Daryl Burek

Manufacturing Engineer II at Graco High Pressure Equipment
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Sascha Ford

Working together with Daryl on a continuous automated storage project over the past several years, I cannot explain his level of experience and dedication and true care for his job. I can honestly say he’s one of the most devoted and skilled employees I’ve ever had the pleasure of working with. High Pressure is a very well lead facility, thanks to leadership from people like Daryl and Ed Saffron. They are very lucky to have him.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Manufacturing Engineer II
      • Oct 2017 - Present

      Plan and execute project/process requirements and provide production/assembly support at a manufacturing facility that produces high pressure valves, fittings, and tubing Plan and execute project/process requirements and provide production/assembly support at a manufacturing facility that produces high pressure valves, fittings, and tubing

  • Corry Manufacturing
    • Corry, Pennsylvania
    • Process Engineer
      • May 2017 - Oct 2017

      Determined operations to manufacture products and developed processes for the aerospace industry Determined operations to manufacture products and developed processes for the aerospace industry

    • Oil and Gas
    • 700 & Above Employee
    • Quality Control Supervisor
      • Oct 2013 - Jun 2015

      Directed and coordinated all operations in receiving, inspection, and non-conforming material departments at a manufacturing facility that produces precision measurement products for the oil industry.

    • Sales Engineer
      • May 2013 - Oct 2013

      Worked with international customers to verify correct equipment, application, and specifications, for precision oil and gas measurement systems.

    • United States
    • Consumer Goods
    • 700 & Above Employee
    • Manufacturing Engineer
      • Jan 2011 - Jun 2011

      Coordinated process improvement efforts while providing manufacturing/assembly support at a facility that produced foam and foam products.

    • Shift Manager
      • Sep 2010 - Jan 2011

      Solely ran all off-shift operations which included the safety, fabrication, technical, shipping, customer service, and quality departments at a facility that produced foam and foam products.

    • United States
    • Glass, Ceramics and Concrete Manufacturing
    • 700 & Above Employee
    • Manufacturing Supervisor
      • Jun 2008 - Jun 2010

      Directed and coordinated ceramic tile manufacturing operations. Directed and coordinated ceramic tile manufacturing operations.

Education

  • Penn State Erie, The Behrend College
    Bachelor's degree, Mechanical Engineering
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now