Dennis Clements

Pole Vault Coach at Willowbrook High School
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • 3-Day Aggregate for Mixtures
    Illinois Department of Transportation
  • ACI - Tester
    American Concrete Institute
  • First Aid / CPR
    -
  • ICORS
    Illinois Department of Transportation
  • IDOT – Documentation
    Illinois Department of Transportation
  • Level I Portland Cement Concrete
    Illinois Department of Transportation
  • Level II Portland Cement Concrete
    Illinois Department of Transportation
  • NICET Level II
    NICET
  • Troxler Nuclear Density Gauge
    Troxler Electronic Laboratories, Inc.
  • USACE – CQMC
    US Army Corps of Engineers

Experience

    • United States
    • 1 - 100 Employee
    • Pole Vault Coach
      • Feb 2020 - Present

      Bringing back Pole Vaulting to my Alma Mater (Class of 86) for both young men and young women. Bringing back Pole Vaulting to my Alma Mater (Class of 86) for both young men and young women.

    • Project Engineer / Resident Engineer
      • Mar 2018 - Present

    • Civil Engineering
    • 1 - 100 Employee
    • Project Manager
      • Apr 2017 - Jan 2018

      West Branch DuPage Regional Trail | Winfield & West Chicago, IL | PROJECT / RESIDENT ENGINEERForest Preserve District of DuPage County, IL - The construction of a 17,500 ft bicycle trail. The trail connects to the Geneva Spur of the Illinois Prairie Path in the Winfield Mounds Forest Preserve. It traverses through downtown Winfield and the West DuPage Woods Forest Preserve. ERA’s services include data collection, topographic survey, environmental studies (PESA), drainage studies, hydraulic bridge report, public involvement, preparation of a Project Development Report for CE Group I, permitting and final engineering documents. ERA assisted the Forest Preserve in successfully securing both CMAQ and ITEP funding for this project. Phase II engineering went through the IDOT Letting process while Phase III will follow IDOT documentation requirements.Oak-Illinois-Western Water Main and Western Road Reconstruction | Northbrook, IL | RESIDENT ENGINEERPhase III engineering services for the replacement of water main along Oak Avenue, Illinois Road and Western Avenue in the Village of Northbrook. Work will also include complete reconstruction of approximately 3,100 feet of Western Avenue. Approximately 12,400 feet of new water main replaced the existing cast iron mains that have an extensive break history. The project corridor is lined with primarily residential properties and is also home to Wescott School on Western Avenue. In addition to coordination with residents, design and construction was discussed with District 30 staff in an effort to minimize impacts to the school’s schedule and operations.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Project Engineer
      • Jul 2014 - Jan 2017

      General Engineering Consultant – Illinois State Toll Highway AuthorityPerform documentation audits on Construction Managers for all active Illinois Tollway construction contracts which includes a total of $1.4 billion dollars of work in 2014 and an estimated $1.6 billion dollars of work in 2015. Dennis is also providing construction support for the Illinois State Toll Highway Authority systemwide contracts as a member of the Tollway’s General Engineering Consultant team. Primary responsibilities for this role include Quarterly / Final / Warranty: Walk Thru’s and oversight.I-90 Widening and Reconstruction – Illinois State Toll Highway Authority Dennis is part of the CM team to widen and reconstruct the Jane Addams Memorial Tollway from IL Route 31 to IL Route 47. He observed construction operations for CRC Paving, Signage, MSE Slabs, Drainage, Landscaping, Bridge Deck, and Substructures.Smoothness Testing - Illinois State Toll Highway Authority Dennis is part of a small team that performs all the Smoothness testing for Performance Base PCC Pavement for the widening and reconstruction of the Jane Addams Memorial Tollway.

