    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jan 2016 - Present

      1. in concept phase: -> a. estimate and complete DFM of metal parts; -> b. review the top risks and issues 2. in development phase: -> a. review supplier's DFM and processes layout, -> b. following project and resolve manufacture's issues, -> c. push and improve process capacity(yield rate, stability) with supplier, -> d. following internal build and testing result. 3. auit new supplier: -> a. estimate supplier's manufacture capacity -> b. estimate supplier's managment system about project , -> c. complete audit report. 4. complete annual mission: IP apply and technical report performance: Z11, Z11 MiniS, Z13 MiniS, M1, N1, RedMagic Show less

    • Product Engineer/Project Manager
      • Nov 2011 - Jan 2016

      2011~2013, Product Engineer: 1. In the phase of new product estimation:make the “feasibility study report”, and provide the parameter for RFQ department. For example the cycle time, the process yield etc. 2. if the product kick off, make the “Flow chart”、”BOM”、”JIG development plan” and “risk management”, trace the building and solve the issues. 3. Collect the issues in the trial run and analyse with correlative department, then make the action and trace the state 4. Optimize the process, improve the “cycle time” and “process yield”. 2013~2016, Project Manager 1. build core team when a new project is awarded. 2. collect project information and preside over a kickoff meeting to review it: project life, project volume, produce DFM and customer's build plan. 3. make internal master plan, material list, tooling/fixture list,capacity report and inventory report. 4. make tooling,fixture and material development plan 5. before and finish build, preside over gate review meeting with team member. 6. issues and riskes management and push plant to close them on time 7. monitor project status,highlight and solve urgent issues. Coordinate resource to complete project's target on time. Show less

    • China
    • Software Development
    • Mechanical Engineer
      • Apr 2009 - Oct 2011

      1. Make the Design Review for new product, optimize the product’s structure for manufacture, estimate the process and make the quotation report. 2. Organize the kickoff meeting, make the project schedule, BOM, Flow chart, PFMEA and control the time about FOT and building 3. Make the DIE quotation report, follow the schedule and solve the issue 4. Cooperate with SQE, PQE to make the quality control plan 5. Discuss the issue list with customer and solve the customer complain 6. Solve the issue in trial run, and progress to improve Show less

    • Tooling Design Engineer
      • Jul 2004 - Mar 2009

      1. Cooperate with the supervisor to estimate the 3D drawing. 2. Design the stretching technics and make the technics surfaces. 3. Design the Tooling and cooperate with other colleagues to design the 3D progress Tooling. 4. Design the each process Jig. For example, the automatic-transfer Jig, the laser Jig, the cutting Jig, Sandblast jig, painting Jig, Hot Melt Machine jig, Laser welding Jig, Stick Jig, and so on. 5. Make the standard document about visual metal Tooling and Jig 1. Cooperate with the supervisor to estimate the 3D drawing. 2. Design the stretching technics and make the technics surfaces. 3. Design the Tooling and cooperate with other colleagues to design the 3D progress Tooling. 4. Design the each process Jig. For example, the automatic-transfer Jig, the laser Jig, the cutting Jig, Sandblast jig, painting Jig, Hot Melt Machine jig, Laser welding Jig, Stick Jig, and so on. 5. Make the standard document about visual metal Tooling and Jig

Education

  • Hunan University of Science and Technology
    Bachelor, Mechanical Design & Manufacture and Automation