David Hall

Senior Project Manager at Bachy Soletanche
  • Claim this Profile
Online Presence
Contact Information
Location
Chartridge, England, United Kingdom, UK

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Construction
    • 200 - 300 Employee
    • Senior Project Manager
      • Apr 2023 - Present

    • Project Manager
      • May 2021 - Apr 2023

    • United Kingdom
    • 1 - 100 Employee
    • Senior Project Manager
      • Mar 2015 - May 2021

      Management of Piling and Geotechnical contracts, Management of internal and external designers as well as the selection of suppliers and subcontractors in conjunction with the procurement arm. Completed projects involved on include: • Tottenham Hotspurs Football Club new stadium • Bermondsey Dive-under • A14 BN24 & 25 • Clarendon Road Watford for TJX new European Headquarters Current projects: • Admiralty Arch the geotechnical works for the construction of basements to convert the building into a Waldorf Astoria Hotel. • Kensington Odeon piling works for the redevelopment of the site into upmarket residential and commercial space with a deep basement for new cinemas. Operational assistance with preconstruction activities. Show less

    • Contracts Manager
      • Mar 2011 - Mar 2015

      Reporting to the General Manager and Estimating Director. Spend two months in the Netherlands setting up a joint venture on a design and construct contract for the rehabilitation and upgrading of an existing bulk material export jetty and installation of navigation aids in Sierra Leone, responsibilities include drawing up of joint venture agreement and contract, selection and appointment of design consultants, negotiations and appointment of suppliers and subcontractors, planning, cost control, selection of staff from international pool, correspondence to the client and on-going management of our joint venture responsibilities. Other projects involved on include: • Island View Berth 2 Deepening & Reconstruction, Port of Durban – contract management for Dredging, Scour Protection & Piling Package. • Maydon Wharf Berth 12 Reconstruction, Port of Durban (combi wall structure with tieback anchors) – setting up of project team, deliverables, management systems and assistance with start-up of works. • Reconstruction of Island View Berth 5, Port of Durban. • Installation of Fenders in the Port of Nacala, Mozambique. • Kwale Minerals Sands - Pre-assembly and Shipping of a Ship-loader and Conveyor System for Mombasa, Kenya. The supplier of the materials handling equipment went into administration and to assist our client, took over the responsibility for the assembly of the equipment to inspect prior to preparing and loading it for shipment to Kenya on board of a dedicate Project Cargo Vessel. Included the selection and management of MEI subcontractors, Naval Architects and specialised lifting teams. • Maydon Wharf Berths 1-4, 13&14 Reconstruction, Port of Durban (combi wall structure with driven HP pile anchors) –Preconstruction phase then assisting with setting up of project team, deliverables, management systems and start-up of the works. Technical assistance to the tender department with regards to methods, equipment and programming for marine tenders in Africa. Show less

    • South Africa
    • Civil Engineering
    • 1 - 100 Employee
    • Commercial Manager
      • Nov 2007 - Feb 2011

      Reporting to the Operations Director with the following responsibilities: Management of contracts in Southern Africa and Indian Ocean Islands, including sureties, payments and claim negotiations. Risk management in terms of the conditions contract and particular conditions at tender stage through to contract completion. Coordination between client, professional team and construction team. Scope of works included design and construct projects as well as construction only projects. Managing and mentoring of site management to ensure project objectives as well as the client’s requirements were met. From May 2010 share control of the company’s operations with the Plant /Works Manager as the Operations Director’s post became vacant. This entailed site operations, allocation of plant and personnel as well as the plant department. Major projects included the Piling for Viaducts on Gautrain, Slurry Cut-Off wall for Coega Harbour, as well as the geotechnical works for various bridges and dams Show less

    • Quality Engineer
      • Aug 2006 - Nov 2007

      Responsible for implementing the Project Quality System on the Airport Link Section (Marlboro to OR Tambo International Airport). A large section of the system was still been generated and the development of management plans, procedures and lower tier documents formed part of my scope of work. Responsible for implementing the Project Quality System on the Airport Link Section (Marlboro to OR Tambo International Airport). A large section of the system was still been generated and the development of management plans, procedures and lower tier documents formed part of my scope of work.

