Dick Mariano

Tunnel foreman, AMV Jumbo optr. / Trainor at Silangan Mindanao Mining Co. Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Philippines, PH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Tunnel foreman, AMV Jumbo optr. / Trainor
      • 2014 - Present

      Assigned to the Drilling and Concreting/Grouting section, Decline dept. Train locals in the safe operations of the AMV rod handling Jumbo and the AMV grouting pump. We drill blastholes for production purposes but mainly focused on drilling Longholes for Grouting purposes. Holes are drilled 24 - 40 meter by 21 holes and then packers are installed. Grouting hoses are connected to the packers and then grout is pumped and injected into the drilled holes. Main purpose is to stabilise the loose ground and fractured rocks and also seal the water sippages. A couple of hours of curing and blasting activity can be done. Wash the grouting pump, mixers, agitators and hoses after activity . Show less

    • Hong Kong
    • Construction
    • 700 & Above Employee
    • Jumbo Operator / Dumptruck driver / H.E operator
      • 2012 - 2013

      Assigned to operate the Robodrill jumbo machine and drive the caterpillar dumptruck 725 at 904 project south horizons. hongkong. Relieve other operators in other equipments like excavators and loaders. We drill blastholes, boltholes for production purposes. Assist shotfirers and miners during charging and blasting activity. Completed and finished the drill and blast project. Assigned to operate the Robodrill jumbo machine and drive the caterpillar dumptruck 725 at 904 project south horizons. hongkong. Relieve other operators in other equipments like excavators and loaders. We drill blastholes, boltholes for production purposes. Assist shotfirers and miners during charging and blasting activity. Completed and finished the drill and blast project.

  • GAMMON CONSTRUCTION LTD/ NISHIMATZU COMPANY
    • WANCHAI / KENNEDY TOWN HONGKONG
    • JUMBO /H.E OPERATOR,
      • Jun 2011 - 2012

      Assisted the shaft sinkers in the drilling and blasting activity until finished. Operated the robodrill machine at wanchai site. We drilled blastholes and boltholes and charge and blast after drilling. Drilled boltholes and installed rockbolts to support the tunnel roofs and walls. Shotcrete is applied to strengthen and support loose rocks from falling. At the kennedy town site, we used Atlas copco and sandvik Jumbos fro drilling. Swellex bolts are used as rockbolts and the system of blasting is NONEL TYPE OF BLASTING. Show less

  • BOMBELA / CIVILS/ JOINT VENTURE
    • JOHANNESBURG, SOUTH AFRICA
    • DRILLER OPERATOR/ MINER
      • 2009 - 2011

      Assigned to the drill and blast section , Subway dept. Trained locals in the operations of the Robodrill Jumbo machine. Daily routine in drilling , blasting, bolting, mucking and shotcreting. Finished and completed the work from Sandton site to Park station site. Assigned to the drill and blast section , Subway dept. Trained locals in the operations of the Robodrill Jumbo machine. Daily routine in drilling , blasting, bolting, mucking and shotcreting. Finished and completed the work from Sandton site to Park station site.

    • TUNNEL FOREMAN, JUMBO OPERATOR
      • 2008 - 2009

      Assigned to drive 3 diversion tunnels 1,5 kilometers each tunnel by drilling and blasting method. The tunnels are used to divert water from the omo river to the diversion tunnels fro hydro purposes. Rockbolts and shotcrete are applied to support the tunnels and concrete lining to finish the tunnels. The floor is cleaned and concreted and the rails are installed to set up the mechanical forms. Reinforcing bars are installed around the mechanical form to support the concrete. grouting pipes are connected to the form for pouring concrete/ the mechanical form is then shuttered and is ready for pouring concrete. Completed and finished contract work. Show less