    • Senior Project Engineer
      • Mar 2012 - Jul 2014

      Forestview Dr. & Riverside Pkwy Sewer & Water Extension Warrenville, 2014Senior Resident Engineer on this project for the Village of Warrenville, Illinois This $1.4 million contract; extended sanitary sewer, and water main via Directional Drilling; from Emerald Green neighborhood under the West Branch DuPage River to serve the Forestview / Riverside neighborhood. The construction of a Sanitary pump station and roadway restoration was required; as well as service connections for 30 homes.2013 Streets Improvement Glen Ellyn, 2013Senior Resident Engineer on this project for the Village of Glen Ellyn, Illinois. Project, which will include 4,000 feet along Country Club Lane, Miller Court, Cranston Court, Grandview between Smith and Hill, and Brandon between Hill and Hillside. The improvements consisted of removing the existing bituminous roadway, driveway aprons, sidewalk and then constructing bituminous roadway with concrete curb and gutter, and modular block retaining walls & sidewalk. Other improvements consisted of new water and sanitary service connection. This project also required interaction with the residents about project schedules, work to be performed and address any of the resident’s questions or concernsFAU 2674 Maddison Street Darien, 2013Knottingham Subdivision Watermain - Road Work Downers Grove, 2012York Center Water Main Improvements York Township, 2012

    • United States
    • Construction
    • 300 - 400 Employee
    • QC Manager
      • Oct 2010 - Dec 2011

      UPRR Relocation of Irving Park Rd - O’Hare Modernization ProgramChicago, Illinois, 2010 - PresentThis $10 million project; entails of the construction of a new railroad bridge structure over Irving Park Rd. for the relocation of the Union Pacific Rail Road to accommodate the future construction at O’Hare International Airport. The project also includes; railroad embankment, the relocation of the Bensenville ditch, and grade separation of Irving Park Road with the proposed RR. UPRR Relocation of Irving Park Rd - O’Hare Modernization ProgramChicago, Illinois, 2010 - PresentThis $10 million project; entails of the construction of a new railroad bridge structure over Irving Park Rd. for the relocation of the Union Pacific Rail Road to accommodate the future construction at O’Hare International Airport. The project also includes; railroad embankment, the relocation of the Bensenville ditch, and grade separation of Irving Park Road with the proposed RR.

    • QC Manager / Project Engineer
      • Jan 2010 - Oct 2010

      Chicago Electronic Fish Barrier 2B, - USACERomeoville, Illinois, 2010 This $16 million federally funded project; consists of a set of electrical arrays and control house. Smith-Root, Inc. of Vancouver, WA designed the technology and electrical components, EP Doyle constructed the building to house the components. The building design required 12” thick - double reinforced architectural concrete walls. Blast proof sealed rooms, with blast louvers, and a tapered built-up concrete roof deck. Dennis is employed as a Contracting Quality Control System Manager to report to the U.S. Army Corps of Engineers. Located on the I & M Canal in Romeoville, Illinois. Responsibilities unique to this project included:• Daily documentation of work activities in USACE – QCS.• Conduct preparatory, initial, & follow-up; meetings with all subcontractors for each definable feature of work.• Track all QC requirements as defined by the Construction Specifications and Document the results of the Inspections & Test in the Quality Control System Database.• Verify quantities and payouts• Track submittals

    • United States
    • Food and Beverage Manufacturing
    • 1 - 100 Employee
    • QC Inspector/ Engineer
      • Nov 2002 - Sep 2009

      North Tri-State Corridor Construction Manager – Illinois State Tollway AuthorityCorridor Construction Management Team for the reconstruction and widening of the southern portion of the North Tri-State Tollway. The corridor limits include all roadways and cross road bridges from Balmoral Avenue to Lake Cook Road. The program includes 14 individual construction contracts with a total estimated cost of completion near $700 million. Primary duties include investigating and resolving field related construction issues with each individual CM, providing real-time updates to Tollway, as various construction related events occur, oversight inspection of concrete structures and pavement, bridge construction, sub grade preparation, toll plaza reconstruction, and M.O.T. staging.I-294 South Tri-State Reconstruction 111th to Cal-Sag River – Illinois TollwayField Engineer for the South I-294 Tri-State Tollway reconstruction project. The project included total reconstruction and widening of southbound and northbound lanes, as well as, 127th Street and Cicero Avenue interchange reconstruction. Dennis was responsible for material coordination with Illinois Tollway and three different Construction Management consultant firms. As well as the inspection of embankment widening, substructures, landscaping and QC/QA material Interstate 20 over Prairie & Simpson Road, Rockford, IL - IDOT The $4.6 million improvement consisted of deck replacement and structure widening at four structure locations carrying US 20 over Prairie Road and Simpson Road. Remove and replace abutment back walls, widen existing piers, add an additional beam to each structure. .UPRR Relocation at Irving Park - O’Hare Modernization Program This $14 million project; entails of the construction of a new railroad bridge structure over Irving Park Rd. for the relocation of the Union Pacific Rail Road.

