Dimitris Tsinas
Responsable Topographie - L16 Lot02 - TBM7, Grand Paris Express at Webuild- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Business Analysis Foundations: Business Process Modeling
LinkedInFeb, 2023- Nov, 2024 -
Leading with Vision
LinkedInFeb, 2023- Nov, 2024 -
Ultimate Microsoft Project 2016 Course - Beginner to Expert
Simon Sez ITJul, 2021- Nov, 2024 -
Advanced Trimble Accubid Classic Pro
LinkedInSep, 2019- Nov, 2024 -
Microsoft Planner Essential Training
LinkedInSep, 2019- Nov, 2024 -
Project Management Professional (PMP)
Project Management InstituteJun, 2020- Nov, 2024
Experience
-
Webuild
-
Italy
-
Construction
-
700 & Above Employee
-
Responsable Topographie - L16 Lot02 - TBM7, Grand Paris Express
-
Oct 2020 - Present
-
-
Responsable Topographie - L14 SUD - Lot04, Grand Paris Express
-
May 2019 - Sep 2020
-
-
-
AKTOR SA
-
Greece
-
Construction
-
700 & Above Employee
-
Chief TBM Surveyor - Thessaloniki Metro Project
-
Mar 2016 - Feb 2019
Responsibility for the navigation of 2 Tunnel Boring Machines for the excavation of the remaining 2 Tunnels of 4000m total length for the Base Line and 2 tunnels of 8800m total length for the Extension Line.
-
-
Chief Engineering Surveyor, Main Contractor
-
Feb 2012 - Feb 2016
Technical Supervision in Surveying Engineering for a Large Mining Project including the construction of Access and Hydraulic bypass Tunnels, Open Pit Mining, Tailings Dams, as well as, their auxiliary Surface Earthworks, Access Roads and Drainage Structures.
-
-
-
Maliakos Kleidi Construction Joint Venture (Hochtief – Vinci – Aktor – J&P)
-
2nd Km Itea Gonnoi, 40004, Larissa, Greece
-
Surveying Engineer, Surveying Department of the JV Design Centre
-
Sep 2007 - Oct 2011
Surveying Engineering in the design level for the needs of a 30km highway construction project included 3 highway tunnels construction of 22km total length (NATM - twin bore), bridges, culverts, junctions and intersections. Surveying Engineering in the design level for the needs of a 30km highway construction project included 3 highway tunnels construction of 22km total length (NATM - twin bore), bridges, culverts, junctions and intersections.
-
-
-
-
Surveying Engineer, Cadastral Design Department
-
May 2007 - Aug 2007
Land Surveying, Cadastral Design Land Surveying, Cadastral Design
-
-
Education
-
Heriot-Watt University
MSc in Construction Project Management -
National Technical University of Athens
MSc, Geoinformatics, 2 Year Postgraduate Course -
National Technical University of Athens
MEng Rural & Surveying Engineering, 5 Year Course, MSc -
Palamas Secondary - High School
Certificate