Djan FANNY, PMP®

Director of Operations at Greater Abidjan Urban Mobility Authority (AMUGA)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Côte d'Ivoire, CI
Languages
  • Français Native or bilingual proficiency
  • Anglais Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management Professional (PMP)®
    Project Management Institute
    Sep, 2018
    - Oct, 2024

Experience

    • Director of Operations
      • Oct 2020 - Present

      - Management of the Directorate - Definition of the modalities for issuing transport authorizations - Ensures compliance with regulations - Establishment of the mechanism for collecting long-term fiscal and parafiscal resources - Monitoring of the implementation of the urban transport integration plan in Greater Abidjan - Monitoring of the implementation of public service delegation agreements - Analyzes the operating results of transport operators - Monitoring of network development - Monitoring and evaluation of the performance of different modes of transport - Monitoring and operation of the virtual engagement center for stakeholders - Monitoring of the implementation and development of interoperability - Monitoring of the performance of the different modes of transport - Definition of the taxation applicable to the sector - Establishment and animation of a permanent consultation framework with all stakeholders in urban mobility in Abidjan Show less

    • Côte d'Ivoire
    • Civil Engineering
    • 100 - 200 Employee
    • Senior Transportation Economist
      • Jun 2019 - Nov 2020

      Activities & Projects implementation - Development of guidelines for the implementation of Traffic studies and economic analysis [Economic Rate of Return (ERR)] of road projects (ongoing) - Development of guidelines for the management of PPP road investment projects; - Preparation of TORs for the of the socio-economic impacts’ assessment of road projects in the northern area of Cote d'Ivoire by the Department of Economics and Social Sciences of the Alassane Ouattara University of Bouaké; - Preparation of speeches for the President of the Republic or the Prime Minister and the Minister of Equipment and Road Maintenance for the launches and inauguration of road projects and engineering structures; - Participation within the follow-up committees of Donors project impacts assessment missions (TORs, baselines, final assessment, etc.); - Member of the AGEROUTE Investment Management and projects Coordination Committees Transportation Economist, everyday scope of work - Definition of scope and validation of economic feasibility studies carried out by design offices and Consultants; - Design and development of project sheets for the of Côte d'Ivoire future growth centers’ access roads; - Preparation of Terms of Reference for traffic studies and ERR assessment of future road projects Show less

    • Expert Transport Economist
      • Sep 2016 - May 2019

      Development Phase of the Côte d’Ivoire Compact Collection of socio-economic data for all the economic analysis of the investments : FER tolls traffic , the AGEROUTE Road Dataset, Stata datasets of the 2015 Household Survey, the 2013 and 2016 Employment Surveys as well as the Financial dataset from Institut National de la Statistique (INS) Analysis of Cost-Benefit Models of Projects [MCC Investment Criteria]: • Abidjan Transport Project (ATP) Economic evaluation of road projects in Abidjan - Review of HDM4 models of the following roads projects : Boulevard Valéry Giscard d'Estaing (VGE), Boulevard de la Paix, Boulevard du Port + Boulevard de Vridi, Yopougon Expressway - Design and Review of the Excel Model including the benefits calculated with HDM4 and other exogenous benefits such as road safety, monetary value of time savings and resulting from the reordering of the 11 VGE intersections • Regional Investment [Drooped thereafter] Economic evaluation of intercity road projects - Review of HDM4 models of the following road : Abidjan-San Pédro, Tiébissou-Bouaké, Ouangolo-Mali border, Ouangolo-Burkina Faso border Economic evaluation of the crossing of the Bay of Biétry - Review of the Economic Cost-Effectiveness Analysis of the Project: Evaluation of Time Savings, Vehicle Operating Costs and Road Safety - Assessment of land rental costs in the port area by a Focus Group based on the Delphi Method with industrial land experts in the port area • Skills for Employability and Productivity Project Contribution to the design and review of business models for the following projects: - Construction of (74-84) colleges of proximity in the regions of Bouaké and San Pédro - Teacher Training of the Ecole Normale Supérieure - Construction of 3-4 technical and vocational training centers Beneficiaries Analysis of the investments of the Compact - Determination of the input data for the beneficiary analysis using the INS datasets and the World Bank WDI on Côte d’Ivoire economy. Show less

