David Slack

Project Transition Manager at Cornerstone
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cincinnati, Ohio, United States, US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • OSHA 30 Hour Construction Safety and Health
    Occupational Safety and Health Administration
    Oct, 2015
    - Oct, 2024
  • OSHA 10 hour Construction Safety and Health
    Occupational Safety and Health Administration
    Oct, 2013
    - Oct, 2024
  • Prowatch Advanced
    Honeywell
    Oct, 2015
    - Oct, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Transition Manager
      • Jun 2020 - Present

      Ensure effective turnover of the project to the WS&S Regional Office, Ensure effective communications throughout the transition, maintain positive working relationships with all team members, ensure proper documentation of the project, ensure overall project closeout, ensure overall customer satisfaction.

    • Senior Superintendent Construction - Electronics
      • Jan 2013 - Jun 2020

      Oversee and direct site construction, instillation, testing and commissioning of security control, intercom, network, CCTV, Video management, card access, PLC controls and duress systems. This work is conducted in new construction or in existing operational facilities retrofitting while they are maintain operations. Oversee and direct site staff, manage schedules and budget to complete work within project schedule.

  • EO Integrated Systems
    • Washington, Michigan
    • Project Manager
      • Jul 2009 - Jan 2013

      Manage the completion of Austin Bergstrom International Airport security upgrade to a Hirsch and Genetec solution, completed additional projects expanding the system with additional controllers and video servers. Completed the North Carolina Central Prison Hospital and Mental Health Center installation. Manage the completion of Austin Bergstrom International Airport security upgrade to a Hirsch and Genetec solution, completed additional projects expanding the system with additional controllers and video servers. Completed the North Carolina Central Prison Hospital and Mental Health Center installation.

    • United States
    • Government Administration
    • 700 & Above Employee
    • Project Coordinator
      • Mar 2005 - Jul 2009

      Coordinated with Project managers, City executives, city staff, consultants, contractors to for the project concept, design, specification review, bidding, implementation, and conclusion. Monitored warranty requirements for proper execution Coordinated contractors, sub-contractors with city staff to meet project schedules and the operational needs of the airport Interpreted contract specifications for system design and installation resolve interpretation issues Worked with… Show more Coordinated with Project managers, City executives, city staff, consultants, contractors to for the project concept, design, specification review, bidding, implementation, and conclusion. Monitored warranty requirements for proper execution Coordinated contractors, sub-contractors with city staff to meet project schedules and the operational needs of the airport Interpreted contract specifications for system design and installation resolve interpretation issues Worked with consultants and owner representatives to solve design issues. Tracked and reviewed change proposals, RFI’s, pay applications and submittals. Coordinated the concept, design, installation, and maintenance turn over of the new inline baggage handling system.

    • Electronics Tech III
      • Dec 1998 - Mar 2005

      Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs various testing/troubleshooting and calibration functions. Submit proposals and collaborate on design teams for system upgrades. Coordinate the upgrade of the system with the operational needs of the airport, contractor and engineering Review and approve project designs, upgrades and modifications for Planning and Engineering… Show more Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs various testing/troubleshooting and calibration functions. Submit proposals and collaborate on design teams for system upgrades. Coordinate the upgrade of the system with the operational needs of the airport, contractor and engineering Review and approve project designs, upgrades and modifications for Planning and Engineering staff. Tracks and initiates corrective action for eliminating the root cause of repetitive failures. Work closely with the mechanical engineering group and outside suppliers to improve reliability and operation of all systems resulting in reduced failures/downtime and improved operation for our customers. Oversees contractors for the inspection and maintenance of all fire alarm, suppression systems, consisting of the main terminal and 10 other buildings on site. Maintain and modify programs as needed for Programmable Logic Controllers for 20 unique conveyor systems and their operator interface panels Maintained and trained new technicians in test and calibration of the following systems. Fire Alarm, Paging and Sound, Conveyor, Security, Jetway, Jet power, Pcaire, Sprinkler, Automatic electric doors, Screening security gates, and multi gas detectors.

