derek fields
decomissioning at Dem-Master Demolition Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Welsh -
Topline Score
Bio
Credentials
-
Loading shovel
NPORSDRIVE LTDJan, 2022- Nov, 2024
Experience
-
Dem-Master Demolition Ltd.
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
decomissioning
-
Jan 2018 - Present
-
-
decommisioning oprative
-
Jan 2018 - Present
burning soft strip asbestos loading shovel driver
-
-
-
-
Operator
-
Mar 2016 - Present
-
-
-
kdc
-
GE health care cardiff
-
decommissioning technician
-
Jul 2010 - Sep 2012
decommission air handling vent from the labs using breathing air respiratory as tritium carbon was the main source of activity decommission air handling vent from the labs using breathing air respiratory as tritium carbon was the main source of activity
-
-
-
studsvik uk
-
royal naval base plymouth
-
decommissioning technician
-
Mar 2007 - Apr 2008
drain decontaminate and decommission war head ponds crane operative loading in to iso drain decontaminate and decommission war head ponds crane operative loading in to iso
-
-
-
Babcock International Group
-
United Kingdom
-
Defense and Space Manufacturing
-
700 & Above Employee
-
nuclear power
-
2006 - 2007
to help and assist men and ensure that all entry was dressed and assist in the handling of the air hose .hunterston & hinkley point to help and assist men and ensure that all entry was dressed and assist in the handling of the air hose .hunterston & hinkley point
-
-
-
mowlems nuclear
-
capenhurst chester
-
supervisor decommissioning technician
-
Oct 2004 - Apr 2005
decommission O bay cell for the uranium crane operative to ensure that risk assessments was done daily point of work assessments ensure that the team has read and sign on to working practice and fully understands requirements decommission O bay cell for the uranium crane operative to ensure that risk assessments was done daily point of work assessments ensure that the team has read and sign on to working practice and fully understands requirements
-
-
-
mowlems nuclear
-
AWE aldermaston
-
mowlems nuclear
-
Jun 2001 - Oct 2003
decommission fuel chute test rig filled with iron shot this was built on to the face of a six inch thick steel plat weight alone was just over ten ton built a mcs over it in order to decontaminate the plugs the plugs was then withdrawn using a a frame the plugs was then strapped down and a mechanical saw set in place ready to cut on everybody s exit due to high doze rate this was sill monitored from a window were the emergency cut off power was situated with health physics rps and rpa samples from the blocks showed tritium absorbed also remove of red devils from r61 building using mechanical and monitor
-
-
-
motherwell bridge nuclear
-
trawsfynfedd
-
charge hand decommissioning technician
-
Jul 2000 - Jun 2002
decommission air handling system and 12 shield cooling fans from pile cap to stack on the roof .other small jobs dummy charge pan electrical / mechanical appliances decontaminate and remove some sentenced for llw . remove and size reduce miles of pipe work from tunnels and upper levels using cold cutting technique the program was reactor clean up of r1 and r2 decommission air handling system and 12 shield cooling fans from pile cap to stack on the roof .other small jobs dummy charge pan electrical / mechanical appliances decontaminate and remove some sentenced for llw . remove and size reduce miles of pipe work from tunnels and upper levels using cold cutting technique the program was reactor clean up of r1 and r2
-
-
-
none
-
Gloucester, United Kingdom
-
rolls royce nuclear engineering
-
Apr 1998 - Jul 2000
working in c3 r4 first tent the inside of the ponds north and south apply heppa filter air movers job start remove all steel work and furniture from tunnels and ponds n/s drain water in wash down bay rig a plain up in order to plain walls and floor of cooling ponds the tunnels was done by a bobcat loaded in to drums and then in to a half iso the wall dividing the two ponds was too high counts this was drilled and bust and hydraulic crunch . the wet sumps was done from a man basket lined with lead and wet cut the jack hammed time area 20 minuets due to high counts
-
-
Education
-
houghside college
nuclear decommissioning, Nuclear Engineering -
swinnow