David Duperron

Project Manager at STAT Marine
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Montpellier Metropolitan Area, FR
Languages
  • Français Native or bilingual proficiency
  • Anglais Full professional proficiency
  • Espagnol Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Feb 2010 - Present

      Project Manager and IMR Engineer for various Subsea Maintenance and Inspection Engineering (MIEC) contracts. This includes:- Engineering and drafting activities supervision (Design reviews, Inspection Manuals, Intervention Manuals, Criticality studies, ERS, EPRS, Spare Parts, 3D Modelling) - 4-10 people team ;- Interface with Client and Reporting;- Engineering works;

    • Subsea Superintendant
      • Nov 2007 - Jan 2010

      Subsea Superintendant onboard a production platform offshore Congo for Total (Moho Bilondo).Supervision of Subsea Production System activities (2 manifolds, 9 prodction wells, 5 injection wells, flowlines, flexible risers, umbilicals).Technical assistance to operate the subsea equipment in accordance with the operating philosophy, within the design specifications.Preparation and follow-up of Integrity programs.Supervision of subsea inspection, maintenance and repair activites.Reporting to management team onshore. Show less

    • IMR Engineer
      • Feb 2006 - Nov 2007

      In charge of Inspectability, Maintainability and repair studies for all Subsea equipment for Moho Bilondo (Congo) field development.Technical recommendations to Client (Total).Preparation of all the technical documentation related to future inspection and maintenance activites for all subsea equipment.Preparation os Spare parts recommendations for these equipment.

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Method & Installation Engineer
      • Sep 2002 - Nov 2005

      METHOD / INSTALLATION ENGINEER - 3 YEARS In charge of the preparation, redaction and offshore implementation of the fabrication and installation procedures for Production and Injection risers (single and pipe-in-pipe top tensioned risers) for Kizomba B Project (Exxon, Angola). 2 years of engineering preparation, 8 weeks of offshore installation campaign. CONSTRUCTION ENGINEER - 1 YEAR Site representative for Alto Mar Girassol in Angola (Lobito), I was in charge of the fabrication follow-up of various offshore structures for Girassol Phase 2. This also included the preparation of cargo-barges, rigging, load-out, interface with Subcontractor (Sonamet) and with Client (TFEA), and reporting to AMG office in Paris. TRAINEE - R&D DEPARTMENT - 6 MONTHS I participated to a feasability study for offshore wind farms (COEF project), involving auto-installable gravity base structures (SeaFlower) for large offshore turbines. Show less

Education

  • Centrale Méditerranée
    ESIM 2002, Hydrodynamiques des systèmes offshores
    1999 - 2002
  • Lycée Louis-le-Grand
    Prépa Scientifique
    1996 - 1999

Community

You need to have a working account to view this content. Click here to join now