David Cairns

Electrician at ASP Ship Management
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Melbourne Area, AU
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • K-POS Maintenance Course
    Kongsberg Maritime
    Jun, 2017
    - Nov, 2024
  • Basic Offshore Safety Induction and Emergency Training (BOSIET)
    OPITO
    Jun, 2014
    - Nov, 2024
  • Industry High Voltage Operator
    National Energy Training Centre
    Jun, 1995
    - Nov, 2024
  • "A" Class Electrical Licence
    Office of the Chief Electrical Inspector - Victoria
    Jul, 2017
    - Nov, 2024
  • Further Offshore Emergency Training (FOET & CA-EBS)
    ERGT Australia - RTO 2534
    May, 2018
    - Nov, 2024
  • Maritime Security Identification Card (MSIC)
    Veritas Group
    Mar, 2018
    - Nov, 2024
  • Certificate of Competency - Electro Technical Officer
    Australian Maritime Safety Authority
    Dec, 2016
    - Nov, 2024

Experience

    • Australia
    • Maritime
    • 300 - 400 Employee
    • Electrician
      • Apr 2019 - Present

      SPIRIT of TASMANIA II 10/04/2019 to Current Ro-Ro Pasenger Ferry SPIRIT of TASMANIA II 10/04/2019 to Current Ro-Ro Pasenger Ferry

    • Australia
    • Maritime Transportation
    • 100 - 200 Employee
    • Electrical Technical Officer
      • Apr 2015 - Apr 2019

      BOURBON GANNET, SSV. - 03/12/2018 to 07/01/2019 Seismic Support, ATLANTIS DWELLER, M.P.V, DP2 - 02/07/2017 to 02/10/2018 D.P. Operations, Commissioning of Ichthys pipeline, IMPEX. MCDERMOTTS DLV2000, Pipe Layer. - 10/08/16 to current D.P. Operations, Placement of structures and interconnections / Ichthys Field, LEWEK CONSTELLATION, Pipe Layer. - 05/03/16 to 31/05/16 D.P. Operations, Placement of structures and interconnections / Julimar Field, Woodside DEEP ORIENT, Pipe Layer. - 06/10/15 to 24/10/15 D.P. Operations, Placement of umbilical for Technip / Wheatstone Field, Chevron BGP EXPLORER, Seismic - 04/08/15 to 05/09/15 3D seismic survey NW coast. BOURBON GREBE, SSV. - 26/06/2015 to 15/07/2015 Support vessel to the Viking Vision. JUMBO FAIRPLAYER, Heavy Lift - 15/04/2015 to 22/05/2015 D.P. Operations, Placement of structures for Technip / Wheatstone Field, Chevron Show less

    • Electrical Technical Officer
      • Mar 2014 - Feb 2015

      SKANDI ATLANTIC, A.H.T.S. - 30/01/2015 to 11/02/2015 Rig tow / D.P. Operations, Origin. LEWEK ANTARES, M.P.V. - 23/03/2014 to 23/01/2015 D.P. Operations, Apache Petroleum. SKANDI ATLANTIC, A.H.T.S. - 30/01/2015 to 11/02/2015 Rig tow / D.P. Operations, Origin. LEWEK ANTARES, M.P.V. - 23/03/2014 to 23/01/2015 D.P. Operations, Apache Petroleum.

    • Singapore
    • Maritime Transportation
    • 1 - 100 Employee
    • Electrical Technical Officer
      • Aug 2013 - Feb 2014

      LEWEK TEAL, A.H.T.S. - 27/08/2013 to 04/02/2014 D.P. Operations, Attwood Eagle, Woodside Petroleum, LEWEK TEAL, A.H.T.S. - 27/08/2013 to 04/02/2014 D.P. Operations, Attwood Eagle, Woodside Petroleum,

    • Electrical Technical Officer - Fleet
      • Mar 2013 - Jul 2013

      MERMAID STRAIT, PSV. - 04/06/2013 to 14/06/2013 Assist with replacement of current transformers for Siemens Generators. Assist with replacement of HFE transformers. MERMAID SOUND, PSV. - 25/05/2013 to 03/06/2013 Repair Miscellaneous Electrical Faults MERMAID SEARCHER, PSV. - 04/04/2013 to 10/04/2013 Diagnose and repair fault with Ships propulsion system. MERMAID LEVEQUE, PSV. - 21/03/2013 to 04/04/2013 Prepare vessel for Class Survey MERMAID STRAIT, PSV. - 04/06/2013 to 14/06/2013 Assist with replacement of current transformers for Siemens Generators. Assist with replacement of HFE transformers. MERMAID SOUND, PSV. - 25/05/2013 to 03/06/2013 Repair Miscellaneous Electrical Faults MERMAID SEARCHER, PSV. - 04/04/2013 to 10/04/2013 Diagnose and repair fault with Ships propulsion system. MERMAID LEVEQUE, PSV. - 21/03/2013 to 04/04/2013 Prepare vessel for Class Survey

    • Electrical Technical Officer
      • Jul 2011 - Jan 2013

      MERMAID LEVEQUE, PSV. - 08/10/2011 to 25/01/2013 D.P. Operations, Gorgon Project, Chevron. CREST ODYSSEY II, DSV. - 25/07/2011 to 16/11/2011 D.P. Operations, Seismic Survey, Scotts Reef, Woodside Petroleum. MERMAID LEVEQUE, PSV. - 08/10/2011 to 25/01/2013 D.P. Operations, Gorgon Project, Chevron. CREST ODYSSEY II, DSV. - 25/07/2011 to 16/11/2011 D.P. Operations, Seismic Survey, Scotts Reef, Woodside Petroleum.

