In charge of Site Services shop doing work for power companies ( SSE ), refurb work as site supervisor/AP4 on site strip out, to shop overhauling of valves , dispersal valves, fishpass gates and gearboxes,intake gates and gearboxes , emergency roller gates and gearboxes, stripping out and replacing MIV's , ASCV's. Fabrication of supporting steelwork and installation of band screens, installation of screen rake steekwork and machines, fabrication and installation of gates and any other refurb requirements. Scottish Power work as a CP, including screen replacement at Stonebyers and Bonnington intakes, screen rake cleaner overhaul work, Earlstoun and Carsfad intake gate overhaul incl. stripout and replacement of embedded brass seals and gate seals. hydraulic damper overhaul. MIV overhaul/refurb. for Glenlee power station. Shop fabrication work for eel exclusion screen steelwork. Show less
-
-
-
Isleburn Ltd/Global Energy Group
-
Evanton, Scotland
-
Utilities chargehand then supervisor then Snr. Superintendent
-
Aug 1990 - Present
working on and in charge of shop fabrications for the oil industry, producing pipe clamps, pig launchers, platforms, walkways, oil rig maintenance and replacements of mud room tank flooring, under deck pipework, steel work for rig load outs , winch strip down and maintenance. Power company SSE , refurb work as supervisor/AP4 on site strip out to shop overhauling of valves , dispersal valves, fishpass gates and gearboxes,intake gates and gearboxes , emergency roller gates and gearboxes, stripping out and replacing MIV's , ASCV's, Show less
-
-
-
Hi-Fab
-
Nigg, Scotland
-
Fabricator/Plater
-
Nov 1989 - Aug 1990
Working in fab shops on shell decks and BP miller job on fabrication of flare stacks, exhaust insulation lobster backs , general walkways, platforms, ladders, handrails,fabricating and fitting caissons for piping, prepping of sections in pipe mill. Working in fab shops on shell decks and BP miller job on fabrication of flare stacks, exhaust insulation lobster backs , general walkways, platforms, ladders, handrails,fabricating and fitting caissons for piping, prepping of sections in pipe mill.
-
-
-
Mackay & Macleod/Isleburn
-
Evanton, Scotland
-
Apprentice, fabricator/Chargehand
-
Apr 1981 - Nov 1989
Apprenticeship in Fabrication/welding of steel,stainless steel, aluminium. reading drawings, leading to setting out fabrications, welding, jig making, taking charge of jobs and men on various type of jobs from Distillery work fabricating tanks and fitting them, fabricating augers and conveyors, replacing pipework and weld repairs to plant, Aluminium smelter work, rig maintenance, setting out barge load out steel work,work for power companies. Apprenticeship in Fabrication/welding of steel,stainless steel, aluminium. reading drawings, leading to setting out fabrications, welding, jig making, taking charge of jobs and men on various type of jobs from Distillery work fabricating tanks and fitting them, fabricating augers and conveyors, replacing pipework and weld repairs to plant, Aluminium smelter work, rig maintenance, setting out barge load out steel work,work for power companies.
-
-