Diab Sharaf

GISLV&Converter O&M Technical Manager gor Lightning Project at EDF Renewables Middle East
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • GISLV&Converter O&M Technical Manager gor Lightning Project
      • Sep 2023 - Present

      UAE

    • France
    • Transportation, Logistics, Supply Chain and Storage
    • 1 - 100 Employee
    • Electrical Facilities and activation Section Manager
      • Mar 2017 - Sep 2023

      Abu Dhabi, United Arab Emirates 1- Abu Dhabi Transmission & Dispatch Company (Transco) (March 2007 – Till now) • Position: Electrical Facilities & Activation Manager • Location: Al-Ain Area United Arab Emirates • Duties: The duties include but not limited for the following: a) Calculating the annual budget of Al Ain area (18 Sub-Stations and 4 SVC's) maintenance cost including the material required for the transformers, switchgear, protection system, HVAC system, firefighting system and stations auxiliary… Show more 1- Abu Dhabi Transmission & Dispatch Company (Transco) (March 2007 – Till now) • Position: Electrical Facilities & Activation Manager • Location: Al-Ain Area United Arab Emirates • Duties: The duties include but not limited for the following: a) Calculating the annual budget of Al Ain area (18 Sub-Stations and 4 SVC's) maintenance cost including the material required for the transformers, switchgear, protection system, HVAC system, firefighting system and stations auxiliary systems. b) Planning of the annual preventive maintenance job plan procedures of all equipment and estimation of the expected planed corrective maintenance budget. c) Preparing the contract request tenders for the project contracts for some services whenever needed d) Following up the maintenance programs implementation e) Analysis of the faults happened in the equipment and network and putting the corrective actions required and the modifications if it is needed to avoid repeating of similar faults. Show less

    • Electrical & Protection Maintenance Manager
      • Aug 2001 - Jun 2007

      Cairo, Egypt Site: El-Kuriemat Power station(2 steam GEN. Steam turbines each 650 MW) which also includes the following: -2 generator transformers single phase three bank transformers 725MVA, 23/500KV -4 power transformers 32MVA, 220/6.3KV auxiliary and start up transformers -500/220 KV GIS substation and includes 24 bays -Four transformers 500MVA, 500/220KV -2 6.3 KV ABB switchgear which serving the two generating units -All other auxiliary systems like LV… Show more Site: El-Kuriemat Power station(2 steam GEN. Steam turbines each 650 MW) which also includes the following: -2 generator transformers single phase three bank transformers 725MVA, 23/500KV -4 power transformers 32MVA, 220/6.3KV auxiliary and start up transformers -500/220 KV GIS substation and includes 24 bays -Four transformers 500MVA, 500/220KV -2 6.3 KV ABB switchgear which serving the two generating units -All other auxiliary systems like LV MCC’s and load centers, cathodic protection Show less

    • HIGH SCALING INSTRUCTOR OVER SEAS
      • Jul 1996 - Feb 2007

      Kuwait , UAE , OMAN , Bahrain , Saudi Arabia , ....etec Preparing and teaching different training courses (Maintenance of power transformers, SCADA system design and testing, Maintenance of distribution systems, Maintenance of SF6 circuit breakers 66&220 KV, Maintenance of 6.3KV, low voltage motors schematic drawings and control circuits (schematic drawings) of EHV sub stations and electrical safety training course) for one weak and two weeks in many countries and different companies such as SAUDI ARABIA, Sultanate of Oman, Syria, UAE, KWAIT and… Show more Preparing and teaching different training courses (Maintenance of power transformers, SCADA system design and testing, Maintenance of distribution systems, Maintenance of SF6 circuit breakers 66&220 KV, Maintenance of 6.3KV, low voltage motors schematic drawings and control circuits (schematic drawings) of EHV sub stations and electrical safety training course) for one weak and two weeks in many countries and different companies such as SAUDI ARABIA, Sultanate of Oman, Syria, UAE, KWAIT and Uganda) Show less

    • Belgium
    • Recreational Facilities
    • Electrical&Protection Manager
      • Nov 2000 - Jan 2007

      Site: El-Kuriemat Power station (2 steam GEN. Steam turbines each 650 MW) which also includes the following: - 2 generator transformers single phase three bank transformers 725MVA, 23/500KV - 4 power transformers 32MVA, 220/6.3KV auxiliary and start up transformers - 500/220 KV GIS substation and includes 24 bays - Four transformers 500MVA, 500/220KV - 2 6.3 KV ABB switch gear which serving the two generating units - All other auxiliary systems like LV MCC’s and load centers, cathodic… Show more Site: El-Kuriemat Power station (2 steam GEN. Steam turbines each 650 MW) which also includes the following: - 2 generator transformers single phase three bank transformers 725MVA, 23/500KV - 4 power transformers 32MVA, 220/6.3KV auxiliary and start up transformers - 500/220 KV GIS substation and includes 24 bays - Four transformers 500MVA, 500/220KV - 2 6.3 KV ABB switch gear which serving the two generating units - All other auxiliary systems like LV MCC’s and load centers, cathodic protection system, heat tracing system, all 6.3 KV pumps motors and all 415V LV pumps. · Duties: From the above-mentioned starting work period of the company (handed over from the Egyptian government operation & maintenance responsibility) I have made the following: a- Planning & scheduling the preventive maintenance which was derived by EMPAC system software for all equipment including the following: b- Monitoring and controlling the implementation of the planned preventive maintenance as the EMPAC system software was used to for the maintenance activities and also for the warehouse spare parts control for the forecasting procurement. c- Reporting directly to the plant manager for the monthly performance achieved and the proposed attenuation inside the pre-planned budget. Show less