    • United States
    • Construction
    • 1 - 100 Employee
    • QC Manager
      • Mar 2001 - Nov 2003

      55 Franklin Street Connector – Illinois Department of Transportation As the Quality Control Manager on this $19 million reconstruction project in Chicago, Illinois; Dennis oversaw the QC for the reconstruction of five bridges over I-55 and the CTA train tracks and removal and replacement of several miles of pavement. I-55 / 294 Connectors – Illinois Department of TransportationDennis was the Quality Control Manager on a $13 million reconstruction project for the Illinois Department of Transportation at Indian Head Park, Illinois. He inspected the reconstruction of two bridges over I-55, addition of several new ramps, landscaping, 10,000 feet of noise wall, and the replacement of all roadway lighting including ductbanks, conduits and wiring.47th Street / Des Plaines River – Illinois Department of TransportationDennis was the Quality Control Manager for this $5 million bridge reconstruction and widening project. The project also included rebuilt footings & piers (increased spacing), added pedestrian walkway, and the used high performance concrete for bridge deck.State & Canal / I-55 – Illinois Department of TransportationAs the Quality Control Manager on a $6 million reconstruction project in Chicago, Illinois; Dennis’ QC responsibilities included the inspection and testing required for the reconstruction & widening of two bridges over I-55, patching & repairing existing piers. Also slip forming additional barrier wall at each abutment face, adding beams for widening, and reuse of existing beam. Bishop Ford Reconstruction – Illinois Department of Transportation This $20 million federally funded project; consists of removal and replacement of several miles of pavement, the reconstruction & widening of 7 bridges. Dennis was given the task of Quality Control Manager; he also oversaw PCC patching, adding columns, splicing additional pier caps, and adding beams for the widening.

    • United States
    • Construction
    • 700 & Above Employee
    • Lead Bridge Inspector
      • Mar 1997 - Mar 2001

      Interstate 15 Reconstruction – Utah Department of Transportation Starting as a Materials Tester and rising to a Lead Bridge Inspector on a $2.14 billion reconstruction project for the Utah Department of Transportation in Salt Lake City, Utah. The project included the following components:• Build 146 bridges (replace/new)• Post-Tension Bridge Decks & Pier Caps• Post-Tensioned Deck Panels • Relocating & widening 17 miles of freeway• Addition of several fly over ramps• Built with innovative earthquake resistant technology• Replacement of all roadway lighting including ductbanks, conduits and wiring • Construction and backfill of several Mechanically Stabilized Retaining Walls • Stone Pile Columns• 6 lanes each way with a High Occupancy LaneDennis’ responsibilities as a Lead Bridge Inspector at Wastach Constructors included the following:• Lead inspector for 19 bridges • Coordinated multiple placements• Inspected formwork, rebar, and clearances; per plans• Ensured access and safety at placements• Estimated quantities for concrete placement • Coordinate pile driving QC (heat #, sound piles, location)• Controlled placements i.e. slump, rate of pour, consolidation, de-watering• Dry run bridge decks & overseeing of deck placements• Witnessed and documented Post-tensioning of decks & other structures

    • Higher Education
    • 1 - 100 Employee
    • Engineering Assistant Specialist (553X0)
      • Sep 1986 - Dec 1989

      • Facility upgrade of the Base Exchange (Store)• Construction of New Dormitories• Construction of Training Fire Pit for Airplane Fire• Draftman / CAD Operator (Intergraph) • Facility upgrade of the Base Exchange (Store)• Construction of New Dormitories• Construction of Training Fire Pit for Airplane Fire• Draftman / CAD Operator (Intergraph)

Education

  • Illinois State University
    BS, Construction Management
    1990 - 1994
  • Willowbrook High School
    General, General Studies
    1984 - 1986

Community

You need to have a working account to view this content. Click here to join now