    • United Kingdom
    • Director of the Department of Studies and Prospective
      • Apr 2015 - Aug 2016

      Management of the Department of Studies and Prospective (DEP) - In charge of traffic and economic feasibility of infrastructure study projects; - Responsible for transport projects and logistics management - Management of cooperation projects with partners in Sub-Saharan Africa. Management of the Department of Studies and Prospective (DEP) - In charge of traffic and economic feasibility of infrastructure study projects; - Responsible for transport projects and logistics management - Management of cooperation projects with partners in Sub-Saharan Africa.

    • Consultant, Senior Transportation Expert
      • Jun 2015 - Mar 2016

      Studies Project for the asphalting of Tombel-Bangem-Melong & Bangem-Nguti roads - Head of the mission of supervision and monitoring of traffic counting and the Origin-Destination (OD) survey on the bridges on the Dja and Lobo rivers and determination of figures for the economical evaluation; - Collection of monographic data for the economic evaluation (Education, Health, Demography, Agriculture, etc.); - Drafting of the traffic study reports (summary and detailed study) of the project - Redaction of the economic assessment report. Studied project: 2 bridges to be built within the framework of the hydro-electric dam of Mekin. Show less

    • France
    • Services for the Elderly and Disabled
    • 1 - 100 Employee
    • Consultant, Senior Transportation Expert
      • Dec 2015 - Jan 2016

      Traffic Studies of the Bouaflé bridge post-construction - Head of the mission of supervision and coaching of traffic counting operations on the bridge; - Drafting of the traffic study report. Traffic Studies of the Bouaflé bridge post-construction - Head of the mission of supervision and coaching of traffic counting operations on the bridge; - Drafting of the traffic study report.

    • Consultant, Senior Transportation Expert
      • Feb 2015 - Oct 2015

      Road maintenance within the countries of the West African Economic and Monetary Union (WAEMU): Assessment of the 50 last years and Perspectives. - Member of the Circular mission Team for Niger, Mali, Senegal and Guinea Bissau - In charge of economic and financial aspects of the study - Member of the draftingteam of the preliminary, interim and final reports - Presentation of the economic and financial aspects of the study during the validation workshop Road maintenance within the countries of the West African Economic and Monetary Union (WAEMU): Assessment of the 50 last years and Perspectives. - Member of the Circular mission Team for Niger, Mali, Senegal and Guinea Bissau - In charge of economic and financial aspects of the study - Member of the draftingteam of the preliminary, interim and final reports - Presentation of the economic and financial aspects of the study during the validation workshop

    • China
    • Mechanical Or Industrial Engineering
    • Director of studies
      • Feb 2014 - May 2015

      Project of construction of the Abidjan Metro - In charge of all studies related to traffic, feasibility, urban transport multimodal transit and the supervision of all sub-contracted ones; - Contribution within the Abidjan Urban Train Project consortium to the following studies: the analysis of the Variants for Plateau (downtown), the insertion of stations, the pedestrian permeability, the multimodality (with existing modes), the capacity and reserve of capacity assessment, the airport service, the corridor sharing, etc. - Drafting of the MOU and the feasibility study framework document for the Urban Train project of Douala - Member of the meetings and negotiation staff for the different step of the project definition up to the Contract signature Show less

    • Consultant, Senior Transportation Expert
      • Mar 2014 - Dec 2014

      Project of construction of the bridges on the Lobo and Dja rivers - Head of the mission of supervision and monitoring of traffic counting and the Origin-Destination (OD) survey on the bridges on the Dja and Lobo rivers and determination of figures for the economical evaluation; - Collection of monographic data for the economic evaluation (Education, Health, Demography, Agriculture, etc.); - Drafting of the traffic study reports (summary and detailed study) of the project - Redaction of the economic assessment report. Studied project: 2 bridges to be built within the framework of the hydro-electric dam of Mekin. Show less

