Diwakar Gangwar

Sr. Engineer (Operation) at Lanco Amarkantak Power Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • BOE
    Boiler Operation Engineer's Examination Board Chhattisgarh, Raipur
    Jun, 2015
    - Oct, 2024

Experience

    • India
    • Construction
    • 1 - 100 Employee
    • Sr. Engineer (Operation)
      • Jun 2012 - Present

      Position: Sr. Engineer (Operation) Duration: From June 2012 till date Plant Features: 2*300 MW BTG Supplied by DEC China Boiler: 1025 TPH subcritical, natural Circulation ,Drum type, single Reheat, Balanced Draught, Tangential firing with four corners arranged Boiler. Turbine: Subcritical, reheat, single shaft, Double Cylinder and HIP combined Cylinder & Condensing Steam Turbine. Job Profile: • Responsible for monitoring and handling emergencies of Boiler & Turbine for Smooth, safe and eco-friendly operation of 2x300MW Power plant. • Responsible for smooth & safe boiler light up, shutdown and turbine rolling. • Responsible for Cold / Hot start up activities. • Knowledge in LDC (Load demand control) mode of operation. • Operation of BOP Systems. • Prepare Standard Operating Procedures to enhance the reliability and safe operation of the plant. • Issue and cancellation of PTW (Permit to Work) system, safe isolation, personnel safety and equipment safety. • Guiding Field operators for safe operation of Power Plant. • Active participation and planning in unit shutdown jobs. Show less

    • Utilities
    • 700 & Above Employee
    • Engineer
      • Jun 2011 - May 2012

      Project: 2 x 116 MW Solar Thermal Power Project; Interfacing engineering and co-ordination with different project stake holders. Procurement services for plant & equipment including preparation of tender specification, evaluation of technical bids, post order discussion and preparation of technical contract document. Post bid engineering & engineering co-ordination with vendors. Progress review meeting with vendors to meet the stipulated project schedule. Close follow up with vendors & their sub-vendors to ensure deliverables / dispatches as per project schedule. Technical Assistance for project scheduling. Organize internal and external kickoff meetings. Coordination with commercial department regarding contract & processing of payment. PROJECT DURING ENGINEERING: Topic : Automatic Gate Activates involved: Conceptualization & complete working principle. Identification of required elements/equipments. Selection & procuring of each elements/equipments as per technical requirement. Preparation of complete model Preparation of detailed report Presentation on prepared model & detailed report Show less

Education

  • I.T.S. Engg. College Greater Noida, GB Nagar (UP)
    B.tech, Mechanical Engineering
    2008 - 2011
  • Govt. Poly. Bareilly, bareilly
    Engineering Diploma, Mechanical(Production)
    2005 - 2008
  • S.V.M. inter college, Pilibhit
    High School
    2000 - 2005
  • Board of High School and Intermediate Education
    Matriculation

Community

You need to have a working account to view this content. Click here to join now