Diwakar Bhatt

Student Placement Coordinator at Indian Institute of Management Mumbai
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mumbai, Maharashtra, India, IN
Languages
  • English Professional working proficiency
  • Hindi Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CATIA
    CADD Centre Training Services Pvt Ltd.
    May, 2013
    - Oct, 2024

Experience

    • India
    • Higher Education
    • 200 - 300 Employee
    • Student Placement Coordinator
      • Sep 2023 - Present

      Facilitating placement of PGDEx -VLFM'24 batch in coordination with placement Manager of IIM Mumbai Facilitating placement of PGDEx -VLFM'24 batch in coordination with placement Manager of IIM Mumbai

    • India
    • Textile Manufacturing
    • 700 & Above Employee
    • Functional Lead-Utilities(Project)
      • Feb 2022 - Jun 2023

      1) Applying design for excellence concepts in utility setup of 1.9 lakh spindle yarn project including modeling, prototyping, simulation, and calculation. 2) Involved in benchmarking technology, continuous improvement, and deploying cost-saving initiatives. 3) Ensuring the Bill of Material (BOM) for the project meets contractual obligations and project gross margin requirements by not generating Project Left-Over Material (PLOM). 4) Preparing RFQs to meet contractual requirements and providing a technical evaluation of suppliers’ proposals. Collaborating with the Supply Chain function and the Project Manager(s). 5) Proficiently handling the SAP S/4 HANA with expertise across modules. Show less

    • India
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Executive - Business Planning and Strategy
      • Jun 2019 - Feb 2022

      1) Sole Owner of optimized operation & maintenance of Compressors, DG Set, Particulate Matter (PM) System Viz. Preventive & Predictive maintenance and handled shift operations of utility areas (ETP, WWTP, ZLD, etc.) 2) Successfully reduced 3% daily water consumption (19.5 KLD) by optimization and utilization of advanced technology 3) Achieved 5% savings in energy used in compressor by optimizing compressor operation & installation of motorized control valve at Shop inlet 1) Sole Owner of optimized operation & maintenance of Compressors, DG Set, Particulate Matter (PM) System Viz. Preventive & Predictive maintenance and handled shift operations of utility areas (ETP, WWTP, ZLD, etc.) 2) Successfully reduced 3% daily water consumption (19.5 KLD) by optimization and utilization of advanced technology 3) Achieved 5% savings in energy used in compressor by optimizing compressor operation & installation of motorized control valve at Shop inlet

    • India
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Process Improvement Engineer
      • Jun 2018 - Feb 2019

      • Audit the different plants in my assigned zone to suggest and implement process improvement solutions • Identify new sales opportunities and influence the client for purchasing the complete product portfolio • Increase the business among new customers in a grid with a potential of 5 crores • Proactively identify potential equipment failures and suggest corrective actions. Troubleshoot complex equipment failure and make recommendations to avoid repeating the problem in the future • Coordinate with service engineers and planning team for timely delivery of products to the customers Show less

    • India
    • Food and Beverage Services
    • 700 & Above Employee
    • Assistant Maintenance Manager
      • Mar 2018 - May 2018

      • Involved in all activities related to commissioning of boiler in the plant• Implemented Process Optimisation methods in the Pasteuriser.

    • Assistant Maintenance Manager
      • Aug 2017 - Mar 2018

      • Maintained the Condensate recovery at optimum level in the plant and took necessary measures to reduce the steam consumption• Ensured efficient operation of compressors and implemented preventive maintenance schedule for minimum breakdown and trouble free operation • Monitored the efficiency of various machines, updating history cards and implementing necessary action plans for ensuring the same

    • Graduate Engineer Trainee
      • Jul 2016 - Jul 2017

      • Analyzed the reasons for major breakdown in Domino Coding machine and implemented preventive maintenance schedule • Process owner for installation of Uncaser Machine and ensured timely production of different SKUs in full depth crate with minimal breakdown• Monitored the utility requirement in plant and suggested possible improvements to reduce power consumption and improve operational practices.• Successfully completed a project on improving condensate recovery in plant by PID study , modification in line of SOPT and implementation of preventive maintenance schedule for PPPPU Pump.• Successfully procured the machine parts at competitive prices by skillful negotiation with the vendor Show less

    • India
    • Higher Education
    • 700 & Above Employee
    • Student Training & Placement Representative- Training and Placement Cell
      • May 2015 - May 2016

      Placement Coordinator for Placement Team '16 (16 coordinators for a Batch of 900 students) -Active involvement in building corporate relations for facilitating recruitment process in the campus Placement Coordinator for Placement Team '16 (16 coordinators for a Batch of 900 students) -Active involvement in building corporate relations for facilitating recruitment process in the campus

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Member
      • Jul 2013 - May 2016

      The SAE COLLEGIATE CLUB OF MNNIT is the most active club of college where Automobile enthusiasts experiment with energy efficient designs of cars to come up with their own model and contribute to the society. SUPRA SAE INDIA 2014 -Worked on wheel assembly for the student formula car. Designed an energy absorbing equipment i.e. an impact attenuator for the car using aluminium sheets and foam. SUPRA SAE INDIA 2015 -Designed and manufactured uprights using alumininum with an aim to reduce weight of knuckle which led to increased efficiency with decrease in car weight -Designed an aluminium honeycomb 3-layered structure of Impact attenuator for the formula car Show less

    • India
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Summer Internship
      • May 2015 - Jun 2015

      - Worked on Optimization of the HVAC System in powertrain shop to reduce the overall fixed cost of the plant - Study and Optimization of hot water Generator system in Propane yard - Learnt about the processing of plant and assembly process of various vehicles - Worked on Optimization of the HVAC System in powertrain shop to reduce the overall fixed cost of the plant - Study and Optimization of hot water Generator system in Propane yard - Learnt about the processing of plant and assembly process of various vehicles

Education

  • National Institute of Industrial Engineering
    PGDEx-VLFM, Operations & Supply Chain Management
    2023 - 2024
  • Motilal Nehru National Institute Of Technology
    Engineer’s Degree, Production and Industrial Engineering
    2012 - 2016
  • Beersheba Senior Secondary School Haldwani , Nainital
    High School
    1996 - 2011

Community

You need to have a working account to view this content. Click here to join now