    • Côte d'Ivoire
    • Civil Engineering
    • 100 - 200 Employee
    • Senior Transportation Expert
      • Apr 2013 - Feb 2014

      - Appointed Manager for the Road sector cooperation program for the implementation of the MOU and Specific Agreement between: i. AGEROUTE and the Korea Expressway Corporation (KEC) ii. AGEROUTE and the Korean International Cooperation Agency (KOICA) - In charge of the validation of the road project feasibility studies - Drawing up of project sheets for future growth poles of Côte d'Ivoire and their access road network (English and French); - Preparation of Terms of Reference for future traffic and feasibility studies - In charge of economic evaluation of national roads project (Preparation of tendering documents, Disclosing of offers, validation of Consultants’ reports, follow up of projects, etc.) - Contribution within the technical committee to establish a traffic management plan around the projects in the area of the Boulevard Valery Giscard d'Estaing and the HKB bridge (Abidjan 3rd bridge) - Member of the national Committee for the Abidjan traffic plan - Member of the new national road development strategy Committee Show less

    • Consultant, Senior Transportation Expert
      • Jun 2012 - Dec 2012

      Technical studies for the asphalting of Ganlagachi Naki-East, Tandjouaré-Yembour, Dapaong-Warkambour, Kandé Nadoba-and-Niamtougou Tchikawa roads - Determination of indicators needed for the economic evaluation - Exploitation of the regional monographic data collected from the different State bodies (Education, Health, Demography, Agriculture, etc.) - Drafting of the traffic study reports (summary draft and detailed draft) of the project - Redaction of the economic assessment report. Show less

    • Consultant, Senior Transportation Expert
      • Apr 2012 - Aug 2012

      Technical studies for the rehabilitation of the Langabou-Yégué road - Head of the mission of supervision and monitoring of traffic counting and the Origin-Destination (OD) survey on the Langabou-Yégué road and determination of key figures for the economical evaluation; - Collection of monographic data which are necessary for the better economic evaluation (Education, Health, Demography, Agriculture, etc.); - Drafting of the traffic study reports (summary draft and detailed draft) of the project - Redaction of the economic evaluation report. Show less

    • France
    • Legal Services
    • Consultant, Expert Civil Engineer
      • Jan 2012 - Mar 2012

      Drafting of the ESIA bidding document of the Simandou mining project - Lead of the site visit mission of the Simandou mining project - Definition of ore transportation plan - Preparation of the call for tenders documents for the Study of Environmental and Social Impact Assessment (ESIA) and Management Plan and Social Environmental (ESMP) of the mining project of Simandou, Guinea. (Completely implemented in English). Drafting of the ESIA bidding document of the Simandou mining project - Lead of the site visit mission of the Simandou mining project - Definition of ore transportation plan - Preparation of the call for tenders documents for the Study of Environmental and Social Impact Assessment (ESIA) and Management Plan and Social Environmental (ESMP) of the mining project of Simandou, Guinea. (Completely implemented in English).

    • Côte d'Ivoire
    • Research
    • 400 - 500 Employee
    • Consultant, Senior Transportation Expert
      • Jan 2011 - Nov 2011

      Project for identification of transport issues on the Abidjan-Lagos Corridor (CAL) This study aimed to highlight the main obstacles to the transport smooth flow on the corridor (Abidjan – Accra – Lomé – Cotonou - Lagos). This was achieved through a survey along the corridor targeting both drivers, passengers and security forces. The roads and security conditions have also been taken into account within the study Project for identification of transport issues on the Abidjan-Lagos Corridor (CAL) This study aimed to highlight the main obstacles to the transport smooth flow on the corridor (Abidjan – Accra – Lomé – Cotonou - Lagos). This was achieved through a survey along the corridor targeting both drivers, passengers and security forces. The roads and security conditions have also been taken into account within the study

    • Consultant, Transportation Expert
      • Jun 2011 - Jul 2011

      Preparation and drafting of the call for tenders documents for the Study of awareness campaign for the realization of a project of a road refitting in 2x2 ways in one 2x3 ways on the section Tombo-Gbessia. The aim was to highlight the advantages of the project through transport. indicators Preparation and drafting of the call for tenders documents for the Study of awareness campaign for the realization of a project of a road refitting in 2x2 ways in one 2x3 ways on the section Tombo-Gbessia. The aim was to highlight the advantages of the project through transport. indicators

