David Williams

Electrical Commissioning Engineer at Worley
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Trinidad and Tobago, TT
Languages
  • English Native or bilingual proficiency
  • Spanish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Business Consulting and Services
    • 700 & Above Employee
    • Electrical Commissioning Engineer
      • Jan 2023 - Present

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Electrical Commissioning Engineer (seconded to bpTT), TROC, MAHB & AMH Accom. Angelin, Cassia C
      • Mar 2016 - Dec 2022

      July 2021–Dec. 2022, Lead Electrical Commissioning Engineer, Cassia Compression Project, Greenfield Scope (Offshore Rotation), (bpTT) Focus areas: • BUSINESS DEVELOPMENT • COMMUNICATION• QUALITY ASSURANCE AND INSPECTION • RELATIONSHIPS• SAFETY • WORK EXECUTION

    • Senior Electrical Engineer
      • Oct 2014 - Feb 2016

      • COMMUNICATION Submitted weekly reports to the Project Manager and Principal Electrical Engineer Communicated with external stakeholders (e.g., T&TEC) to advise of project requirements.  Developed knowledge of project implementation methodology Identified future projects for Business Development Group and assist with development of strategy to engage the Customer for project implementation.• WORK EXECUTION Reviewed engineering documents, e.g., cable schedule, load lists and equipment specifications, and data sheets. Conducted site visits to Client’s facilities {offshore platforms and onshore facilities} prior to project implementation phase. Ensured project deliverables are submitted in a timely manner and within budget by management of other electrical engineers and designers.  Ensured all deliverables/activities are completed within the WPTL quality requirements. Interfaced with internal stakeholders to ensure deliverables are in accordance with Project Execution Plan and Technical Standards. Verified calculations and studies (e.g., cable sizing, generator sizing, Load Flow and Short circuit analyses) conducted by other engineers and ensure it is completed in accordance with applicable I.E.E.E codes and NFPA 70 standard. Developed cost estimates and submit to Project Engineering Manager for prospective projects. Reviewed Construction Work Packs to ensure alignment with engineering activities.  Assessed the availability of resources for given projects and subsequently advised the engineering manager.• SAFETY Participated in Project Risk Assessment, P&ID reviews, HAZOP and HAZID workshops. • TENDERING PROCESS Assist in Development of Manpower Cost Estimates for ITBP to E&P operators. Show less

    • Trinidad and Tobago
    • Oil and Gas
    • 500 - 600 Employee
    • Supervisor, Telecommunications
      • May 2012 - Oct 2014

      1) Manage (Monitor and Control) Project works for Telecommunications Systems.2) Preparation and Evaluation of Scope of Works for Contracted Telecommunications works.3) Review and Approval of JSAs in accordance with company’s HSE Procedures.4) Conduct maintenance works on SCADA system for pipeline network throughout Trinidad.5) Review and approval of commissioning and Cut-Over documents for new Telecom. Links.6) Supervise, Coach and Mentor staff.7) Conduct performance appraisals for staff.8) Set performance goals (SMART) for staff.9) Determine staff training requirements and make recommendations for programmes to be implemented.10) Develop Budgetary proposal for the following fiscal year 11) Provide recommendations to management on Telecommunications integrity matters, to ensure continuity of service to company’s operations.12) Develop project schedule for Telecommunications tasks on a quaterly, semi-annual and annual basis. 13) Witness Site Acceptance testing of Telecommunications Equipment.14) Implement of company-wide work processes to ensure tasks are completed on a timely basis.15) Submit weekly and monthly reports for Key Performance Indicator (KPI) Reports.16) Conduct presentations based on monthly statistics.17) prepared scope of works, terms and conditions, specifications sheet for invitation to bid package for VOIP PBX system.18) Led an evaluation team for the evaluation of bids for PBX system.19) Client representative and Project manager for implementation phase of VOIP PBX system at company's head office and other sites. Show less

