Dheeraj Rana
Air Diving Supervisor(ADCI) at ISEAS LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
ISEAS LLC
-
United Arab Emirates
-
Oil and Gas
-
1 - 100 Employee
-
Air Diving Supervisor(ADCI)
-
Sep 2021 - Present
working on GRP 3 mtrs water intake power plant F-3 project placing Pipeline with Seahorse,removing Jacks & Shadels,fixing Reducer and Extensions & placing Geo-Textile... working on GRP 3 mtrs water intake power plant F-3 project placing Pipeline with Seahorse,removing Jacks & Shadels,fixing Reducer and Extensions & placing Geo-Textile...
-
-
-
ADNOC Group
-
United Arab Emirates
-
Oil and Gas
-
700 & Above Employee
-
Lead Diver
-
Aug 2015 - Sep 2021
3 SBM(Chinese Lantern & Blue Water) subsea hose & flooring hose changing,ruteen deck maintenance & General Dive jobs and Oil Tanker operation Morning and Demoring..... 3 SBM(Chinese Lantern & Blue Water) subsea hose & flooring hose changing,ruteen deck maintenance & General Dive jobs and Oil Tanker operation Morning and Demoring.....
-
-
-
STFA Construction Group
-
Türkiye
-
Construction
-
400 - 500 Employee
-
Air Diving Supervisor(ADCI)
-
Sep 2014 - Aug 2015
Diving carried out for Jatty construction, Block placing,Internal survey aggregate graveling with 50/150 & 20/50 gravels.Laying of Geo-Textile & placing Accropods Diving carried out for Jatty construction, Block placing,Internal survey aggregate graveling with 50/150 & 20/50 gravels.Laying of Geo-Textile & placing Accropods
-
-
-
Hull Offshore Diving Service WLL(Bahrain)
-
Iran offshore
-
DMT Air Diver
-
Jun 2014 - Jun 2014
Hullwarti Foresight Driller lX Rig, Grid blasting of U WELD on the Bow LEG for MPI & final GPI of BOW LEG... Hullwarti Foresight Driller lX Rig, Grid blasting of U WELD on the Bow LEG for MPI & final GPI of BOW LEG...
-
-
-
Fugro
-
Civil Engineering
-
700 & Above Employee
-
DMT Air Diver & Skipper
-
Apr 2014 - May 2014
Quey wall construction & Installation of Bar Anode on Boat Landing Piles.... Quey wall construction & Installation of Bar Anode on Boat Landing Piles....
-
-
-
DCN Diving
-
Netherlands
-
Oil and Gas
-
100 - 200 Employee
-
DMT Air Diver & Skipper
-
Feb 2014 - Mar 2014
Quay wall construction,Geo Textile placing,Accropods placing ETC. Quay wall construction,Geo Textile placing,Accropods placing ETC.
-
-
-
DCN Diving
-
Netherlands
-
Oil and Gas
-
100 - 200 Employee
-
Air Diver & Skipper
-
Jul 2013 - Dec 2013
Quay wall construction, Geo Textile placing, Accropods placing ETC. Quay wall construction, Geo Textile placing, Accropods placing ETC.
-
-
-
ATHENA SA GREECE
-
Construction
-
1 - 100 Employee
-
Air Diver
-
Sep 2012 - Apr 2013
Laying of pipeline 24"and connecting of flange joints and inspection. Laying of pipeline 24"and connecting of flange joints and inspection.
-
-
-
Transocean
-
Switzerland
-
Oil and Gas
-
700 & Above Employee
-
Air Diver
-
Jun 2012 - Jul 2012
Cleaning of Spud Cane,Weld for Inspection,Video Survey for N.D.T Cleaning of Spud Cane,Weld for Inspection,Video Survey for N.D.T
-
-
-
ATHENA SA GREECE
-
Construction
-
1 - 100 Employee
-
Air Diver
-
Feb 2012 - Apr 2012
Diving carried out for Jatty construction-Graveling with 20/50 Gravels
-
-
Air Diver
-
Nov 2011 - Jan 2012
Diving carried out for Jatty construction Block placing, Internally Survey, Aggregate-Graveling with 50/150 & 20/50 Gravels, Laying Geo.
-
-
-
Under Water Services PVT.LTD.
-
Paradeep
-
Air Diver
-
Aug 2011 - Oct 2011
Diving carried out for INSPECTION and CONFIGURATION of SUBSEA HOSE.Replacing of Puncher Hydraulic Umbilical and Parker Couplings at Plem. Diving carried out for INSPECTION and CONFIGURATION of SUBSEA HOSE.Replacing of Puncher Hydraulic Umbilical and Parker Couplings at Plem.
-
-
-
Adsun Offshore
-
India
-
Oil and Gas
-
1 - 100 Employee
-
Air Diver
-
Mar 2011 - Apr 2011
Diving carried out for Changing the 24"SUB SEA HOSE of the SBM of CHINESE LATTEN Adjustment and Replacement of Mooring Chains. Diving carried out for Changing the 24"SUB SEA HOSE of the SBM of CHINESE LATTEN Adjustment and Replacement of Mooring Chains.
-
-
-
ATHENA SA GREECE
-
Construction
-
1 - 100 Employee
-
Air Diver
-
Jan 2011 - Mar 2011
Diving carried out for Jatty construction Block placing,Internal Survey, Aggregate Graveling with 50/150 & 20/50 Gravels Laying of Geo-Textile.
-
-
Air Diver
-
Mar 2010 - Dec 2010
Diving carried out for Jatty construction Block placing Internal Survey, Aggregate-Graveling with 50/150 & 20/50 Gravels. Laying of Geo-Textile.
-
-
-
HAL OFFSHORE LTD
-
India
-
Oil and Gas
-
300 - 400 Employee
-
Air Diver
-
Jun 2009 - Nov 2009
Diving carried oput for Under Water Videography & Maintanence of S.P.M & M.G.R of Anchor Pile Chain and Installation of Bar Anode in the Moon Pool and Moring & Demoring of Tanker. Diving carried oput for Under Water Videography & Maintanence of S.P.M & M.G.R of Anchor Pile Chain and Installation of Bar Anode in the Moon Pool and Moring & Demoring of Tanker.
-
-
-
HAL OFFSHORE LTD
-
India
-
Oil and Gas
-
300 - 400 Employee
-
Air Diver
-
Feb 2008 - Dec 2008
Diving carried out for the Installation of Bar Anode,and Riser Clamp on 16"Riser & Changing of Floating Hose of Delta SBM in Delta Field of Bombay High. Diving carried out for the Installation of Bar Anode,and Riser Clamp on 16"Riser & Changing of Floating Hose of Delta SBM in Delta Field of Bombay High.
-
-
-
Aqua Diving Services Ltd
-
United Arab Emirates
-
Maritime Transportation
-
1 - 100 Employee
-
Air Diver
-
Jul 2008 - Aug 2008
Diving carried out for Salvage by using BROCO CUTTING... Diving carried out for Salvage by using BROCO CUTTING...
-
-
Education
-
Central Board of Secondary Education
Bachelor of Arts - BA, Art/Art Studies, General