David Lewis

Business Development and Project Manager at Fluid Control AS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Hans Christian Hodne

I have been working together with Dave in Subsea 7 and in Halliburton before that. We worked together in projects like; Knarr tie in of FPSO and Valhall Re-Development. David is professional and knowledge full and has taught me a lot about pre-commissioning and project execution. I hope I will have the opportunity to work together with David again.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 1 - 100 Employee
    • Business Development and Project Manager
      • Mar 2016 - Present

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Pre-Commissioning Lead Engineer for Chevron Overseas Lianzi project
      • Oct 2015 - Dec 2015

      Pre-Commissioning Lead Engineer for Chevron Overseas Lianzi Development Project tied-back to the Benguela Belize Lobito Tomboco (BBLT) platform located in Block 14 in a water depth of 1,280ft. The distance from the furthest Lianzi well to the BBLT platform is 27 miles and the wells will be produced via a daisy chain layout. The contract consisted of:A 12.75 inch OD flowline approximately 27 miles long bringing production from the Lianzi Unit to the BBLT platform. A gas lift system, comprising of a 5.563 inch OD flowline, a flexible riser and ITAs/ PLETs for connecting to individual production wells. An Electro Hydraulic umbilical, My responsibilities included but are were not limited to delivery of progress reports, planning and coordinating the technical expertise and services required to ensure the successful delivery of high quality engineering required to meet the commercial and technical needs of a this contract, including hydrotesting of all flexible lines including risers from the BBLT platform, dewatering of the GL system using a nitrogen generation spread mobilised on-board a supply vessel an vacuum annulus testing of the GL riser.Other areas of responsibility include but are not limited to:• Ensuring that a positive HSEQ culture within the project and ensure project engineers and subcontractors adhere to local HSEQ codes and practices.• Review of subcontractor Commissioning procedures• Liaising with Chevron (client) Commissioning and Start-up team• Interfacing and leading subcontractors activities on-board both the BBLT platform and vessels• Participation of task risk assessments and implementation of resulting actions/control measures as required • Assuming ownership of required project deliverables and responsibility for ensuring timely submission and turnaround of project documentation.

    • Principle Pre-Commissioning Engineer
      • Nov 2010 - Dec 2015

      Relevant Experience:Active member of the Subsea 7 Pre-commissioning, Flow Assurance, Valves, Connectors and Topsides COE (Community of Excellence)Representing Subsea 7 during the DNV Joint Industry Project to develop a guideline for the Pre-Commissioning of pipelines, other members would include Statoil, Halliburton, IKM, BJ services, KP Kenny, Technic, Dong Energy, Nord Stream, Inpex, Atlas Copco and SaipemParticipating in Subsea 7 technical forums within my discipline / Actively attending community of excellence conferencesMentoring of new engineersReview/evaluation and production of discipline Global and Best Practice documents

    • Pre-Commissioning Lead Engineer for BG Knarr project (EPIC)
      • Sep 2012 - May 2015

      Pre-Commissioning Lead Engineer for BG Knarr project (EPIC)Reporting to the Engineering Manager, with responsibility for the Pre-commissioning team on the BG Knarr EPIC project (engineering, procurement, installation and construction) the contract is for a 4.5km flowline bundle containing production, water injection and service lines and controls system, a standalone water injection flowline, flexible riser systems, static and dynamic umbilical’s systems. It also includes various subsea structures, associated tie-in spools and GRP protection covers and the connection and testing of the complete subsea architecture. My responsibilities include but are not limited to design calculations, specifications, progress reports, planning and coordinating the technical expertise and services required to ensure the successful delivery of high quality engineering required to meet the commercial and technical needs of a SURF contract.Other areas of responsibility include but are not limited to:Ensuring that a positive HSEQ culture within the project and ensure project engineers and subcontractors adhere to local HSEQ codes and practicesReview of Commissioning procedures for Export Pipelines/infield bundle, umbilical’s & FPSO flexible risersLiaising with BG (client) Commissioning and Start-up teamInterfacing with subcontractorsParticipation of task risk assessments and implementation of resulting actions/control measures as required Assuming ownership of required project deliverables and responsibility for ensuring timely submission and turnaround of project documentation

    • Principle Pre-Commissioning Engineer
      • Nov 2010 - Nov 2012

      Pre-Commissioning Lead Engineer for Subsea 7 BP Skarv Development & Valhall Redevelopment Projects Responsible for the Pre-commissioning team on the BP Skarv & VRD projects, including design calculations, specifications, progress reports, planning and coordinating the technical expertise and services required therefor ensuring the successful delivery of high quality engineering required to meet the commercial and technical needs of a very demanding client.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Snr. Commissioning Engineer
      • Jan 1998 - Nov 2010

      Halliburton PPS Business Development Technical Adviser responsible for development of technical solutions for business opportunities The development and use of a hose deployment systems using RTP and Black Eagle hoses including products from Parker (Black Eagle), Wellstream (Halliflow) and Pipelife Holland (Soluforce) for flooding and testing of pipelines from a vessel Responsible for the design, procurement, fabrication and testing of purpose build hydraulic hose spooling devices for use with unaided hose deployment recovery systems for both the pipeline and stimulation departments (well intervention vessels) A study resulting in a design proposal for hose clamps with Havtrol and Statoil RFO A study on pipeline over pressure protection where the report and findings are incorporated into the Halliburton global standards A study on hose and subsea hose deployment Creating an electronic department equipment data manual for the PPS and SSC department (This manual is used as a global sales tool) Deputy Department manager for Pipeline and Process department in Norway, involved in the acquisition of new equipment and preparation of instruction manuals for the correct use and operation of equipment Business development technical advisor with responsibility for the BP Frigg decommissioning project and the Goliat development Responsibility for the Seabed excavation operations in the Norwegian sector of the N. Sea

Education

  • TS indefatigable

Community

You need to have a working account to view this content. Click here to join now