    • Project Manager & Legal Entity Appointed Representative of the UATP near the European Commission
      • Jul 2008 - Oct 2010

      Project for promoting public Transport in Sub-Saharan Africa (Trans-Africa) Responsible for the management of the project led by UITP & UATP and funded under FP7 by the EU Commission (Project fully implemented in English: Quarterly administrative reports, scientific content reports , financial reports and funding requests).Publications available on : http://www.uitp.org/content/trans-africa July-November 2010: Contribution within the Scientific committee of the technical preparation of the 1st African Transport Congress held in Dakar in October 2010. Design, development and translation of the special magazine of the known as congress January- July 2010: Definition of the potentials research directions to be addressed by the backers; November 2008 - January 2010: Studies for the detailed technical specifications of the African bus of the future and contribution to the measurement of performance indicators from the MCD (millennium City Database of the recent public transport policies in 8 Sub-Saharan Africa cities (Abidjan, Dakar, Lagos, Nairobi, Johannesburg, Addis-Ababa, Douala, Accra) June- November 2008: Survey and studies for the state-of-the-art of the institutional and operational framework of public transport in sub-Saharan Africa and definition the technical specifications of the African bus of the future. Show less

    • France
    • Facilities Services
    • Assistant of the project coordinator
      • Feb 2008 - Jun 2008

      Support for the preparation of the tender documents for the first section of the construction programme and validation of the technical and economic studies’ reports provided by the Contractors within the agreed framework of the construction schedule It was therefore to prepare road maintenance work programme for the resumption of funding by the World Bank. Support for the preparation of the tender documents for the first section of the construction programme and validation of the technical and economic studies’ reports provided by the Contractors within the agreed framework of the construction schedule It was therefore to prepare road maintenance work programme for the resumption of funding by the World Bank.

    • Business Consulting and Services
    • Transportation Expert
      • Dec 2007 - Mar 2008

      Economic feasibility Studies of the surrounding roads of Ouagadougou: - Head of the mission of supervision and framing of the operations of traffic counting and the Origin-Destination (OD) survey in Ouagadougou - Mission of restitution and preliminary validation of the data of OD survey and traffic counting - Contribution to the economic assessment of the project Economic feasibility Studies of the surrounding roads of Ouagadougou: - Head of the mission of supervision and framing of the operations of traffic counting and the Origin-Destination (OD) survey in Ouagadougou - Mission of restitution and preliminary validation of the data of OD survey and traffic counting - Contribution to the economic assessment of the project

    • Assistant of the project coordinator
      • Sep 2006 - Feb 2007

      Programme of Adjustment and Investment of the Transport Sector in Côte d’Ivoire - Evaluation of the of road maintenance projects the Government in Côte d’Ivoire from 1999 to 2006; - Development of the database of road maintenance carried out with Government funding; - Contribution to the drafting of the 2006 annual report of the CI-PAST project. Programme of Adjustment and Investment of the Transport Sector in Côte d’Ivoire - Evaluation of the of road maintenance projects the Government in Côte d’Ivoire from 1999 to 2006; - Development of the database of road maintenance carried out with Government funding; - Contribution to the drafting of the 2006 annual report of the CI-PAST project.

Education

  • Quantic School of Business and Technology
    Executive MBA, Business Administration and Management, General
    2022 - 2023
  • National College of Civil Engineering (Ecole Supérieure des Travaux Publics) / INP-HB Yamoussoukro
    Civil Engineer, Construction, Hydraulic, Infrastructure & Transports
    2003 - 2006
  • Ecole Préparatoire/INP-HB Yamoussoukro
    Mathématiques, Physiques et Sciences Industrielles, Admis aux concours des Ecole d'Ingénieurs
    2001 - 2003
  • Lycée Technique de Bouaké
    Baccalauréat E, Mathématiques et Techniques
    1998 - 2001

Community

You need to have a working account to view this content. Click here to join now