Dayang Ajeerah Abang Husaini

at Vestigo Petroleum Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 1 - 100 Employee
      • Jan 2022 - Present

      • Sep 2019 - Dec 2021

  • Sprintz Designs Sdn Bhd
    • Miri, Sarawak, Malaysia
    • PI Manager
      • Mar 2019 - Aug 2019

      - Provided basic technical and full operations support for PI. - Managed the finances and business operations for PI. - Organized events for the local community for community engagement sessions, teaching and training related with ICT, KDB and multimedia designing for local communities. - Managed eKelas Maxis education sessions for Standard 6, Form 1 to Form 5. - Conducted monthly MCMC reporting for the operations of PI. - Conducted day to day operations of PI. - Provided basic technical and full operations support for PI. - Managed the finances and business operations for PI. - Organized events for the local community for community engagement sessions, teaching and training related with ICT, KDB and multimedia designing for local communities. - Managed eKelas Maxis education sessions for Standard 6, Form 1 to Form 5. - Conducted monthly MCMC reporting for the operations of PI. - Conducted day to day operations of PI.

    • Malaysia
    • Oil and Gas
    • 700 & Above Employee
    • Process Engineering Intern
      • Jul 2017 - Sep 2017

      - Assigned to Western Cluster Field (Bokor, Betty, Laila) in Baram Delta Block (SKO). - Exposed to the code of standards such as PETRONAS Technical Standard (PTS 12.30.02 for Line Sizing), API RP14E, and NORSOK Standard (P-001 for Process Design). - Familiarization of PFDs and P&IDs for Bokor, Betty and Laila fields and understand the piping isometrics for Bokor field. - Performed process line sizing calculations for multiphase flow (upstream) and single gas flow (downstream) by using Microsoft Excel for Laila Fuel Gas Skid Project. - Developed an updated Overall Process Flow Diagrams (PFDs) for Bokor field by using Microsoft Visio. - Perform, calculate, and analyze the flowline erosion velocity adequacy check for well tubing’s in Bokor Field, mainly for BODP-A, BODP-B, and BODP-C by using Microsoft Excel. - Prepare the Minutes of Meetings (M.O.M.) and exposed to the process flow diagram and project management for the Novel Offshore Sand Disposal System (NOSDS) project. - Familiarization of the process flow and visited Miri Crude Oil Terminal (MCOT). - Perform checking on the department’s Excel spreadsheets for process line sizing for liquid, gas, and multiphase lines with conjunction to the PETRONAS Standard, and to standardize the spreadsheet for the department’s use. - Developed the official BTS221 Process Engineering brochure for public information by using Adobe Photoshop. - Participated in the cluster meetings, sharing sessions, engagement sessions and department meetings when necessary. The short courses / sharing sessions were: Process Control Workshop Theory and Applications, Gas Dispersion Modelling Sharing Session, Utilities System Design Sharing Session, Basic Data and Phase Behaviour Sharing Session, Control Valve Sizing Sharing Session. Show less

Education

  • Universiti Malaysia Sarawak
    Bachelor of Engineering - BE, Chemical Engineering
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now