Deepkala Gupta

Electrical Project Engineer at CAPE electric pvt ltd
  • Claim this Profile
Online Presence
Contact Information
Location
Mumbai, Maharashtra, India, IN

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Certificate Course in .Net
    ICIT Computer Institute
    Apr, 2018
    - Sep, 2024

Experience

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Project Engineer
      • Jan 2023 - Present
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2021 - Dec 2022

      • Responsible to visit the site for new project and discuss the client requirement, preparing the bill of quantity, measurement of site. • Responsible to do the estimation of electric sections. • Manage engineering projects and deliver them on time. • Examine needs on new equipment, calculate costs and help prepare budgets. • Preparing electrical drawing in auto cad (Shop drawing / As build drawing) • Responsible to fill the bill of quantity for multiple clients. • Preparation of material checklist, installation check list for multiple clients. • Conducting meager testing, earth testing, cable continuity testing, workstation socket testing & report for the same. • Preparation of Panel Commissioning report. • Preparation of as built drawing and handover document. Show less

    • Electrical Engineer
      • Oct 2018 - Dec 2018

      • Preparing complete cost of estimation for MEP element which includes material, labor, erection equipment, testing /commissioning man hours, direct & indirect resources in line with BOQ scope of work, Project specification and standards. • Study the tender BOQ quantity take off, sending enquiries to the sub-contractor, vendors to get competitive quotation. • Preparing electrical drawing in auto cad (Shop drawing / As build drawing) • Preparing complete cost of estimation for MEP element which includes material, labor, erection equipment, testing /commissioning man hours, direct & indirect resources in line with BOQ scope of work, Project specification and standards. • Study the tender BOQ quantity take off, sending enquiries to the sub-contractor, vendors to get competitive quotation. • Preparing electrical drawing in auto cad (Shop drawing / As build drawing)

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Project Engineer
      • Jun 2015 - Sep 2018

      Projects Handled 1. Willis at Thane (Mumbai) Project Details: Commercial project majiwada thane.Total area is 50,000sq ft. - Preparation of material checklist, installation check list. - Preparation of shop drawings. - Conducting meager testing, earth testing, cable continuity testing, workstation socket testing & report for the same. - Preparation of Panel Commissioning report. - Preparation of as built drawing and handover document. 2. IDFC Bank ,BKC: - Asset list, Escalation chart, SOP preparation, quality reports, - Contracting documents, vendor profile, warranty certificate. - Manpower, material and resource management for different projects to be executed. - Monitoring the laying of power cables, cable trays & testing jobs. - Technical Review of designs and schemes. Preparing Reports as well. 3. Omkar Towers-1973: Project Details: Residential project of Omkar-1973 (Tower-A) At Worli .Total area 27,000sq ft. - Preparation of DPR, Technical Submittals. - Conducting meager testing, earth testing, cable continuity testing, socket testing & report for the same. - Preparing asset list, Escalation chart, quality reports, Contracting documents, vendor profile, warranty certificate. - Manpower, material and resource management for different projects to be executed. - Technical Review of designs and schemes. 4. Shopperstop Ltd. and IDEA Cellular Greenspan in Century Premises at Worli Project Details: Commercial project of Umang, mindspace, malad. Total area 25,000sq ft. - Site Management and Planning for smooth execution of Projects. - Preparation of DPR, Technical Submittals. - Monitoring Execution Process. - Testing of different electrical equipment - Preparation of handover document. - Attending snag points on site. - Preparation of Measurements, Bill (RA) as per work completion. Show less

Education

  • University of Mumbai
    Bachelor of Engineering - BE, Electrical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now