    • Australia
    • Maritime Transportation
    • 200 - 300 Employee
    • Electrical Technical Officer
      • Dec 2010 - Jul 2011

      GO ALTAIR, PSV. - 06/07/2011 to 22/07/2011 Docked - Maintenance in preparation for ABS Survey Repair fault with Ships steering systems. Repair miscellaneous electrical faults. AQUILA EXPLORER, Seismic. - 29/04/2011 to 27/05/2011 Seismic Survey, BP Petroleum BOURBON OCEANTEAM 104, MPV. - 16/01/2011 to 16/02/2011 D.P. – Dive support / ROV / Construction, Turret repairs, Apache Petroleum. VERITAS VOYAGER, seismic. - 17/12/2010 to 06/01/2011 Seismic Survey GO ALTAIR, PSV. - 06/07/2011 to 22/07/2011 Docked - Maintenance in preparation for ABS Survey Repair fault with Ships steering systems. Repair miscellaneous electrical faults. AQUILA EXPLORER, Seismic. - 29/04/2011 to 27/05/2011 Seismic Survey, BP Petroleum BOURBON OCEANTEAM 104, MPV. - 16/01/2011 to 16/02/2011 D.P. – Dive support / ROV / Construction, Turret repairs, Apache Petroleum. VERITAS VOYAGER, seismic. - 17/12/2010 to 06/01/2011 Seismic Survey

  • Ellidan Electrical
    • Melbourne, Australia
    • Director/Master Electrician
      • Jun 2003 - Dec 2010

      Install and commission Ice bin – Bell Ice Install and commission hose extrusion line – Crusader Hose Refurbishment of Bethesda surgery – Epworth Hospital Refurbishment of day surgery – Epworth Hospital Install and commission Tobacco Processing Plant – Phillip Morris Installation of Packaging Plant – Costa Exchange Installation of Low Voltage Distribution Network for Packaging Plant – Costa Exchange Installation of Resin Curing Ovens - Boeing Installation of Rib Cell Ovens - Boeing Installation of Low Voltage Distribution Network for Building 1 - Boeing Relocation of Maintenance workshop & offices- Boeing Installation of No. 5 Tube Line – Impact Containers Maintenance – Body Shop - Toyota Maintenance – Press Shop - Toyota Maintenance – Casting Shop - Toyota Maintenance – Palmer Tube Mill Maintenance – Martin Bright Plant Show less

  • Kara Industrial Services
    • Melbourne, Australia
    • Industrial Electrician
      • May 2003 - Jun 2003

      Goodyear Tyre & Rubber - Installation of No. 10 Banbury Goodyear Tyre & Rubber - Installation of No. 10 Banbury

  • Online Personnel
    • Newport Railyard, Melbourne, Australia
    • Industrial Electrician
      • Dec 2002 - May 2003

      Siemens Rail Services - Modification & Commissioning of New Trains Siemens Rail Services - Modification & Commissioning of New Trains

  • OneSteel/Martin Bright Steel
    • Campbellfield, Victoria, Australia
    • Industrial Electrician - Leading Hand
      • Aug 2001 - Dec 2002

      Install and Maintain Plant and Equipment Maintain Siemens PLC controlled Plant Participate in the design and implementation of improvements and modifications Manage materials acquisition and inventory for electrical store. Install and Maintain Plant and Equipment Maintain Siemens PLC controlled Plant Participate in the design and implementation of improvements and modifications Manage materials acquisition and inventory for electrical store.

  • E.J.Lack Electrical
    • Kew, Victoria, Australia
    • Electrical Foreman
      • Feb 2001 - Aug 2001

      Domestic and commercial installations Allocate and co-ordinate work for tradesmen Domestic and commercial installations Allocate and co-ordinate work for tradesmen

  • South Pacific Tyres
    • Somerton, Victoria, Australia
    • Senior Electrician/Production Specialist/Area Manager
      • Jan 1983 - Dec 2000

      Oct 1997 to Jan 2001 Management Production Area Manager Jan 2000 to Jan 2001 Production Specialist Oct 1997 to Jan 2000 Achieve planned daily production targets Ensure daily production meets technical specifications Ensure adherence to all established safety policies, procedures and systems Contribute to the continuity and efficiency of plant operation Maximize opportunities for process and equipment improvements Develop “fixes” for process and equipment problems Ensure successful implementation of improvements and modifications Jan 1983 to Oct 1997 Electrical Mechanic Project Electrician 1991 to 1997 Electrical Mechanic 1987 to 1991 Apprentice Electrical Mechanic 1983 to 1987 Install and Maintain Plant and Equipment Maintain PLC controlled Plant Participate in the design and implementation of improvements and modifications Document machine downtime with computer based maintenance system Implement system to identify and eliminate repetitive downtime Show less

Education

  • Lalor North Secondary College
    Year 11 Leaving
    1978 - 1982

Community

You need to have a working account to view this content. Click here to join now