    • United States
    • Semiconductor Manufacturing
    • 700 & Above Employee
    • Final Test Engineer
      • Oct 1997 - Nov 1998

      Initiated, developed, and implemented new Helium Leak Check Procedure which reduced cycle time by approximately 5-7 hours per system, improved accuracy of leak check process and reducing Quality Assurance issues on audits by 20%. Facilitated multi-disciplinary team meetings to finalize and adopt new Procedures and standard for division. Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs… Show more Initiated, developed, and implemented new Helium Leak Check Procedure which reduced cycle time by approximately 5-7 hours per system, improved accuracy of leak check process and reducing Quality Assurance issues on audits by 20%. Facilitated multi-disciplinary team meetings to finalize and adopt new Procedures and standard for division. Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs various testing/troubleshooting and calibration functions. Performs complex Electro/mechanical repairs. Assists in eliminating the root cause of repetitive failures. Work closely with the mechanical engineering group to improve cycle time in new lean line concept resulting in reduced cycle time through final test. Certified testing and calibrating the Centura System including CXZ, DXZ, DLH, SACVD, DPA, WXZ, ETCH, Sputter Etch Chambers. Trained new technicians in test and calibration on the Centura System. Show less Initiated, developed, and implemented new Helium Leak Check Procedure which reduced cycle time by approximately 5-7 hours per system, improved accuracy of leak check process and reducing Quality Assurance issues on audits by 20%. Facilitated multi-disciplinary team meetings to finalize and adopt new Procedures and standard for division. Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs… Show more Initiated, developed, and implemented new Helium Leak Check Procedure which reduced cycle time by approximately 5-7 hours per system, improved accuracy of leak check process and reducing Quality Assurance issues on audits by 20%. Facilitated multi-disciplinary team meetings to finalize and adopt new Procedures and standard for division. Works from highly complex test procedures, Electro/mechanical schematics, diagrams, written and/or verbal descriptions for performing tests. Performs various testing/troubleshooting and calibration functions. Performs complex Electro/mechanical repairs. Assists in eliminating the root cause of repetitive failures. Work closely with the mechanical engineering group to improve cycle time in new lean line concept resulting in reduced cycle time through final test. Certified testing and calibrating the Centura System including CXZ, DXZ, DLH, SACVD, DPA, WXZ, ETCH, Sputter Etch Chambers. Trained new technicians in test and calibration on the Centura System. Show less

  • Nutek Inc.
    • Pensacola, Florida Area
    • Electronic Equipment Production Assembly
      • Dec 1996 - Oct 1997

      Interpreted and corrected electrical schematics, blueprints, and technical manuals resulting in customer receiving accurate and working systems. Supervised up to six technicians in assembly of I/O distribution systems resulting in on time deliveries and avoidance of $5,000 day late penalty. Insured all newly built equipment complied with required UL standards Interpreted and corrected electrical schematics, blueprints, and technical manuals resulting in customer receiving accurate and working systems. Supervised up to six technicians in assembly of I/O distribution systems resulting in on time deliveries and avoidance of $5,000 day late penalty. Insured all newly built equipment complied with required UL standards

    • Aircraft Electrician Mechanic
      • Oct 1994 - Oct 1996

      Performed troubleshooting, removal and replacement of components to insure sound and safe operations. Repaired all electrical connections including cannon plugs of various types to insure sound and safe operations. Performed inspections, fueling, servicing, starting, directing and recovery of aircraft insuring safe and timely operations. Performed troubleshooting, removal and replacement of components to insure sound and safe operations. Repaired all electrical connections including cannon plugs of various types to insure sound and safe operations. Performed inspections, fueling, servicing, starting, directing and recovery of aircraft insuring safe and timely operations.

    • United States
    • Armed Forces
    • 700 & Above Employee
    • Cryptologic Technician Communication
      • Jun 1989 - Mar 1994

      Successfully completed a West Pacific Cruise to the Persian Gulf and the Gulf of Arabia. Received an Honorable Discharge upon decommissioning of the USS Fox.

    • Aviation Electronics Technician
      • Jun 1989 - Mar 1994

      Supervised up to 20 personnel during the weekend shift insuring all requirements were met for the flight schedule. Successfully completed Aviation Electronics Technician class “A” school achieving an 89.9% course average

Community

You need to have a working account to view this content. Click here to join now