Derek Johnston

Senior Maintenance & Reliability Consultant at Triad Unlimited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Brandon Edgett

I had the privilege of working with Derek on a very large project with a lot of moving parts. Derek is a go-to-person in situations requiring a lot of thought, communication, analysis, hard-work, and straight-forward execution. He has a wealth of knowledge from both hands-on experience and leadership experience in regards to reliability and asset management of high-throughout manufacturing facilities. I went to Derek many times throughout our project for guidance and understanding on next best steps forward. He has exceptionable ability to thin slice a situation to prioritize efforts in the right direction.

Ryan Schmidt

Frist words that come to mind when working with Derek, "Hard Worker". This individual comes to work everyday with the mind set to complete the job. I have had the pleasure of working with Derek on many different projects for multiple different companies. He is an absolute team player willing to take on any role needing to be filled. He has a desire to gain the most knowledge possible in whatever environment he is. It is nice to see someone in our generation with the work ethic of past generations.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Consumer Goods
    • Senior Maintenance & Reliability Consultant
      • May 2022 - Present

      Asset identification. Failure Mode Analysis. Proactive Task Association. Spare Parts Association. Business Development Oil and Gas sector. Relialytics – Asset Management Program. Asset identification. Failure Mode Analysis. Proactive Task Association. Spare Parts Association. Business Development Oil and Gas sector. Relialytics – Asset Management Program.

    • United States
    • Construction
    • 1 - 100 Employee
    • Business Manager Alaska Ops
      • Nov 2019 - Jul 2022

      Led initial development of a new business unit in Alaska Managed relations with the major developers and construction leaders. Worked continuously on brand marketing and vertical integration. Defined project scopes and managed and participated in procuring project materials. Developed and maintained project budgets, schedules, and deliverables. Worked closely with internal and external Engineering Directors. Worked closely with Geotechnical Engineers, Key Stake Holders, and Company Authorities to elevate the development around the guidelines for installing Helical piles in a permafrost environment. Managed outside contracts and contractors. Managed Project Schedules. Cost Control - Critical to ensuring project delivery is within cost constraints and managing project. finances intelligently. We performed detailed Risk assessments on the work scope. Remote Job Walk downs - Managed In-depth and detailed logistical challenges. Oversaw team that removed the first Helical Piles in permafrost after two years of freeze-thaw seasons; ( R&D ). Oversaw project team that installed the First 12" Helical Piles in permafrost, supporting production for pigging operations for a large operator. - Prudhoe Bay, Alaska.

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Maintenance & Reliability Consultant
      • Feb 2017 - Dec 2019

      Complete End to End Infor EAM Implementation for one of Pfizer's largest Pharmaceutical Plants. Built and oversaw the assembly of Maintenance Hierarchies. Oversaw all data conversion and validation processes for the entire Instrumentation Team. Created all work guides for users. trained 50% of employees on user functionality site-wide. Oversaw the Generation, Scheduling, Execution, and Completion of 1079 PM work orders in the first month of Go-Live with 0% overdue or late. Created Leading and lagging KPIs. Created and implemented scheduling processes for the entire Instrumentation Team. Created and generated daily work order health reports for scheduling and prioritization.

    • Owner
      • Aug 2015 - Jan 2017

      We provided residential and commercial concrete services in Katy, Texas, and surrounding areas. structural load-bearing foundations, broomed and stamped concrete, pool deck installation, driveways, outdoor kitchens, and fireplaces. We provided residential and commercial concrete services in Katy, Texas, and surrounding areas. structural load-bearing foundations, broomed and stamped concrete, pool deck installation, driveways, outdoor kitchens, and fireplaces.

    • United States
    • Hospitality
    • Maintenance & Reliability Project Team Lead (Western Assets)
      • Aug 2013 - Jul 2015

      Led efforts on five different CMMS implementations, both end-to-end and task dependencies. The client list included; BP, Marathon Oil, Devon Energy, Cheniere, and Access Midstream.Building and loading Maintenance Hierarchies from PNID or legacy client data. Asset walk-down tagging and verifying process equipment in Compression Facilities.Building preventative maintenance strategies utilizing different system functionalities.Building presentations and proposals documents.Training employees on user functionality. End-user/life cycle support.Maximo CMMS Implementations.Led efforts in an SAP Financial remediation for BP and Baker Hughes.

    • CMMS Maintenance Specialist
      • Aug 2011 - Aug 2013

      Acted as a Liaison between the Corporate Business and the Field Business Unit to resolve deployment issues.Worked directly with technicians, planners, and schedulers to ensure correct data was being used and processes were being implemented.Analyzed project load templates to ensure data was correct for system migration.Communicated issues and created resolutions.

    • France
    • Railroad Equipment Manufacturing
    • Field Maintenance Planner - Pipeline Inspector
      • Aug 2008 - Aug 2011

      Field Maintenance Planning.Engineered and oversaw drawings and approvals for pipeline lifting operations.API inspections / Certified NDT level 1 visual inspector supporting the corrosion team.Visual Field Planning for Maintenance Crews.

    • General Maintenance Technician
      • Sep 2008 - Sep 2009

      Campaign Maintenance Technician.Clean Safety Record.JSA's, Permitting, Lockout Tagout.Corrosion Technician for Commissioned Equipment.

Education

  • Wayne State University

Community

You need to have a working account to view this content. Click here to join now