David Wilbur

Vice President, Engineering and Construction at California Bioenergy LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bakersfield, California, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • California Contractors Licenses, "A" - General Engineering & "C-10" Electrical
    California State License Board
    Apr, 1989
    - Nov, 2024

Experience

    • United States
    • Renewable Energy Power Generation
    • 1 - 100 Employee
    • Vice President, Engineering and Construction
      • Mar 2020 - Present

      Responsible for the engineering and construction of biodigesters and associated process equipment to convert dairy waste into renewable fuels at dairies throughout the San Joaquin Valley. Responsible for the engineering and construction of biodigesters and associated process equipment to convert dairy waste into renewable fuels at dairies throughout the San Joaquin Valley.

  • EPM Consulting Services
    • Bakersfield, California, United States
    • Director, Special Projects
      • Nov 2019 - Mar 2020

      Worked as DIrector, Special Projects providing Facilities Engineering, Project Management and Long Range Planning services to Terracore Operating Company LLC at their Cat Canyon operation in Santa Maria, California. Worked as DIrector, Special Projects providing Facilities Engineering, Project Management and Long Range Planning services to Terracore Operating Company LLC at their Cat Canyon operation in Santa Maria, California.

    • United States
    • Staffing and Recruiting
    • 700 & Above Employee
    • FE Engineering Superintendent
      • Jan 2019 - Oct 2019

      FE Engineering Superintendent for the Chevron Chuandongbei Gas Project in Nanba, China. The field is a high pressure, high sour gas field. Manage a staff of Project Engineers, Design Engineers, Construction Reps and national contract engineering company personnel. Responsible for the design and execution of all small capital projects during the annual turnarounds and on the run. The facilities include all of the gas gathering facilities, pipelines, gas plant and sulfur removal plant facilities. Show less

    • Turnaround Project Manager
      • Jul 2015 - Jan 2019

      FE Project Manager for the 2016 - 2018 Turnarounds for the Chevron Chuandongbei Gas Project in Nanba, China. The field is a high pressure, sour gas field. The turnarounds include all of the gathering facilities, pipelines, gas plant and sulfur removal plant facilities. Was responsible for setting up the Turnaround Project Design Team and establishing the work procedures. Manage a staff of 12 CDB design engineers and national contract engineering company personnel. Responsible for the design of all capital projects to be executed during the annual turnarounds. Show less

  • Excellence in Project Management
    • Bakersfield, California Area
    • Principal
      • Mar 2015 - Jul 2015

      Provide consulting services and facilities engineering support on several upstream water treatment plants, steam plants, and flue gas desulfurization systems. Provide consulting services and facilities engineering support on several upstream water treatment plants, steam plants, and flue gas desulfurization systems.

    • Oil and Gas
    • 200 - 300 Employee
    • Sr. Facilities Engineer
      • Nov 2009 - Feb 2015

      Project Manager for the $160 MM Arroyo Grande Development Project. The project involved designing and building all new integrated facilities for oil-water separation, oil sales, water treating and steam generation. Several of the challenges included: 1. Permitting - The project was in San Luis Obispo County and required Land Use permits, APCD permits and over 120 building permits. 2. Endangered Species - Numerous threatened and endangered species were present and presented numerous design, permitting and construction challenges. 3. Ultra Pure Water Treatment Plant - The water treatment plant was designed to produce both soft water for steam generation and ultra pure water that met all of the CCR Title 22 drinking water standards and could be discharged into Pismo Creek. 4. Simultaneous Operations - The new facilities were built in the same 15 acre canyon as all of the existing facilities which continued to operate during the entire construction period. Show less

    • United States
    • Chemical Manufacturing
    • Sr Project Engineer
      • Jul 2008 - Nov 2009

    • Owner
      • Feb 2002 - Nov 2008

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Facilities Engineering Supervisor
      • Jan 1986 - Jan 2002

    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer
      • Jun 1981 - Jan 1986

Education

  • University of California, Los Angeles
    Bachelor's Degree, Chemical Engineering
    1975 - 1981

Community

You need to have a working account to view this content. Click here to join now