATUS FAMILIARIZATION COURSE
    -
    Mar, 2008
    - Oct, 2024
  • WORKING AT HEIGHT
    -
    Jan, 2008
    - Oct, 2024
  • BASIC FIRE FIGHTING
    -
    Nov, 2007
    - Oct, 2024
  • H2S/SO2 AWARENESS
    -
    Nov, 2007
    - Oct, 2024
  • O.E.T. CRANE SAFE WORKING PRACTICE
    -
    Jan, 2004
    - Oct, 2024

Experience

    • Philippines
    • Wholesale Building Materials
    • 100 - 200 Employee
    • Rigging Specialist
      • Sep 2018 - Present

    • Rigging Supervisor
      • Jan 2016 - Present

      ● Implementing safety standard of work, identifying risk, enforcing company rules. ● Supervises and coordinate activities of workers who are engaged in all rigging and lifting perform the task safely. ● Maintain proper signal in lifting engaged in hoisting and moving load to ensure safety of workers and material handle. ● Manual lifting and positioning of various machines, loading and unloading transferring and handling. ● Machinery relocation – moving and lashing.

    • Rigging Supervisor
      • Dec 2015 - Present

      ● Planning, arrangement, and measuring of length and height. Road turning checkup from area of pick up to unboarding.● Conduct random on site equipment and area of works, soil stability for crane position.● Confirm that all health and safety regulation are being followed.● Inspect all documents, working permit and 3rd party certificate of crew, lifting plans for Toolbox meeting purposes.● Manpower distribution on which to assign and coordination from vendor to the Department head.● Commence lifting with standard procedure and orientation.● Assigned Mechanical Department in which Various Vessel and Module have been installed and erected.● Manual Rig –up of pump vessel ●Conduct orientation of new employees and transferee from other sites on Basic Safety Lifting, Scalfolding, working at height, and health hazards.

    • Rigging Supervisor
      • Jan 2012 - Apr 2015

      ● Installation, preparation, crane set up and supervision of all type of heavy lifting from Mechanical equipment and Stationary vessel, coordinating from all departments on lifting and weight and type of load to install. Including paperwork, report, planning and scheduling of the lift. Manpower deployment on each activities, from hauling to erection.● Prepare and coordinate safety manager ensuring applicable safety and health standards like work being done close to active gas line.● Check and verify that workers were properly using PPE for the planning and confirm the job risk control were implemented to the job.●Weekly site inspection and walk through with the client, HSE Officer, and Supervisor of other Departments.● Conduct orientation of new employees and transferee from other sites on Basic Safety Lifting, Scaffolding, and working at height.

    • South Korea
    • Construction
    • 700 & Above Employee
    • Rigging Foreman
      • Oct 2009 - Nov 2011

      1. Coordinates and installation of equipment from pumps ,vessel 2. Arrangement and check up of equiptment to be install to see any damage before erection 3.Hauling and securing the load during travelling to the area of installation4. Check and inspection of all lifting tackles to be use5. To ensure work quality and safety at all time 1. Coordinates and installation of equipment from pumps ,vessel 2. Arrangement and check up of equiptment to be install to see any damage before erection 3.Hauling and securing the load during travelling to the area of installation4. Check and inspection of all lifting tackles to be use5. To ensure work quality and safety at all time

    • Rigger Foreman
      • Oct 2007 - Oct 2008

      1.Involvement was mainly on the erection and of various refinery equipments and machineries such as Pump and Motors, Recycle Compressors, Fin Fan Coolers, Preheater, Gas boiler, Combustion Air Fans, Column an Reactor Vessel and other Static Rotating Mechanical equipments available in the project. 2.Instalattion and erection of Piping spool to the vessel and to the pipe rack,from MOV valves and heavy wall pipes 3.installation and erection of Duct Bank,Manhole and various HVAC equipmet

    • Rigger
      • Aug 2006 - Sep 2007

      1. Gas Turbine and clean turbine Generator Department2. Involvement was in erection and assembly of mechanical equipment and piping system at site location as per plan and detailed drawings. Such equipment are the following: SIEMENS V94.3A Gas Turbines and Generators, GTG Accessory Modules, Water and Fuel Pump Skids, Liquid Fuel Atominizing Air Modules, Package Electrical/ Electronic Control Center, Liquefied Carbon Dioxide Storage Tank, Sound Protection Enclosure and Ven Ducts, Fin Fan Coolers and other Mechanical accessory installations.3. Hauling,Assembling,erection of structure

    • Rigger
      • Feb 2005 - Mar 2006

      1. Manual rig-up of pipe and pipe spool to pipe rack2. Installation of Vessel3. Erection and assisting boogie truck from the location where the vessels are to be installed.4. Unloading of Container van, equipment tools and other construction equipments. 1. Manual rig-up of pipe and pipe spool to pipe rack2. Installation of Vessel3. Erection and assisting boogie truck from the location where the vessels are to be installed.4. Unloading of Container van, equipment tools and other construction equipments.

    • RIGGER
      • Apr 2002 - Feb 2003

      1. Assisting crane operator on signaling all lifting activities including heavy lift and hauling activities.2. Unloading of rebar from assembling of crane from the boom to counter weight3. Unloading of construction tools, and equipments. 1. Assisting crane operator on signaling all lifting activities including heavy lift and hauling activities.2. Unloading of rebar from assembling of crane from the boom to counter weight3. Unloading of construction tools, and equipments.

    • Rigger /Erector / Fabricator
      • Apr 1992 - May 1993

      1. Manual rig-up, insertion of pipe to the pipe rack2.Install vessel tank, turbine, pump and operator flat form3. Erecting overflow pipe4. Fabricating of pipe support and operator flat form5. Repair of tank vessel ladder6. Assist in leveling of pump and turbine to the mechanical filter7. Loading and unloading of spool pipe, assist on pipe filter on fitting pipe 1. Manual rig-up, insertion of pipe to the pipe rack2.Install vessel tank, turbine, pump and operator flat form3. Erecting overflow pipe4. Fabricating of pipe support and operator flat form5. Repair of tank vessel ladder6. Assist in leveling of pump and turbine to the mechanical filter7. Loading and unloading of spool pipe, assist on pipe filter on fitting pipe

Education

  • Philippine Maritime Institute
    Engineering(Marine), nautical Science
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now