Dian Sobari samdani

RF Engineer at PT.GCI Indonesia (JIESAI)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Suryo Pranoto

Dian Samdani is a professional with high level technical and analytical skills for transmission planning

Rahmad Widyanto

Mr.Dian Sobari samdani is some body with very strong knowledge & experience as TNP Engineer, as I know he come to the RNO Engineer with good experience also, The man with good attitude and personality on him also support in handling task/duty in which showing satisfied outcome. Spirit for learning and improving himself is another kind to boost his carreer in the future Very recomended and interest to join with him again on another project and tobe successfully together.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Telecommunications
    • 300 - 400 Employee
    • RF Engineer
      • Sep 2013 - Present

      PLO 3G Engineer • Performs consistency parameter/adjacency checks • Network cell parameter & main route optimization task, statistics performance monitoring & analysis for Telkomsel • Verification and analyse for drive test result with Actix analyzer • Solution to all of the problems found during drive test to Telkomsel. Modify the antenna parameter (tilt, orientation, height, position, type) PLO 3G Engineer • Performs consistency parameter/adjacency checks • Network cell parameter & main route optimization task, statistics performance monitoring & analysis for Telkomsel • Verification and analyse for drive test result with Actix analyzer • Solution to all of the problems found during drive test to Telkomsel. Modify the antenna parameter (tilt, orientation, height, position, type)

    • Indonesia
    • Telecommunications
    • 1 - 100 Employee
    • RNP & TNP Engineer Coordinator
      • Nov 2012 - Sep 2013

      RNP & TNP Engineer Coordinator • Supervise transmission site survey for path profiling using Pathloss for Change-out and new sites. • Coordinates verification for the site location • Check line of site verification between candidate sites and possible link ups (3 options per candidate) • Propose antenna centerlines and azimuth, antenna placement of proposed link up • Photos of proposed location of indoor equipment and new MW antenna at existing link up site PLO 3G Engineer • Performs consistency parameter/adjacency checks • Network cell parameter & main route optimization task, statistics performance monitoring & analysis for Telkomsel • Verification and analyse for drive test result with Actix analyzer • Solution to all of the problems found during drive test to Telkomsel. Modify the antenna parameter (tilt, orientation, height, position, type) Show less

    • Malaysia
    • Telecommunications
    • 200 - 300 Employee
    • Transmission Planner
      • Jan 2009 - Oct 2012

      Project: Axis – West Java (HUAWEI) Telkomsel – Balinusa (NSN) Indosat – Central Kalimantan (NSN) HCPT – Jakarta (NSN)• Supervise transmission site survey for path profiling using Pathloss for Change-out and new sites.• Recommended and designed transmission re-routes for sites without Line-of-sight (LOS) ensuring E1 Capacity, Path Quality and within the project phase limitations.• Evaluated/analyzed Candidate Information Reports and Technical Site Surveys (TSS) Reports.• Proposed link up, Link Budget and Path Profile using Pathloss 4.0• Coordinates verification for the site location• Check line of site verification between candidate sites and possible link ups(3 options per candidate)• Propose antenna centerlines and azimuth, antenna placement of proposed link up• Identify the required installation materials for both new and link up sites ( BOQ)• Conducted SDH/PDH Line-of-Sight (LOS) and RF Surveys/Site Hunting on field working closely with Civil Works Supervisor and Site Acquisition Personnel.• Route Capacity Planning and Re-Route, Port Assignments and Cross Connections• Network Plan, Frequency Plan including Hi-Lo Plan, Channel Assignment• Performs MW RFI Scanning in 360 degrees (30 deg increment) Vertical and Horizontal (LNA must be used) on new and link up sites • Abis Maping, ETC-16, TCSM maping, Tellab and HiD Data fill and Port Alocation• GB maping and rebalancing• Support for Create PES and BSC Data Field• Troubleshooting and Maintenance, Analysis for optimizer due to Transmission• IDU Layout Design for RTN980 and RTN950• Etehrnet ETH SERVICE PLAN• Configuring required IP Addresses and Routing• Coordinates with customer and other discipline regarding changes of link up subject for approval.Support PLO 2G Nokia• Consistency check parameter(2G) based on NPT.• Create and Check Adjacency Show less

    • TSS COORDINATOR
      • Sep 2008 - Jan 2009

      Project : ● Telkom CDMA 2008 Expansion Line of Sight (LoS)Survey 1 & 2 ● Telkom CDMA 2008 Expansion Radio Frequensi (RF)Survey 1 & 2Assigned : • Prepares TSS schedule• Coordinates verification for the site location• Check line of site verification between candidate sites and possible link ups (3 options per candidate)• Propose antenna centerlines and azimuth, antenna placement of proposed link up• LOS photos to and from the proposed link up • Photos of proposed location of indoor equipment and new MW antenna at existing link up site • Identify the required installation materials for both new and link up sites ( BOQ)• Performs MW RFI Scanning in 360 degrees (30 deg increment) using 8GHz and 15GHz Vertical and Horizontal (LNA must be used) on new and link up sites • Prepared Path Profile and Path Calculation reports for submission of ATP.• Conducted SDH/PDH Line-of-Sight (LOS) and RF Surveys/Site Hunting on field working closely with Civil Works Supervisor and Site Acquisition Personnel.• Evaluated/analyzed Candidate Information Reports and Technical Site Surveys (TSS) Reports.• Supervise transmission site survey for path profiling using Pathloss for Change-out and new sites.• Recommended and designed transmission re-routes for sites without Line-of-sight (LOS) ensuring E1 Capacity, Path Quality and within the project phase limitations. Show less

    • Technical Site Survey
      • Jan 2007 - Sep 2008

      Project : ● Nokia – Telkomsel 3G BB, Site Survey Transmition LoS ● Nokia – Telkomsel 2G+SIS , Site Survey Transmition LoS ● NEC Site Survey Transmition LoS ● Telkom CDMA 2008 Expansion LoS & RF Survey ● M-8 Site Cheking Swap Upgrade ● Nokia – Telkomsel 3G BB, Site Survey Transmition LOS ● Nokia – Telkomsel 2G+SIS , Site Survey Transmition LOS Assigned: • Coordinates verification for the site location • Check line of site verification between candidate sites and possible link ups (3 options per candidate) • Propose antenna centerlines and azimuth, antenna placement of proposed link up • LOS photos to and from the proposed link up • Photos of proposed location of indoor equipment and new MW antenna at existing link up site • Performs MW RFI Scanning in 360 degrees (30 deg increment) using 8GHz and 15GHz Vertical and Horizontal (LNA must be used) on new and link up sites • Conducted SDH/PDH Line-of-Sight (LOS) and RF Surveys/Site Hunting on field working closely with Civil Works Supervisor and Site Acquisition Personnel. • Evaluated/analyzed Candidate Information Reports and Technical Site Surveys (TSS) Reports Show less

Education

  • STMIK-PMBI Bandung
    S1, T-Informatika
    1997 - 2003

Community

You need to have a working account to view this content. Click here to join now