    • Project Engineer - Electrical & Instrumentation
      • Aug 2008 - Apr 2012

      •Conduct E&I Tender evaluations and generate reports for the award of contracts {Budgeted Costs $10,000.00US - $2,000,000.00US}. •Liase with external stakeholders {T&T.E.C} to provide Medium Voltage (12kV) supply for the facility. •Size electrical equipment and materials {Generators, Switchgear, Transformers, UPS, and electrical cables} based on expected load demands.•Supervision of E&I Contractors to ensure that planned tasks are completed as per scope of works, within scheduled time and budgeted costs.•Provide reports on E&I related issues, e.g. HSE reports, Quality reports, Cost reports, Scheduling reports and Design Optimization issues.•Provide technical advice and solutions on E&I matters, for the Engineering Project Team.•Verify engineering design and make relevant changes based on local codes and standards {TTS 121 and NFPA 70, NEC 2008} and best practices of internal stakeholders. •Witness Factory Acceptance Testing of Equipment.•Ensure all E&I activities are performed safely, as per quality and scope of works requirements and in accordance with company HSE standards.•Review of daily reports from E&I Inspectors.. Commissioning of equipment with vendors {e.g. Diesel Generator, UPS, MCC, Air Compressor}. Show less

  • Home Construction Limited
    • Long Circular Mall, Port-of-Spain
    • Facilities Engineer
      • Mar 2008 - Aug 2008

      •Management of Technical staff on a daily basis, to ensure that required works are completed in Commercial centre {500,000 square feet}. •Project Costing and Implementation for Commercial building. •Provide technical advice on Maintenance Issues for Multi-Storey Apartment complex, One Woodbrook Place. {420 apartments}. •Produce & present monthly reports of utility bills and tasks completed. •Develop and Implement engineering solutions to reduce electrical energy consumption. •Operation of Electrical Switchgear (12kV). •Supervision of Electrical Contractor to ensure project works are completed safely, in accordance with quality requirements and as per scope of works, Show less

    • United States
    • Technology, Information and Internet
    • 700 & Above Employee
    • MWD/LWD Engineer
      • Dec 2005 - Feb 2008

      •Team member - configuration and running of Measurement While Drilling & Logging While Drilling Tools (e.g. Telescope, ArcVision, GeoVision, SonicVision and AdnVision) for various well trajectories (vertical, horizontal, S-Type, J-Type) on various drilling rigs. •Maintaining Service Quality parameters to ensure that the given tasks are completed within budgeted costs and required time. •Conduct safety inspections on equipment before commencing drilling activity. •Conduct pre and post job meetings to ensure Quality Health Safety and Environment (QHSE) standards are maintained. •Highlight safety awareness to all personnel on rig. •Identify potential delays; suggest proposed corrective actions as required. •Monitor progress of Drilling Activities to ensure Drilling Optimization. •Prepare and Submit Daily Reports and LWD & Drilling Mechanics logs to Client’s Geologists. •Submit daily financial reports to client and internal management team. •Develop trainee engineers to the position of Junior Engineer and promote good employee relations Show less

    • Trinidad and Tobago
    • Telecommunications
    • 700 & Above Employee
    • Telecommunications Technician
      • Sep 2003 - Dec 2005

Education

  • Edinburgh Business School
    Master of Business Administration - MBA, Oil and Gas management
    2014 - 2022
  • PMP
    Project Management Professional (PMP) Certification, Project Management
    2009 - 2009
  • The University of West Indies, St. Augustine Campus
    B.Sc., Electrical and Computer Engineering
    1998 - 2005
  • San Fernando Technical Institute
    Industrial Instrumentation Engineering Technician, B+
    1997 - 1998
  • John S. Donaldson Technical Inst.
    Electrical, Electronic and Communications Engineering Technology/Technician, B+
    1991 - 1993
  • St. Anthony's College
    1984 - 1990

Community

You need to have a working account to view this content. Click here to join now