    • United States
    • Construction
    • 1 - 100 Employee
    • Quality / Safety Manager
      • Jun 2005 - Aug 2006

      Responsible for maintaining the company’s ISO certification. Went to Algeria to source pipelayers required for major pipeline project. Also assisted with contracts management functions in the pipeline division. Reason for Leaving: Approached by Bombela with a market related offer and WK Construction way of working did not allow support functions to operate properly Responsible for maintaining the company’s ISO certification. Went to Algeria to source pipelayers required for major pipeline project. Also assisted with contracts management functions in the pipeline division. Reason for Leaving: Approached by Bombela with a market related offer and WK Construction way of working did not allow support functions to operate properly

    • Manager
      • Feb 2005 - May 2005

      Responsible for the management of day to day operations and procurement of work in a medium sized piling company. Selected and appointed designers, all site management reported to me with regards to all matters. Responsible for the management of day to day operations and procurement of work in a medium sized piling company. Selected and appointed designers, all site management reported to me with regards to all matters.

    • Canada
    • Non-profit Organizations
    • 1 - 100 Employee
    • Contracts Manager
      • Jul 1993 - Jan 2005

      Contracts Engineer promoted to Contract Manager also responsible for the Quality Assurance portfolio. Worked on projects in Southern Africa, including the following major projects. Assistant Project Manager including HSE function Torres Atlantico contract Luanda Angola 2004 (800 Driven Cast in situ piles to –24m). Assistant Project Manager Mondi RB 720 Project, Richards Bay 2003 (1500 piles) 2003. Assistant Project Manager Hillside Expansion Project, Richards Bay (4400 piles) 2002. Assistant Project Manager MOZAL Expansion Project Maputo Mozambique (8100piles) 2001-2002. Assistant Project Manager COSAC Project Kitwe Zambia 1999. Site Agent / Site QA Manager MOZAL Phase I Project Maputo Mozambique (10000 piles) 1998-1999. Site Agent on Droerivier to Hydra 400kV Transmission Line contract (250km). Foundations for Cross Rope Suspension and Self Supporting Towers. Between Beaufort West and De Aar 1996. Technician Columbus Stainless Steel Plant Expansion 1993-1994. Site Agent Athena to Alusaf Hillside Smelter, 3x132kV Transmission Lines Foundations for Self Supporting Towers 1994. Site Agent Polifin VCM Complex and Chlorine Expansion Projects (Sasolburg) 1994. Site Agent Park Station Project (Johannesburg Station) 1995. Retrenched due to the economic climate and expected work Show less

    • Crushing Plant Manager
      • Jan 1992 - Sep 1992

      Responsible for crushing activities and related earthmoving operations, including maintenance of crushing plant, quantities, quality control and meeting production targets. Exposure to drilling and blasting operations as well as transport of the final product. Retrenched due to economic climate, no road contracts requiring on site crushing plants. Responsible for crushing activities and related earthmoving operations, including maintenance of crushing plant, quantities, quality control and meeting production targets. Exposure to drilling and blasting operations as well as transport of the final product. Retrenched due to economic climate, no road contracts requiring on site crushing plants.

    • Brazil
    • Hospitals and Health Care
    • 1 - 100 Employee
    • Technical Assistant
      • Jul 1986 - Dec 1991

      Technical Assistant Motherwell township services contract Port Elizabeth - -Supervision Technical Assistant Mosgas Project Mossel Bay. Contract for 90km underground piping (concrete and steel). Quality control, ordering and control of plant and materials. Programming of work and preparing progress reports Student Technician (Block Release system) Site Supervision, administration and survey Du Toits Kloof Tunnel Approach Roads, Bisho township services and Collector Road contracts. Workshop training Show less

Education

  • Cape Peninsula University of Technology
    National Higher Diploma, Civil Engineering Technology/Technician
    1985 - 1989

Community

You need to have a working account to view this content. Click here to join now