David Leonard

Construction and Installation at Pertamina Patra Drilling Contractor
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Batam, Riau Islands, Indonesia, ID
Languages
  • English -
  • Indonesian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Construction
    • 300 - 400 Employee
    • Construction and Installation
      • Oct 2022 - Present

    • Construction Manager
      • Apr 2020 - Aug 2022

      SIEMENS-LNG Canada

    • Site Manager
      • Apr 2019 - Apr 2020

      SIEMENS E-House Fabrication & InstallationLampunut Development Plant

    • Indonesia
    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer/Field Engineer
      • Jul 2013 - Jul 2017

      Responsible to be a liaison between the project manager and operational involved in a project, primary technical point of contact for subcontractor during construction process . - Provide schedule preparation, pre-planning and resource forecasting for engineering and other technical activities relating to the project - In charge to raise TBE for vendor - In charge to raise TBE for Subcontractor, conduct meeting with subcontractor, inspect subcontractor equipment and certificate including manpower loading which tie-in to project schedules. - Manage project team resources and training during preparation. - Control day by day progress of the project and ensure projects are completed according to project plans Show less

  • PT. Starindo Tunggal Pratama
    • Wasco Fabrication Area (Batam)
    • Project Engineer
      • Sep 2012 - Jul 2013

      as Project Engineer for Siemens GLNG Plant Project, located at Wasco Engineering Fabrication Area - Determines project specifications by studying product design, client requirements, and performance standards; completing technical studies; preparing cost estimates - Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements - Maintains project schedule by monitoring project progress; coordinating activities; resolving problems - Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions - Maintains safe and clean working environment by enforcing procedures, rules, and regulations - Contributes to team effort by accomplishing related results as needed Show less

    • Piping Engineer (Field)
      • May 2008 - Jul 2012

      As a Piping Engineer for General Cargo 13,500 DWT; Shinline 9, Shinline 10, Shinline 11 - Design review and check the arrangement piping design and general arrangement. - General check for clash point, access man way, maintenance/ operation access interface between structure, instrument, mechanical equipment, piping arrangement. - Review and check the general arrangements , P&ID, shop drawing. - Review and check the system isometric layout drawings. - Review and check the MTO. - Coordination with team according to the new issue and others, report to arrangement leader, check and review the hold list item Show less

    • Singapore
    • Maritime
    • 1 - 100 Employee
    • Piping Engineer (Field)
      • Apr 2006 - May 2008

      As a Piping Engineer (Field) for Construction of FPSO Conoco Belanak Gas Compression Piping; Flare for EOB2 Ecogreen Oleochemical Plant ; Accomodation Work Barge 175 Pax Swiber Supporter. - Design review and check the arrangement piping design and general arrangement. - Going to the installation area of a piping system and surveying the area for any irregularities, analyze the observations as a part of the process for creating system blueprints. - Creating the initial project scope for all of the tasks that need to be completed in order to install a piping system. estimate cost , resources and the project deadline. - Assist in sourcing and selecting construction materials for piping systems - Identified risk in installation process as well as performed review of hazardous materials - Inspected all piping system and ensured quality and conformance to set standards and specifications - Coordinated with design engineering team and resolved issues on the field Show less

    • Project Engineer
      • Apr 2004 - Jan 2006

      - Assist Company Director (Commercial) in providing technical assistant during contract/ tender specifications with ship owners/ buyers - Assess all aspect and pre-production of engineering design drawing from shipbuilding consultant (Hull, Piping systems, Mechanical/Machinery and others) prior Fabrication Execution. Using 3D design / conceptual CAD drawing. - Revise / re-design necessarily the original drawing for Customer compliance, Effective Operational, Production Efficiency, and improvement in Quality. - Prepare nesting plan & codes for CNC Plasma cutting. - Supervise and manage Sub-Contractors working on Hull Construction, Piping System, Electrical, Mechanical, Carpentry & Painting - Provide key plans, assessment and Create Master Schedule for the management principals in developing annual project schedule, advisory for purchase & delivery estimate for Equipment, Supplies / Consumable. - Create breakdown / cutting plans and details drawings for Hull Construction & Outfitting. - Provide initial estimate / calculation on material for; Hull/Outfitting, Piping, Mechanical, Electrical - Liaise with Owner in demand and compliance of technical requirements, quality issues, according contract specification. - Liaise with Classification Bureau Surveyors in technical issue and quality. - Perform Inspection on installed Ship’s Systems (Hull Construction, Piping, Machinery, and Electrical) for conformity, quality and carry out trouble-shooting and provide technical solutions on system failure that may arise. - Hands-on assisting Production, QA/QC & Commissioning Team for troubleshooting on technical issues that may arise - Organize and support commissioning-team to ensure time of delivery achieved. - Provide Training & Commissioning of the available equipment’s & systems on board the New Ship to the Ship’s Crew assigned. Show less

    • Piping Engineer (Field)
      • Jun 2002 - Feb 2004

      - Design review and check the arrangement piping design and general arrangement. - General check for clash point, access man way, maintenance/ operation access interface between structure, instrument, mechanical equipment, piping arrangement. - Review and check the general arrangements drawing. - Review and check the P&ID drawing. - Review and check the system isometric layout drawings. - Review and check the isometric drawing. - Review and check the MTO. - Coordination with team according to the new issue and others, report to arrangement leader, check and review the hold list item Show less

Education

  • Universitas Hasanuddin
    Bachelor's degree in naval architect, Engineering
    1995 - 2012

Community

You need to have a working account to view this content. Click here to join now