    • 1 - 100 Employee
    • Electrical Design and commissioning Manager
      • Dec 1999 - Aug 2001

      Cairo, Egypt Site: Great Cairo zone electrical regional control center for all 66/11KV sub stations (135 SS) Project: SCADA system for great Cairo great zone of 135 Sub-Stations 66/11 KV to receive all sub stations equipment feedback status, all protection alarms, MW and MVAR load of all feeders and transformers, kV of 66 and 11 kV bus bars and also to make supervisory control for 66 and 11 kV circuit (making close and open from the center) · Duties: a- Planning, complete supervision on… Show more Site: Great Cairo zone electrical regional control center for all 66/11KV sub stations (135 SS) Project: SCADA system for great Cairo great zone of 135 Sub-Stations 66/11 KV to receive all sub stations equipment feedback status, all protection alarms, MW and MVAR load of all feeders and transformers, kV of 66 and 11 kV bus bars and also to make supervisory control for 66 and 11 kV circuit (making close and open from the center) · Duties: a- Planning, complete supervision on the designs applied on the existing sub stations equipment schematic drawings b- Following up the construction phase with the construction responsible manager c- Scheduled planning and leading of the implementation staff of the commissioning activities of the project in all sub stations (135 SS) Show less

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Electrical Design and commissioning Manager
      • Dec 1999 - Nov 2000

      a- Planning, complete supervision on the designs applied on the existing sub stations equipment schematic drawings b- Following up the construction phase with the construction responsible manager c- Scheduled planning and leading of the implementation staff of the commissioning activities of the project in all sub stations (135 SS) system, heat tracing system, all 6.3 KV pumps motors and all 415V LV pumps. · Duties: From the above-mentioned starting work period of the company… Show more a- Planning, complete supervision on the designs applied on the existing sub stations equipment schematic drawings b- Following up the construction phase with the construction responsible manager c- Scheduled planning and leading of the implementation staff of the commissioning activities of the project in all sub stations (135 SS) system, heat tracing system, all 6.3 KV pumps motors and all 415V LV pumps. · Duties: From the above-mentioned starting work period of the company (handed over from the Egyptian government operation & maintenance responsibility) I have made the following: a- Planning & scheduling the preventive maintenance which was derived by EMPAC system software for all equipment including the following: b- Monitoring and controlling the implementation of the planned preventive maintenance as the EMPAC system software was used to for the maintenance activities and also for the warehouse spare parts control for the forecasting procurement. c- Reporting directly to the plant manager for the monthly performance achieved and the proposed attenuation inside the preplanned budget Show less

    • Czechia
    • Railroad Equipment Manufacturing
    • 1 - 100 Employee
    • Electrical commissioning engineer
      • Mar 1997 - Mar 1999

      Alexandria, Egypt Site: SIDI KRIR POWER STATION (two SIEMINS Gen. Sets, steam turbine, 325MW each and contain a desalination unit). · Duties a- Commissioning of two start up transformers and two main transformers {startup 32MVA, 220/6.3KV and main trans.400 MVA, 21/220KV} HYOUNDAI manufacturing b- Commissioning of unit#1&2 medium voltage switches gear (6.3KV) GE manufacturing. c- Commissioning of all load centers (8 power centers) GE manufacturing. d- Commissioning of all motor control… Show more Site: SIDI KRIR POWER STATION (two SIEMINS Gen. Sets, steam turbine, 325MW each and contain a desalination unit). · Duties a- Commissioning of two start up transformers and two main transformers {startup 32MVA, 220/6.3KV and main trans.400 MVA, 21/220KV} HYOUNDAI manufacturing b- Commissioning of unit#1&2 medium voltage switches gear (6.3KV) GE manufacturing. c- Commissioning of all load centers (8 power centers) GE manufacturing. d- Commissioning of all motor control centers (16 MCC) GE manufacturing. e- Commissioning of the most motorized valves. f- Making tests required for all medium voltage cables including high voltage test (10KV nominal voltage XLPE cable) g- Participation in the DCS commissioning activities Show less

    • Business Consulting and Services
    • 1 - 100 Employee
    • Consulting Engineer
      • Sep 1995 - Nov 1996

      Muscat, Masqaţ, Oman Site: Maanah Power project, SULTANATE OF OMAN - The project was 3 Gen. Sets gas turbine 33MW, 5 GIS sub stations spread · Duties: supervision of all construction and commissioning activities in 5 sub-stations and reporting the required recommendations through my company to the ministry of electricity and water (MEW) to be corrected, modified or to be taken in consideration if it is not contractually mentioned to be negotiated with the contractors.

    • Egypt
    • Government Administration
    • 300 - 400 Employee
    • Electrical Maintenance Engineer
      • Feb 1989 - Aug 1995

      Cairo, Egypt Site: (Cairo south power station) · Duties: responsible for the maintenance activities for all load (power) centers, motor control centers water treatment plant equipment, medium voltage SWGR and 6.3KV derives, all motorized valves, GIS and all power transformers

    • Electrical Maintenance Engineer
      • May 1987 - Feb 1989

      10th of Ramadan, Sharjah, Egypt Site: cables factory in 10th of Ramadan city · Duties : Maintenance of all derives and equipment in all sectors of the factory including drawing, stranding insulation, assembling armoring and testing stages

Education

  • Cairo University-Electrical Power & Machines Engineering
    Master of Science (MSc), MSC Degree
    1989 - 1994

Community

You need to have a working account to view this content. Click here to join now