  • NISHIMATZU COMPANY LTD.
    • GNOMALATH, REPUBLIC OF LAOS
    • TUNNEL / CIVIL FOREMAN
      • 2006 - 2007

      Assigned at the mahassay site drill and blast tunnel.Trained locals in tunnelworks, like drilling, blasting, mucking activity and operations of equipments, shotcreting and rock support. Coordinate with supervisors regarding work schedules, drill plans and patterns and equipment mobilization. Enforce safety measures in and outside of tunnel site. Work alongside operators and miners in executing work schedules and turn over shift to encoming shift for proper organization of work in the tunnels. Assigned at the mahassay site drill and blast tunnel.Trained locals in tunnelworks, like drilling, blasting, mucking activity and operations of equipments, shotcreting and rock support. Coordinate with supervisors regarding work schedules, drill plans and patterns and equipment mobilization. Enforce safety measures in and outside of tunnel site. Work alongside operators and miners in executing work schedules and turn over shift to encoming shift for proper organization of work in the tunnels.

  • VELASCO CONSTRUCTION
    • BENGUET, PHILIPPINES
    • DRILLER, HEAVY EQUIPMENT OPERATOR
      • 2002 - 2005

      ROADWORKS, WIDENING. ROAD SLOPING, RIPRAPS,ROAD CONCRETING,. ASSIGNED TO OPERATE EXCAVATORS, LOADERS AND DUMPTRUCKS. ROADWORKS, WIDENING. ROAD SLOPING, RIPRAPS,ROAD CONCRETING,. ASSIGNED TO OPERATE EXCAVATORS, LOADERS AND DUMPTRUCKS.

  • CASECNAN MULTIPURPOSE PROJECT.
    • PANTABANGAN, NUEVA ECIJA, PHILIPPINES
    • TUNNEL FOREMAN
      • 1997 - 2001

      Assigned at the ADITS 2 & 3 Drill and blast tunnels..Receive work schedules from supervisors and coordinate with operators and miners in the implementation of each work activity,.Mobilise equipments to designated areas of activity and monitor each activity if the designs and plans are implemented. Implement safety precautions in work areas and coordinate with supervisors or people concerned if there are defects in equipments and problems in work places so as not to delay the work. Requests for materials like explosives, equipments, hardware or any material that is essential to each activity. Turn over the work activities and equipments status to the incoming shift. Completed and finished the project. Show less

    • SHAFTSINKER / DRILLER
      • 1996 - 1997

      Excavated a twin Horizontal shaft 12 mtrs. width by 190 meters deep at the Kwontung site. We used sinker machines to drill the holes and used nonels in blasting.Grouted bolts and shotcrete are applied to support the shaft walls. A movable gantry crane is used to haul the blasted materials at the bottom to the top by pulling down and up the skip that is being loaded by the excavator down the shaft floor. Its a daily routine of drilling and blasting work, heavy mucking, rock support and shotcrete. Excavated a twin Horizontal shaft 12 mtrs. width by 190 meters deep at the Kwontung site. We used sinker machines to drill the holes and used nonels in blasting.Grouted bolts and shotcrete are applied to support the shaft walls. A movable gantry crane is used to haul the blasted materials at the bottom to the top by pulling down and up the skip that is being loaded by the excavator down the shaft floor. Its a daily routine of drilling and blasting work, heavy mucking, rock support and shotcrete.

  • ABV ROCK GROUP KB
    • JEDDAH, SAUDI ARABIA
    • DRILLER / BLASTER
      • 1991 - 1994

      DAILY ROUTINE IN DRILLING, BLASTING, MUCKING, ROCK SUPPORT AND SHOTCRETING AND CONCRETING WORK. DAILY ROUTINE IN DRILLING, BLASTING, MUCKING, ROCK SUPPORT AND SHOTCRETING AND CONCRETING WORK.

    • MINER/ CAPATAZ
      • 1984 - 1991

      Assigned in production stopes and development drives. Activities include drilling, blasting, slushing ore, timbering, tramming and mucking. Assigned in production stopes and development drives. Activities include drilling, blasting, slushing ore, timbering, tramming and mucking.

Education

  • Quezon Memorial Colleges / Baguio Colleges Foundation
    Bachelor of science in commerce, accounting

Community

You need to have a working account to view this content. Click here to join now