Desmond Ip

QA/QC Engineer at Okra Solar
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shenzhen, Guangdong, China, CN
Languages
  • English Native or bilingual proficiency
  • Chinese Mandarin Professional working proficiency
  • French Elementary proficiency
  • Cantonese Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • SITRAIN Training for Industry Level 1
    Siemens
    Dec, 2017
    - Nov, 2024
  • Book 7 - Ontario Traffic Management - Temporary conditions
    Ontario Canada
    Nov, 2017
    - Nov, 2024
  • Autocad 2D & 3D Professional Drafting and Design
    Autodesk
    Jan, 2017
    - Nov, 2024

Experience

    • Australia
    • Solar Electric Power Generation
    • 1 - 100 Employee
    • QA/QC Engineer
      • Oct 2021 - Present

      Developing an automated test code and equipment for the Okra Edamame - a highly intelligent DC power grid system that will liberate the world from power poverty. System testing is written with python and C++ and built with electronics knowledge with a sprinkle of love. Created the Wifi Cicada EOL (End Of Line) testing equipment and script. - Manufactured the Cicada Bed Of Nails (BON) - a custom-made testing equipment - Uses relays to trigger flash/operation conditions - Flashes ESP8622 controller - Connects to a self-hosted network to get NTP time. - Automated repeat process if unsuccessful Setup VPN server into China office for remote work and VPN access beyond the great firewall. - Linux server - Wireguard VPN - V2Ray proxy Created the Camera Automated Testing Equipment for the LCD screen regression tests. - Executes button presses with relays controlled by a usb/serial converter - Image capture and image processing with OpenCV - Uses Tesseract OCR for text recognition - Image comparison with PyImageSearch algorithms Testing Village (Shenzhen) - Okra solar panels and pods setup in office - Regular checks with firmware/hardware updates per testing criteria - Test compatibility between Pod/battery with appliances - Calculate theoretical data and measure actual results - Time and power for a bucket of water to freeze Show less

    • Draftsman, Tech Developer
      • Jan 2018 - Jan 2021

      Project: "The Harbour Cube" - A resin-poured cube for public display and seating, which self-charges with solar panels and lights up at night. - Uses AtMega328pu microcontroller with a DS3231 RTC module controlling when lights turn on and off. Draftsman - Created CAD schematics from the designer's drawings to be submitted to production - Supervised with the installation of furniture and renovation on site Project: "The Harbour Cube" - A resin-poured cube for public display and seating, which self-charges with solar panels and lights up at night. - Uses AtMega328pu microcontroller with a DS3231 RTC module controlling when lights turn on and off. Draftsman - Created CAD schematics from the designer's drawings to be submitted to production - Supervised with the installation of furniture and renovation on site

    • Construction
    • 1 - 100 Employee
    • Asbuilt Coordinator
      • Oct 2018 - May 2019

      Worked at Trinity Communications Services Ltd for two years. Promoted from Installation technician to asbuilt coordinator Asbuilt coordinator: - Updated and created asbuilt telecommunication construction drawings that will be submitted to the city of Toronto. - Used AutoCAD and photoshop to create submission documents to government utilities - Coordinated temporary traffic conditions during the installation of telecom equipment in accordance with Book 7 and OSHA standards Installation Technician: - Sorted and delivered warehouse equipment to resupply existing projects - Installed aerial and underground RG6, RG11, Plenum etc. cables from node to customer. - Configured trunks, FOSCs, taps to their expected values and installed in public areas while in accordance with OSHA regulations * Asbuilt - Final version of drawings. Planned construction will often get changed and therefore needs a final update. Show less

    • Canada
    • Medical Equipment Manufacturing
    • 1 - 100 Employee
    • Research Technologist
      • Jul 2017 - Dec 2017

      Research Technologist - Assembled a prototype power supply for a medical laser unit used for eye surgery. - Researched into upgrading their Thermoelectric cooling (TEC) for PSU. Research Technologist - Assembled a prototype power supply for a medical laser unit used for eye surgery. - Researched into upgrading their Thermoelectric cooling (TEC) for PSU.

Education

  • Seneca College of Applied Arts and Technology
    Advanced Diploma, Electrical, Electronic and Communications Engineering Technology/Technician
    2013 - 2016
  • Le Wagon
    Fullstack Web Development, Fabulous
    2021 - 2021
  • Australian international school hong kong AISHK
    High School

Community

You need to have a working account to view this content. Click here to join now