David Cox
Controls Leader at Kubica Corp- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
Topline Score
Bio
Experience
-
Kubica Corp
-
United States
-
Industrial Automation
-
1 - 100 Employee
-
Controls Leader
-
Jul 2019 - Present
-
-
Controls Engineer
-
Jun 2015 - Jul 2019
-
-
-
-
3D Designer and Prototype Management Assistant
-
Sep 2014 - Dec 2014
-- Engineering Coop Term -- Assisted with Prototype Camshaft Project Confirmed prototype part machining tolerances in QA labs Designed fixtures to aid in machining processes and QA confirmation testing Designed larger metal constructions to improve accessibility around machines -- Engineering Coop Term -- Assisted with Prototype Camshaft Project Confirmed prototype part machining tolerances in QA labs Designed fixtures to aid in machining processes and QA confirmation testing Designed larger metal constructions to improve accessibility around machines
-
-
-
-
3D Draftsman, Lab Assistant
-
Sep 2013 - Dec 2013
-- Engineering Coop Term -- Assisted with High Speed filming Modelled machine gun in 3D from individual piece drawings Designed basic control algorithm and system for a new trigger mechanism Performed and analysed erosion test on gun barrel Facilitated production test firing and miscellaneous lab tasks -- Engineering Coop Term -- Assisted with High Speed filming Modelled machine gun in 3D from individual piece drawings Designed basic control algorithm and system for a new trigger mechanism Performed and analysed erosion test on gun barrel Facilitated production test firing and miscellaneous lab tasks
-
-
-
Toyota Motor Manufacturing Canada
-
Canada
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Project Manager, Production Engineer
-
Jan 2013 - Apr 2013
-- Engineering Coop Term -- Managed several concurrent projects Scheduled contractor bids and walkthroughs Jig fabrication and delivery supervision Oversaw a $100,000 equipment installation project Planned and tested jig designs before implementation -- Engineering Coop Term -- Managed several concurrent projects Scheduled contractor bids and walkthroughs Jig fabrication and delivery supervision Oversaw a $100,000 equipment installation project Planned and tested jig designs before implementation
-
-
-
Ehvert Mission Critical
-
United States
-
Engineering Services
-
1 - 100 Employee
-
Project Manager, Designer
-
May 2012 - Aug 2012
-- Engineering Coop Term -- 3D Revit and AutoCAD Draftsman Devised heavy equipment structural support system Drafted raised floor system support configuration Site coordination and management of multi-discipline contractors Expedited shipments and contractor schedules -- Engineering Coop Term -- 3D Revit and AutoCAD Draftsman Devised heavy equipment structural support system Drafted raised floor system support configuration Site coordination and management of multi-discipline contractors Expedited shipments and contractor schedules
-
-
-
Rogers Communications
-
Canada
-
Telecommunications
-
700 & Above Employee
-
IPE Network Planning Assistant
-
Sep 2011 - Dec 2011
-- Engineering Coop Term -- Revised SpatialNet database with congestion relief changes Created BOM’s and Detailed Design Plans for new Rogers Business Customers Updated as-build drawings and site locations within database -- Engineering Coop Term -- Revised SpatialNet database with congestion relief changes Created BOM’s and Detailed Design Plans for new Rogers Business Customers Updated as-build drawings and site locations within database
-
-
-
-
Project Manager, Supervisor
-
Sep 2010 - Apr 2011
-- Engineering Coop Term --Trained new and existing employees Coordinated employee efforts on projects Managed new communication projects (fibre optic and coaxial) Supervised employees and provided solutions to problems Worked with clients to discuss requirements and expectations Drafted project solutions in AutoCAD Surveyed new job sites for current and prospective clients Analysed issues and provided safe and accurate solutions -- Engineering Coop Term --Trained new and existing employees Coordinated employee efforts on projects Managed new communication projects (fibre optic and coaxial) Supervised employees and provided solutions to problems Worked with clients to discuss requirements and expectations Drafted project solutions in AutoCAD Surveyed new job sites for current and prospective clients Analysed issues and provided safe and accurate solutions
-
-
-
-
Project Surveyor and Draftsman
-
Jan 2010 - Apr 2010
-- Engineering Coop Term --Trained new and existing employees Worked with clients to discuss requirements and expectations Drafted project solutions in AutoCAD Surveyed new job sites for current and prospective clients Analysed issues and provided safe and accurate solutions -- Engineering Coop Term --Trained new and existing employees Worked with clients to discuss requirements and expectations Drafted project solutions in AutoCAD Surveyed new job sites for current and prospective clients Analysed issues and provided safe and accurate solutions
-
-
Education
-
University of Waterloo
Bachelor of Applied Science (B.A.Sc.), Electrical Engineering