Dilshan Hameed
Estimation Manager at Al-Dousari Group Gen. Trad. & Cont. Co.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Hindi -
-
Arabic -
Topline Score
Bio
Experience
-
Al-Dousari Group Gen. Trad. & Cont. Co.
-
Kuwait
-
Construction
-
1 - 100 Employee
-
Estimation Manager
-
Apr 2021 - Present
-
-
Chief Estimator
-
Aug 2018 - Apr 2021
-
-
-
Cladtech International
-
United Arab Emirates
-
Construction
-
200 - 300 Employee
-
Senior Estimator
-
Jul 2017 - Jul 2018
-
-
-
Multiforms LLC
-
United States
-
Design Services
-
1 - 100 Employee
-
Facade Estimator
-
Jun 2016 - Jul 2017
-
-
-
Wall Technology LLC - Facade Egineering
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Estimation Engineer
-
Feb 2014 - Jun 2016
o Expertise in handling Cost Analysis of Aluminum& Glazing Portion of Projects. o Expertise in Estimating and Quantity takeoff. o Good understanding of Contract Plans and Specifications. o Working knowledge in using Logikal Orgadata, AutoCAD, Microsoft Office. o Ability to handle commercial procedures. o Familiar Aluminium Systems- Gutmann, Schuco, Profils, Hueck, Alu K, Installux, Raynears, Technal, Gulf Extrusions, Alupco & Balexco. o Knowledge of FIDIC rules and regulations. Show less
-
-
-
Ashbee Metal Cladding W.L.L.
-
Building Materials
-
1 - 100 Employee
-
Estimation Engineer
-
Jul 2012 - Feb 2014
o Responsible for material take off for ongoing/tender projects aluminium works extending from curtain walls, doors, windows, frameless gazing and cladding to high-rise buildings and various other complicated façades solutions. o Study the Project Scope of Works, Client’s Requirement, BOQ, Project Milestones and Specification from the given Documents. o Highlighting Discrepancies with respect to Specification, Tender Drawings and BOQ o Estimation of Stick and Unitized curtain walls, doors, windows, spider glazing, steel structure, canopies, pergolas, skylights, balustrades, ACP cladding panels,. o Preparing BOQ and contracts, detailed quantity take-offs, progress payments, variation order, claims for extension of time & compensation for submission to general contractor and consultants. o Attending clarification meetings with consultants and contractors to discuss financial and technical matters to finalize quotations. o Floating of Enquires to vendors/suppliers with Specifications, Schedule, Drawings and BOQ o Review design drawings with the requirements and identify any difference to tender requirements and Raise the Queries against specification. o Prepare Estimation of the Project using Self Developed Cost Estimation Sheets. o Evaluate the Quotations/Offer from the vendors/suppliers against Tender Specifications or Requirements and Prepare Comparison Statement. o Prepare the Indirect Cost of the project like Supervisory Manpower, Temporary Facilities, Site Overheads and Running Expenses. o Comparison of IFC drawings with Tender drawings and preparation of variations. o Comparison of site dimension drawings with submitted offer and advising Project Managers with any possible variation claims. o Assisting in project planning, manpower, equipment scheduling and other contractual issues. o Suggested proposals to design team to make shop drawings. Show less
-
-
-
The Linde Group
-
United States
-
Staffing and Recruiting
-
1 - 100 Employee
-
Mechanical Engineer
-
Jun 2010 - Apr 2012
Preparation and Implementation of approved Quality plan / ITP as per client/ consultant procedures. o Interpretation of P & I Diagrams, Piping Isometrics and Pipe Support Specifications based on pre-designed Piping Line Classes. o Generate Piping Drawings and Isometrics for construction, fabrication and erection. o Solve construction problems and difficulties arising due to discrepancies in design or material incompatibility. o Conducted erection and alignment of rotary equipments like motor driven Air compressors, steam driven air compressor, HP Air Compressor etc as well as static equipments like 110T HP Air Receiver, Direct Cooler Vessel, Cold Box etc. o Interpretation of drawings and guiding the contractors to execute the work. o Conducted Hydro test of pipelines up to a Pressure of 14kg/cm2 and pneumatic test up to a pressure of 11.5 kg/cm2. o Conducted Pre-commissioning of motor driven Air Compressors (GB-38301(A, B, C)) of capacity 7800NM3/hr and design pressure 10.5kg/cm2. o Manage various key of overall Piping Fabrication, Erection, Welding Inspection, Equipment erections and alignment, Quality procedures and various site management functions. o Familiar with application of International Standards for process piping like, ANSI/ASME B31.3, and ASTM specifications, with basic knowledge of ASME B16.5,ASME B16.9,ASME B16.11 etc. Show less
-
-
Education
-
Government Engineering College, Kozhikkode
Bachelor of Technology (B.Tech.), Mechanical Engineering