Dina Dayalan

Tunnel Engineer at Chennai Metro Rail Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Vijay Shankar Jeyakrishnan

Dina is one of the few passionate underground professionals I have known since 2012. His vast knowledge and experience from Contractor to Consultant to Owner is valuable to any team. He is technically sound with the TBM and mining operation and he has been one of my to-go people with any field-related questions and is always open to helping and sharing the lessons learned from his past experiences. I have known Dina since 2008 and his attention to detail and quick learning skills still amazes me and I strongly believe he would be a great asset to any company.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Truck Transportation
    • 200 - 300 Employee
    • Tunnel Engineer
      • Feb 2018 - Present

    • United States
    • Construction
    • 700 & Above Employee
    • ENGINEER II
      • Oct 2016 - Feb 2018

    • Spain
    • Environmental Services
    • 700 & Above Employee
    • TBM ENGINEER
      • Apr 2015 - Aug 2016

      • Construction of Tunnel of about 5 km with 9.8m diameter TBM. • Participated in assembling the TBM S-896 (Herren knecht) it includes assembling cutter head, main drive, Front shield, Middle shield, Tail skin, screw conveyor and all back-up gantries. • Commissioned the TBM coordinating with the manufacturer after completing the assembly. • Understanding the problem through the circuit diagrams and makes it rectify. • Preparing the full reports of Tunneling process like TBM Operations Sheet, Shift reports, Ring building protocol, Consumption control file. • Control of HK spare parts and cutter head tools for TBM. • Controlling mucks which excavated from TBM for every shift and making reports.

    • Russian Federation
    • Construction
    • 1 - 100 Employee
    • Shift Engineer
      • Apr 2014 - Mar 2015

      TUNNEL AND CROSS PASSAGE WORKS • Construction of Twin Tunnel using Earth Pressure Balance TBM of about 6.68m diameter. • Preparing the full reports of Tunneling process like TBM Operations Sheet, shift reports, Ring building Protocol, Time Sheet, selection of Key positions. • Construction of cross passage between the tunnels. Successfully completed four cross passage. • Cross passage grouting- Jet grouting & permeation grouting. • Investigation of soil, traffic diversion, High pressure jet grouting on the Surface for cross passage. • Installation of waterline, hyperbaric line for TBM. • Working primary grouting, secondary grouting for segments. Experience in hyperbaric intervention

    • Site Engineer
      • Aug 2012 - Apr 2014

      Geo technical works • To carry out following type of grouting works :(for Underground station & tunnel) a) Pressure grouting -TAM Grouting & jet Grouting b) Plunge column Toe grouting c) Shear pin grouting in D’wall d) Chemical grouting - PU (Poly Urethane) e) Conducting Shotcreting/ Guniting works for Underground Stations and Tunnels, soil investigation work at site, DCPT tests using geotool and finally interpreting the data f) Conducting bore-well survey along the tunnel alignment and giving proposals for their alternate locations if any hindrance. g) Conducting Building Condition survey along the tunnel alignment and Prepare Building Reports and submission of same to the client.

Education

  • Annamalai University
    Diploma of Education, Construction Management
    2019 - 2020
  • Velammal engineering college
    Engineer’s Degree, Civil Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now